Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Days Creek, Oregon (OR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 157ft / 48.2mTotal length
  • $1,169,000Total costs
  • 17,092Total average daily traffic
  • 2,071Total average daily truck traffic
  • 19,367Total future (year 2025) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Days Creek
  • No street view available for this location

New bridges in Days Creek, OR - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 61950-1959
  • 41960-1969
  • 21980-1989
  • 22000-2009
Average Bridge Daily Traffic in Days Creek, OR
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Good
  • 53.3%Satisfactory
  • 26.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Very good
  • 26.7%Good
  • 53.3%Satisfactory
  • 13.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Good
  • 13.3%Satisfactory
  • 66.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Good
  • 25.0%Satisfactory
  • 43.8%Fair
  • 6.3%Poor
Find on map >>   Show street view

Structure Number: L1439312,  Location: 3.2 miles S of Hwy 227 (M (Lat: 42.902500,  Lng: -123.151939),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1966,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 20 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 35 (year 2040),  Design Load: HS 20,  Features Intersected: SHIVELY CREEK,  Facility Carried by Structure: 30 S 04 W 22.00:
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.158,  Lanes on structure: 1,  Owner: Bureau of Land Management,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: L1439317,  Location: 3.2 miles S of Hwy 227 (M (Lat: 42.915839,  Lng: -123.148081),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1980,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 20 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 35 (year 2040),  Design Load: HS 20,  Features Intersected: SHIVELY CREEK,  Facility Carried by Structure: 31 S 04 W 02.01:
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Bureau of Land Management,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: L2014804,  Location: 2.2 miles S of Tiller Tra (Lat: 42.941389,  Lng: -123.172781),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 2005,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 35 (year 2040),  Design Load: HS 20,  Features Intersected: Beals Creek,  Facility Carried by Structure: 30 S 04 W 21.00:
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: Bureau of Land Management,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 19C038001800829,  Location: 8.3 MI E OF MYRTLE CREEK (Lat: 43.035525,  Lng: -123.148333),  Route carried "on" structure: County highway A382,  Year Built: 1939,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 680 (year 2025),  Design Load: H 20,  Features Intersected: LOUIS CREEK,  Facility Carried by Structure: COUNTY RD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.341,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C039001800882,  Location: 8.8 MI E OF MYRTLE CREEK (Lat: 43.035914,  Lng: -123.138328),  Route carried "on" structure: County highway A382,  Year Built: 1961,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 514 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 579 (year 2025),  Design Load: H 20,  Features Intersected: SOUTH MYRTLE CREEK,  Facility Carried by Structure: COUNTY RD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.194,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C04000180092,  Location: 9.2 MI E OF MYRTLE CREEK (Lat: 43.034514,  Lng: -123.131133),  Route carried "on" structure: County highway A382,  Year Built: 1961,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 471 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 531 (year 2025),  Design Load: H 20,  Features Intersected: SOUTH MYRTLE CREEK,  Facility Carried by Structure: COUNTY RD 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.806,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C046003400122,  Location: 1.2 MI NE OF DAYS CREEK (Lat: 42.981347,  Lng: -123.145089),  Route carried "on" structure: County highway C0034,  Year Built: 1952,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 493 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 558 (year 2025),  Design Load: H 20,  Features Intersected: DAYS CREEK,  Facility Carried by Structure: DAYS CR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 10.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 19C047003400162,  Location: 1.6 MI NE OF DAYS CREEK (Lat: 42.982781,  Lng: -123.137917),  Route carried "on" structure: County highway C0034,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 479 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 544 (year 2025),  Design Load: H 20,  Features Intersected: DAYS CREEK,  Facility Carried by Structure: DAYS CR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 14.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 19C048003400241,  Location: 2.4 MI NE OF DAYS CREEK (Lat: 42.984736,  Lng: -123.122967),  Route carried "on" structure: County highway C0034,  Year Built: 1956,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 246 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 276 (year 2025),  Design Load: H 20,  Features Intersected: DAYS CREEK,  Facility Carried by Structure: DAYS CR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.879,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C049003400375,  Location: 3.8 MI NE OF DAYS CREEK (Lat: 42.988508,  Lng: -123.100089),  Route carried "on" structure: County highway C0034,  Year Built: 1956,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 157 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 177 (year 2025),  Design Load: H 20,  Features Intersected: DAYS CREEK,  Facility Carried by Structure: DAYS CR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.035,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C089009200001,  Location: 1.0 MI NE OF DAYS CREEK (Lat: 42.980744,  Lng: -123.149706),  Route carried "on" structure: County highway C0092,  Year Built: 1954,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 188 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 213 (year 2025),  Design Load: H 20,  Features Intersected: DAYS CREEK,  Facility Carried by Structure: WOODS CR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C36600940024,  Location: 3.0 MI S OF DAYS CREEK (Lat: 42.945411,  Lng: -123.170642),  Route carried "on" structure: County highway C0094,  Year Built: 1961,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 612 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 692 (year 2025),  Design Load: H 20,  Features Intersected: BEALS CREEK,  Facility Carried by Structure: SHIVELY CR RD CR94
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 19C470 1 67,  Location: 3.0 MI E OF CANYONVILLE (Lat: 42.958486,  Lng: -123.232108),  Route carried "on" structure: County highway A410,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,497 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,087 (year 2025),  Design Load: H 20,  Features Intersected: A SMALL CREEK,  Facility Carried by Structure: COUNTY RD 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.783,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $74,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $118,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19C471 1 1031,  Location: 0.5 MI W OF DAYS CREEK PO (Lat: 42.972847,  Lng: -123.171908),  Route carried "on" structure: County highway A0410,  Year Built: 1989,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 4,214 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,764 (year 2025),  Design Load: HS 25 or greater,  Features Intersected: SOUTH UMPQUA RIVER,  Facility Carried by Structure: TILLER-TRAIL HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.592,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: October 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19C498 42 882,  Location: 5.0 MI E OF CANYONVILLE (Lat: 42.971261,  Lng: -123.214100),  Route carried "on" structure: County highway C0042,  Year Built: 1925,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 364 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 414 (year 2025),  Design Load: HS 20,  Features Intersected: SOUTH UMPQUA RIVER,  Facility Carried by Structure: DAYS CR CUT-OFF RD
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 14.194,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $1,050,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 20317 000 01061,  Location: 0.2 MI W OF DAYS CREEK PO (Lat: 42.972261,  Lng: -123.166511),  Route carried "on" structure: County highway A0410,  Year Built: 2005,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 4,197 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,747 (year 2025),  Design Load: HL 93,  Features Intersected: DAYS CREEK,  Facility Carried by Structure: TILLER-TRAIL HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.075,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Days Creek, Oregon (OR) on our hugely popular Oregon forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.