  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 203ft / 62.5mTotal length
  • $14,481,000Total costs
  • 41,008Total average daily traffic
  • 3,920Total average daily truck traffic
  • 65,614Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dewey
  • No street view available for this location

New bridges in Dewey, OK - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11970-1979
  • 41980-1989
  • 61990-1999
  • 52000-2009
  • 22020-2022
Average Bridge Daily Traffic in Dewey, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 72.7%Very good
  • 18.2%Good
  • 9.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 45.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 47.4%Very good
  • 31.6%Good
  • 21.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 50.0%Good
  • 37.5%Satisfactory
Find on map >>   Show street view

Structure Number: 8666,  Location: 1.8 E 4. N OF US 60 (Lat: 36.800453,  Lng: -95.902469),  Route carried "on" structure: County highway 7454C,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 991 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,586 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $285,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18126,  Location: 1. N 2.1 W OF US 75 (Lat: 36.800553,  Lng: -95.973267),  Route carried "on" structure: County highway 7414C,  Year Built: 1971,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 910 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,456 (year 2040),  Features Intersected: CANEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.513,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.91m (39.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $953,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19903,  Location: 0.3 MI E OF US 75 (Lat: 36.785986,  Lng: -95.931367),  Route carried "on" structure: County highway 7404,  Year Built: 1981,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 515 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 824 (year 2040),  Design Load: HS 20,  Features Intersected: DEER CREEK,  Facility Carried by Structure: 7453C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.73m (12.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 20558,  Location: 1.3 MI E OF US 75 (Lat: 36.785978,  Lng: -95.912125),  Route carried "on" structure: County highway 7404,  Year Built: 1983,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 295 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 472 (year 2040),  Design Load: HS 20,  Features Intersected: COON CREEK,  Facility Carried by Structure: 7453C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.12m (26.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $644,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20568,  Location: 3 MI N JCT US 60 E (Lat: 36.782156,  Lng: -95.935192),  Route carried "on" structure: US 75,  Year Built: 1983,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 14,700 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,520 (year 2040),  Design Load: HS 20,  Features Intersected: COON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.985,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,013,000,  Roadway Improvement Cost: $3,321,000,  Total Project Cost: $5,636,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20572,  Location: 3. N 1.4 W OF US 75 (Lat: 36.829553,  Lng: -95.960433),  Route carried "on" structure: County highway 7409,  Year Built: 1983,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 311 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 498 (year 2040),  Design Load: HS 20,  Features Intersected: CANEY RIVER,  Facility Carried by Structure: 7436C MAJOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.597,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 61.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.79m (35.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $862,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 22882,  Location: 4. N 2.6 N OF US 60 (Lat: 36.800444,  Lng: -95.891514),  Route carried "on" structure: County highway 7454C,  Year Built: 1991,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 991 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,586 (year 2040),  Design Load: HS 20,  Features Intersected: COON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $696,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2338,  Location: .3 MI E WASHINGTON BLV (Lat: 36.771525,  Lng: -95.948319),  Route carried "on" structure: County highway 6140,  Year Built: 1992,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: COON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $705,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23389,  Location: 4. S .2 W OF US 75 (Lat: 36.844167,  Lng: -95.921667),  Route carried "on" structure: County highway E0120,  Year Built: 1993,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 59.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.71m (18.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $466,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 25026,  Location: 7.5 MI N JCT US 60 E (Lat: 36.837203,  Lng: -95.934992),  Route carried "on" structure: US 75,  Year Built: 1997,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 10,900 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,440 (year 2040),  Design Load: HS 20,  Features Intersected: POST OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.085,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $1,016,000,  Total Project Cost: $1,725,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 25123,  Location: 3.5 E 5. N OF US 60 (Lat: 36.814903,  Lng: -95.871972),  Route carried "on" structure: County highway 7416C,  Year Built: 1997,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: COON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.298,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $618,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 25626,  Location: 1. W 1.7 N OF US 75 (Lat: 36.810744,  Lng: -95.953239),  Route carried "on" structure: County highway N3960,  Year Built: 1999,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CO. RD. N396
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 26892,  Location: 1.4 MI. W. OF US 75 (Lat: 36.800556,  Lng: -95.960511),  Route carried "on" structure: County highway E0150,  Year Built: 2003,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,400 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 26893,  Location: .8 MI. WEST OF US 75 (Lat: 36.800525,  Lng: -95.950261),  Route carried "on" structure: County highway E0150,  Year Built: 2003,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,400 (year 2040),  Features Intersected: CREEK,  Facility Carried by Structure: W. 9TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 2755,  Location: 2.3N 2.3W OF DEWEY (Lat: 36.829564,  Lng: -95.972819),  Route carried "on" structure: County highway E0130,  Year Built: 2005,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 950 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,520 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 59.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27551,  Location: 2.3N 1.5W OF DEWEY (Lat: 36.829531,  Lng: -95.963842),  Route carried "on" structure: County highway E0130,  Year Built: 2005,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 950 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,520 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 28265,  Location: 1. N .4 E OF US 75 (Lat: 36.800556,  Lng: -95.928611),  Route carried "on" structure: County highway E0150,  Year Built: 2009,  Status: Open,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 2,095 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,352 (year 2040),  Design Load: HS 20,  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $541,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31897,  Location: 1E .75N of DEWEY (Lat: 36.810650,  Lng: -95.917161),  Route carried "on" structure: County highway N3980,  Year Built: 2020,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,200 (year 2040),  Features Intersected: DEER CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.777,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 31898,  Location: 1E .5N of DEWEY (Lat: 36.807722,  Lng: -95.917161),  Route carried "on" structure: County highway N3980,  Year Built: 2020,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,200 (year 2040),  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.296,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place