Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Deming, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 312ft / 95.4mTotal length
  • $60,594,000Total costs
  • 123,318Total average daily traffic
  • 11,260Total average daily truck traffic
  • 171,699Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Deming
  • No street view available for this location

New bridges in Deming, WA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21930-1939
  • 81940-1949
  • 51950-1959
  • 11960-1969
  • 21990-1999
  • 12000-2009
  • 42010-2019
Reconstructed bridges in Deming, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 21960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Deming, WA
Average Bridge Truck Traffic in Deming, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.4%Very good
  • 52.2%Good
  • 17.4%Satisfactory
  • 4.3%Fair
  • 8.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.0%Very good
  • 56.5%Good
  • 26.1%Satisfactory
  • 4.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.0%Very good
  • 65.2%Good
  • 17.4%Satisfactory
  • 4.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Very good
  • 12.5%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 3011B,  Location: 0.1 N JCT SR 542 (Lat: 48.843667,  Lng: -122.288833),  Route carried "on" structure: State highway 9,  Year Built: 1945,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 4,005 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,751 (year 2039),  Design Load: HS 15,  Features Intersected: OVERFLOW CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 135.233,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $816,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3078A,  Location: 0.5 N JCT SR 542 (Lat: 48.849722,  Lng: -122.288333),  Route carried "on" structure: State highway 9,  Year Built: 1946,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 4,005 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,751 (year 2039),  Design Load: HS 15,  Features Intersected: SMITH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 135.925,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $984,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3486A,  Location: 0.2 E JCT SR 9 (Lat: 48.843556,  Lng: -122.283417),  Route carried "on" structure: State highway 542,  Year Built: 1948,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 9,987 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,341 (year 2039),  Design Load: HS 20,  Features Intersected: OVERFLOW CHANNEL NO 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.464,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $571,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,142,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3486B,  Location: 0.6 E JCT SR 9 (Lat: 48.843500,  Lng: -122.275500),  Route carried "on" structure: State highway 542,  Year Built: 1948,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 9,190 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,196 (year 2039),  Design Load: HS 20,  Features Intersected: SMITH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.043,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3486C,  Location: 1.3 E JCT SR 9 (Lat: 48.841528,  Lng: -122.260833),  Route carried "on" structure: State highway 542,  Year Built: 1948,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 9,190 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,196 (year 2039),  Design Load: HS 20,  Features Intersected: SMITH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.169,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3486D,  Location: 1.5 E JCT SR 9 (Lat: 48.839825,  Lng: -122.257261),  Route carried "on" structure: State highway 542,  Year Built: 1948,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 9,190 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,196 (year 2039),  Design Load: HS 20,  Features Intersected: MCCAULEY CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.491,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $880,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3486E,  Location: 1.7 E JCT SR 9 (Lat: 48.838444,  Lng: -122.254361),  Route carried "on" structure: State highway 542,  Year Built: 1948,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,393 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,052 (year 2039),  Design Load: HS 20,  Features Intersected: MCCAULEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.765,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $880,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3910A,  Location: 3.1 E JCT SR 9 (Lat: 48.848583,  Lng: -122.161250),  Route carried "on" structure: State highway 542,  Year Built: 1951,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 5,211 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,482 (year 2039),  Design Load: HS 15,  Features Intersected: BELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.405,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $722,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,444,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4281D,  Location: 9.7 N SKAGIT CO (Lat: 48.779194,  Lng: -122.200056),  Route carried "on" structure: State highway 9,  Year Built: 1952,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,325 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 4,774 (year 2039),  Design Load: HS 15,  Features Intersected: BLACK SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.163,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $403,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4328B,  Location: 10.0 N SKAGIT CO (Lat: 48.781861,  Lng: -122.194833),  Route carried "on" structure: State highway 9,  Year Built: 1900,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 3,325 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 4,774 (year 2039),  Design Load: HS 15,  Features Intersected: BLACK SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 123.694,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,056,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4542A,  Location: 12.0 N SKAGIT CO (Lat: 48.808778,  Lng: -122.199639),  Route carried "on" structure: State highway 9,  Year Built: 1954,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 3,978 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,712 (year 2039),  Design Load: HS 20,  Features Intersected: N FK NOOKSACK RIVER
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 126.929,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $3,280,000,  Roadway Improvement Cost: $656,000,  Total Project Cost: $6,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15410A,  Location: 9.7 E JCT I-5 (Lat: 48.841450,  Lng: -122.294150),  Route carried "on" structure: State highway 542,  Year Built: 1999,  Status: Open,  Structure Length: 28.35m (93.01ft),  Average Daily Traffic: 11,246 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,149 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NOOKSACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.546,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 61.9m (203.1ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.35m (93.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $8,370,000,  Roadway Improvement Cost: $1,674,000,  Total Project Cost: $16,740,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15410B,  Location: 9.9 E JCT I-5 (Lat: 48.842900,  Lng: -122.290217),  Route carried "on" structure: State highway 542,  Year Built: 1999,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 11,246 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,149 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: OVERFLOW CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.997,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,368,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17941A,  Location: 1.5 E JCT SR 9 (Lat: 48.828611,  Lng: -122.177083),  Route carried "on" structure: State highway 542,  Year Built: 2010,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,211 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,482 (year 2039),  Design Load: HL 93,  Features Intersected: NOOKSACK TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.862,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $282,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 19380A,  Location: 11.0 N SKAGIT CO (Lat: 48.796722,  Lng: -122.190944),  Route carried "on" structure: State highway 9,  Year Built: 2019,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,325 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 4,774 (year 2039),  Design Load: HL 93,  Features Intersected: TAWES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 125.416,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $422,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82332,  Location: 00.4 W VALLEY HWY (Lat: 48.788333,  Lng: -122.201300),  Route carried "on" structure: County highway 89800,  Year Built: 1934,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 575 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 800 (year 2040),  Design Load: H 20,  Features Intersected: SLOUGH,  Facility Carried by Structure: POTTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,307,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $2,614,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82333,  Location: 01.9 W VALLEY HWY (Lat: 48.782269,  Lng: -122.218725),  Route carried "on" structure: County highway 89630,  Year Built: 1969,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 194 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 300 (year 2041),  Design Load: H 20,  Features Intersected: FALLS CREEK,  Facility Carried by Structure: HILLSIDE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8283,  Location: 00.1 S LAWRENCE RD. (Lat: 48.855811,  Lng: -122.293969),  Route carried "on" structure: County highway 65000,  Year Built: 1955,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 150 (year 2042),  Design Load: H 20,  Features Intersected: SMITH CR,  Facility Carried by Structure: LIND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83626,  Location: 00.1 N MT BAKER HWY (Lat: 48.843333,  Lng: -122.276667),  Route carried "on" structure: County highway 68510,  Year Built: 1958,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 56 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 100 (year 2039),  Design Load: H 20,  Features Intersected: SMITH CR,  Facility Carried by Structure: PUTNAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $273,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83627,  Location: 01.0 SE MT BAKER HY (Lat: 48.836494,  Lng: -122.254992),  Route carried "on" structure: County highway 68600,  Year Built: 1946,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,112 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,500 (year 2043),  Design Load: H 15,  Features Intersected: SMITH CREEK OVERFLOW,  Facility Carried by Structure: DEMING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,429,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $2,858,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84761,  Location: 00.2 W N. FORK RD. (Lat: 48.838333,  Lng: -122.153333),  Route carried "on" structure: Spur County highway 84190,  Year Built: 1930,  Year Reconstructed: 1965,  Status: Posted for load-capacity,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 800 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,200 (year 2043),  Design Load: H 20,  Features Intersected: NORTH FORK,  Facility Carried by Structure: MOSQUITO LK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $3,344,000,  Roadway Improvement Cost: $669,000,  Total Project Cost: $6,688,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87392,  Location: 0.2 W OF SAND ROAD (Lat: 48.832581,  Lng: -122.338306),  Route carried "on" structure: County highway 55080,  Year Built: 2005,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 4,147 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,000 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: ANDERSON CREEK,  Facility Carried by Structure: SMITH RD E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $958,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $1,915,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88759,  Location: 0.3 W HWY 9 (Lat: 48.789081,  Lng: -122.199419),  Route carried "on" structure: County highway 89800,  Year Built: 2015,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 557 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 870 (year 2039),  Design Load: HL 93,  Features Intersected: SOUTH FORK NOOKSACK,  Facility Carried by Structure: POTTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 71.0m (232.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.97m (35.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,160,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $4,320,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88941,  Location: 0.1 west of Elder Road (Lat: 48.819425,  Lng: -122.164028),  Route carried "on" structure: County highway 14760,  Year Built: 2017,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 15,000 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,000 (year 2039),  Design Load: HL 93,  Features Intersected: JORDAN CREEK,  Facility Carried by Structure: SLATER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,310,000,  Roadway Improvement Cost: $462,000,  Total Project Cost: $4,621,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Deming, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.