Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dayton, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 154ft / 46.5mTotal length
  • $1,000Total costs
  • 278,455Total average daily traffic
  • 27,668Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dayton
  • No street view available for this location

New bridges in Dayton, MN - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 21980-1989
  • 12000-2009
  • 22010-2019
  • 22020-2022
Average Bridge Daily Traffic in Dayton, MN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1006,  Location: 7.4 MI NE OF JCT TH 169 (Lat: 46.598764,  Lng: -93.612883),  Route carried "on" structure: State highway 210,  Year Built: 1984,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 4,754 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,700 (year 2039),  Design Load: HS 20,  Features Intersected: RICE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2549,  Location: 0.2 MI N OF JCT CSAH 14 (Lat: 45.201047,  Lng: -93.332536),  Route carried "on" structure: County highway 18,  Year Built: 1988,  Status: Open,  Structure Length: 4.00m (13.12ft),  Average Daily Traffic: 13,700 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,700 (year 2039),  Design Load: H 20,  Features Intersected: COON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19904,  Location: 4.0 MI S OF JCT 3 (Lat: 44.681372,  Lng: -93.293236),  Route carried "on" structure: Interstate 35,  Year Built: 2004,  Status: Open,  Structure Length: 5.99m (19.65ft),  Average Daily Traffic: 33,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,000 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: 185th ST W (CSAH 60)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27417,  Location: 0.6 MI SE TH 94;CSAH 101 (Lat: 45.158153,  Lng: -93.513342),  Route carried "on" structure: City street 108,  Year Built: 2021,  Status: Open,  Structure Length: 7.27m (23.85ft),  Average Daily Traffic: 1 (year 2021),  Average Future Daily Traffic: 19,000 (year 2040),  Design Load: HL 93,  Features Intersected: I 94
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.8m (117.5ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27554,  Location: AT W CO LINE IN DAYTON (Lat: 45.244386,  Lng: -93.522300),  Route carried "on" structure: County highway 12,  Year Built: 1973,  Status: Open,  Structure Length: 9.83m (32.25ft),  Average Daily Traffic: 5,200 (year 2017),  Average Future Daily Traffic: 5,200 (year 2039),  Design Load: HS 20,  Features Intersected: CROW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.4m (106.3ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 27946,  Location: 2.7 MI SE OF JCT TH 101 (Lat: 45.163769,  Lng: -93.521453),  Route carried "on" structure: County highway 101,  Year Built: 1969,  Status: Open,  Structure Length: 12.59m (41.31ft),  Average Daily Traffic: 7,500 (year 2017),  Average Future Daily Traffic: 7,500 (year 2039),  Design Load: HS 20,  Features Intersected: I 94
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.9m (124.3ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 27B87,  Location: 1.0 MI S OF JCT CSAH 81 (Lat: 45.154472,  Lng: -93.521789),  Route carried "on" structure: County highway 101,  Year Built: 2014,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 7,500 (year 2017),  Average Future Daily Traffic: 7,500 (year 2039),  Design Load: HL 93,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27C53,  Location: 1.5 MI E OF JCT CSAH 121 (Lat: 45.163169,  Lng: -93.436639),  Route carried "on" structure: County highway 202,  Year Built: 2019,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 800 (year 2018),  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: HL 93,  Features Intersected: ELM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8817,  Location: 1.8 MI NW OF JCT CSAH 12 (Lat: 45.153192,  Lng: -93.493539),  Route carried "on" structure: County highway 81,  Year Built: 1954,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 15,500 (year 2017),  Average Future Daily Traffic: 15,500 (year 2039),  Design Load: H 20,  Features Intersected: RUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $161,000,000
Find on map >>   Show street view

Structure Number: 27417,  Location: 0.6 MI SE TH 94;CSAH 101 (Lat: 45.158153,  Lng: -93.513342),  Route carried "under" structure: Interstate 94,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 95,000 (year 2019),  Truck Traffic: 12%,  Features Intersected: I 94,  Facility Carried by Structure: MSAS 108
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.8m (117.5ft)

Find on map >>   Show street view

Structure Number: 27946,  Location: 2.7 MI SE OF JCT TH 101 (Lat: 45.163769,  Lng: -93.521453),  Route carried "under" structure: Interstate 94,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 95,000 (year 2019),  Truck Traffic: 12%,  Features Intersected: I 94,  Facility Carried by Structure: CSAH 101
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.9m (124.3ft)

Discuss Dayton, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.