Bridge Statistics for Curtiss, Wisconsin (WI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 112ft / 34.0mTotal length
  • $832,000Total costs
  • 25,126Total average daily traffic
  • 97Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Curtiss
  • No street view available for this location

New bridges in Curtiss, WI - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 31990-1999
  • 52000-2009
Average Bridge Daily Traffic in Curtiss, WI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 11.1%Good
  • 44.4%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Excellent
  • 77.8%Very good
  • 11.1%Satisfactory
Find on map >>   Show street view

Structure Number: B100105,  Location: 0.3M N JCT CTH A (Lat: 45.007272,  Lng: -90.434069),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 979 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,076 (year 2040),  Design Load: HS 20,  Features Intersected: N. FK. POPPLE RIVER,  Facility Carried by Structure: CTH E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Very good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $563,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B100154,  Location: 2.4M E JCT CTH E (Lat: 44.916508,  Lng: -90.387600),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 97 (year 2019),  Average Future Daily Traffic: 106 (year 2039),  Design Load: HS 20,  Features Intersected: E. FORK POPPLE RIVER,  Facility Carried by Structure: LRD EDDY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B10017,  Location: 2.4M W JCT STH 73 TO S (Lat: 44.942558,  Lng: -90.642411),  Route carried "on" structure: State highway 29,  Year Built: 1996,  Status: Open,  Structure Length: 9.90m (32.48ft),  Average Daily Traffic: 7,500 (year 2019),  Average Future Daily Traffic: 7,500 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B100179,  Location: VILLAGE OF CURTISS (Lat: 44.943625,  Lng: -90.433711),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 2,000 (year 2019),  Average Future Daily Traffic: 5,850 (year 2040),  Design Load: HS 20,  Features Intersected: STH 29,  Facility Carried by Structure: CTH E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B100183,  Location: 0.7M S JCT CTH N (Lat: 44.892353,  Lng: -90.406769),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 417 (year 2019),  Average Future Daily Traffic: 458 (year 2039),  Design Load: HS 20,  Features Intersected: KESLER CREEK,  Facility Carried by Structure: CTH Q
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B100185,  Location: TOWN OF MAYVILLE (Lat: 45.001997,  Lng: -90.425233),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 3.28m (10.76ft),  Average Daily Traffic: 978 (year 2019),  Average Future Daily Traffic: 1,075 (year 2039),  Design Load: HS 20,  Features Intersected: N FORK POPPLE RIVER,  Facility Carried by Structure: CTH A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B100383,  Location: 1.7M E JCT CTH E (Lat: 44.916647,  Lng: -90.402828),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 2.27m (7.45ft),  Average Daily Traffic: 104 (year 2019),  Average Future Daily Traffic: 114 (year 2039),  Design Load: H 20,  Features Intersected: E. FK. POPPLE RIVER,  Facility Carried by Structure: LRD EDDY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P100059,  Location: 0.8M W JCT CTH Q (Lat: 44.901342,  Lng: -90.421514),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 777 (year 2019),  Average Future Daily Traffic: 854 (year 2039),  Design Load: H 20,  Features Intersected: E FK POPPLE RIVER,  Facility Carried by Structure: CTH N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P100069,  Location: 0.2M S JCT CTH A (Lat: 44.999475,  Lng: -90.417322),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 1.88m (6.17ft),  Average Daily Traffic: 58 (year 2019),  Average Future Daily Traffic: 63 (year 2039),  Features Intersected: POPPLE RIVER,  Facility Carried by Structure: LRD CATLIN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $269,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P100904,  Location: 1.8M S JCT STH 29 (Lat: 44.919789,  Lng: -90.397372),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 116 (year 2019),  Average Future Daily Traffic: 127 (year 2039),  Design Load: H 15,  Features Intersected: S. FK. POPPLE RIVER,  Facility Carried by Structure: LRD SANDHILL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.1m (23.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B100179,  Location: 3.1M E OF JCT CTHP (Lat: 44.943625,  Lng: -90.433711),  Route carried "under" structure: State highway 29,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 12,100 (year 2019),  Features Intersected: STH 29,  Facility Carried by Structure: CTH E
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)