Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dix, Nebraska (NE)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 112ft / 33.8mTotal length
  • 39,820Total average daily traffic
  • 23,744Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dix
  • No street view available for this location

New bridges in Dix, NE - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21950-1959
  • 41970-1979
  • 21980-1989
  • 21990-1999
Reconstructed bridges in Dix, NE - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Dix, NE
Average Bridge Truck Traffic in Dix, NE
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 75.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 75.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Very good
  • 40.0%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: C00531572,  Location: 2W .7N OF DIX (Lat: 41.248300,  Lng: -103.526700),  Route carried "on" structure: County highway 157,  Year Built: 1985,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 100 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 170 (year 2033),  Features Intersected: DRY CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: C00531612,  Location: JCT I80/L-53A 3.4S (Lat: 41.170600,  Lng: -103.491700),  Route carried "on" structure: County highway 1015,  Year Built: 1989,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 125 (year 2011),  Average Future Daily Traffic: 125 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S030 03162,  Location: 1E DIX (Lat: 41.234300,  Lng: -103.474900),  Route carried "on" structure: US 30,  Year Built: 1932,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 820 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,066 (year 2038),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.089,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: S080 02775,  Location: 2W DIX INTERCHG (Lat: 41.221200,  Lng: -103.528800),  Route carried "on" structure: County highway 57,  Year Built: 1973,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 20 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 26 (year 2033),  Design Load: HS 20,  Features Intersected: I80,  Facility Carried by Structure: RD 55E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S080 02842,  Location: 1W DIX INTERCHG (Lat: 41.221100,  Lng: -103.515800),  Route carried "on" structure: Interstate 80,  Year Built: 1955,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,845 (year 2018),  Truck Traffic: 62%,  Average Future Daily Traffic: 7,845 (year 2038),  Design Load: HS 20,  Features Intersected: LODGEPOLE CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.574,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: S080 02976,  Location: DIX INTERCHG (Lat: 41.220900,  Lng: -103.490100),  Route carried "on" structure: Spur State highway L53A,  Year Built: 1996,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 440 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 572 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: I80,  Facility Carried by Structure: LINK 53A & RD 59E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.019,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 03052,  Location: 1E DIX INTERCHG (Lat: 41.221300,  Lng: -103.475500),  Route carried "on" structure: Interstate 80,  Year Built: 1955,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 7,800 (year 2018),  Truck Traffic: 62%,  Average Future Daily Traffic: 7,800 (year 2038),  Design Load: HS 20,  Features Intersected: LODGEPOLE CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.912,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: S080 03171,  Location: 2E DIX INTERCHG (Lat: 41.222300,  Lng: -103.452800),  Route carried "on" structure: County highway 65,  Year Built: 1973,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 20 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 26 (year 2033),  Design Load: H 20,  Features Intersected: I80,  Facility Carried by Structure: RD 63E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S080 02775,  Location: 2W DIX INTERCHG (Lat: 41.221200,  Lng: -103.528800),  Route carried "under" structure: Interstate 80,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,470 (year 2013),  Truck Traffic: 62%,  Features Intersected: I80,  Facility Carried by Structure: RD 55E
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 4.466,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: S080 02976,  Location: DIX INTERCHG (Lat: 41.220900,  Lng: -103.490100),  Route carried "under" structure: Interstate 80,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 7,590 (year 2013),  Truck Traffic: 61%,  Features Intersected: I80,  Facility Carried by Structure: LINK 53A & RD 59E
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 4.789,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: S080 03171,  Location: 2E DIX INTERCHG (Lat: 41.222300,  Lng: -103.452800),  Route carried "under" structure: Interstate 80,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 7,590 (year 2013),  Truck Traffic: 61%,  Features Intersected: I80,  Facility Carried by Structure: RD 63E
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 5.103,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Dix, Nebraska (NE) on our hugely popular Nebraska forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.