  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 1,017ft / 310mTotal length
  • $97,127,000Total costs
  • 1,333,866Total average daily traffic
  • 29,088Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Emerson
  • No street view available for this location

New bridges in Emerson, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 71950-1959
  • 101970-1979
  • 21990-1999
  • 12000-2009
  • 52010-2019
Reconstructed bridges in Emerson, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Emerson, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 96.3%Good
  • 3.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 85.2%Good
  • 3.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.7%Very good
  • 77.8%Good
  • 18.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Very good
  • 28.6%Good
  • 28.6%Satisfactory
Find on map >>   Show street view

Structure Number: 150001,  Location: 2.7 MI S OF EMERSON (Lat: 34.090719,  Lng: -84.739578),  Route carried "on" structure: US 41,  Year Built: 1951,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 15,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,620 (year 2031),  Design Load: HS 20,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,004,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,506,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150002,  Location: 2.7 MI S OF EMERSON (Lat: 34.090628,  Lng: -84.739750),  Route carried "on" structure: US 41,  Year Built: 1951,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 15,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,620 (year 2031),  Design Load: HS 20,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,289,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150003,  Location: IN SOUTH EMERSON (Lat: 34.111039,  Lng: -84.749778),  Route carried "on" structure: US 41,  Year Built: 1951,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 15,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,620 (year 2031),  Design Load: HS 20,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $766,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,149,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150004,  Location: IN SOUTH EMERSON (Lat: 34.111119,  Lng: -84.749969),  Route carried "on" structure: US 41,  Year Built: 1951,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 15,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,620 (year 2031),  Design Load: HS 20,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,178,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150005,  Location: IN SOUTH EMERSON (Lat: 34.122347,  Lng: -84.749919),  Route carried "on" structure: US 41,  Year Built: 1951,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 12,130 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,195 (year 2032),  Design Load: HS 20,  Features Intersected: SR 293- CSX RR (340429D)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 36 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150006,  Location: IN SOUTH EMERSON (Lat: 34.122439,  Lng: -84.750158),  Route carried "on" structure: US 41,  Year Built: 1951,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 11,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,970 (year 2031),  Design Load: HS 20,  Features Intersected: SR 293- CSX RR (340429D)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 36 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150007,  Location: 1.8 MI SE OF CARTERSVILLE (Lat: 34.153447,  Lng: -84.771169),  Route carried "on" structure: US 41,  Year Built: 1953,  Status: Open,  Structure Length: 13.66m (44.82ft),  Average Daily Traffic: 16,290 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 24,435 (year 2031),  Design Load: HS 20,  Features Intersected: CR 361- ETOWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $2,705,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $4,058,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150058,  Location: 3.7 MI SE OF EMERSON (Lat: 34.087358,  Lng: -84.712608),  Route carried "on" structure: City street 9028,  Year Built: 1949,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 5,340 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,010 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ALLATOONA CREEK (LAKE),  Facility Carried by Structure: OLD STATE RT. 293
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $926,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,389,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150061,  Location: 2 MI SE OF CARTERSVILLE (Lat: 34.146678,  Lng: -84.771228),  Route carried "on" structure: State highway 293,  Year Built: 1928,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 13.72m (45.01ft),  Average Daily Traffic: 6,790 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,185 (year 2031),  Design Load: H 15,  Features Intersected: ETOWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $1,758,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $2,637,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150077,  Location: 3.6 MI SE OF EMERSON (Lat: 34.088408,  Lng: -84.712900),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 43.56m (142.91ft),  Average Daily Traffic: 83,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 125,460 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR645-CR397-ALLATOONA LK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 452.226,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 19 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $7,106,000,  Roadway Improvement Cost: $711,000,  Total Project Cost: $10,659,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150078,  Location: 3.6 MI SE OF EMERSON (Lat: 34.088139,  Lng: -84.712828),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 38.62m (126.71ft),  Average Daily Traffic: 83,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 125,460 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR645-CR397-ALLATOONA LK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 452.226,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 19 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $6,301,000,  Roadway Improvement Cost: $630,000,  Total Project Cost: $9,451,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150079,  Location: 3.1 MI SE OF EMERSON (Lat: 34.091019,  Lng: -84.723958),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 83,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 125,460 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 427 JOE STELLA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.835,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $806,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15008,  Location: 3.1 MI SE OF EMERSON (Lat: 34.090908,  Lng: -84.724258),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 83,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 125,460 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 427 JOE STELLA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.835,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $910,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,365,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150081,  Location: 1.1 MI SE OF EMERSON (Lat: 34.118608,  Lng: -84.739228),  Route carried "on" structure: Interstate 75,  Year Built: 1976,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 88,590 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 132,885 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 397 ALLATOONA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 457.054,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,397,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,096,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150082,  Location: 1.1 MI SE OF EMERSON (Lat: 34.118758,  Lng: -84.739689),  Route carried "on" structure: Interstate 75,  Year Built: 1976,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 83,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 124,995 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 397 ALLATOONA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 457.054,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,372,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,059,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150083,  Location: 2.7 MI E OF CARTERSVILLE (Lat: 34.158069,  Lng: -84.752039),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 84,630 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 126,945 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-914
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.882,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $786,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,179,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150084,  Location: 2.7 MI E OF CARTERSVILLE (Lat: 34.157889,  Lng: -84.752300),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 84,630 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 126,945 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-914
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.882,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $786,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,179,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150085,  Location: 2.6 MI E OF CARTERSVILLE (Lat: 34.160058,  Lng: -84.753747),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 78,730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 118,095 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ETOWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.882,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $2,984,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $4,476,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150086,  Location: 2.6 MI E OF CARTERSVILLE (Lat: 34.160128,  Lng: -84.754219),  Route carried "on" structure: Interstate 75,  Year Built: 1977,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 78,730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 118,095 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ETOWAH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.882,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $2,984,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $4,476,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 150137,  Location: 2.6 MI S OF EMERSON (Lat: 34.095100,  Lng: -84.732919),  Route carried "on" structure: County highway 1666,  Year Built: 1992,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 5,340 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,010 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PUMPKINVINE CREEK,  Facility Carried by Structure: OLD STATE RT. 293
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $996,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,495,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 150138,  Location: IN SOUTH EMERSON (Lat: 34.101058,  Lng: -84.737278),  Route carried "on" structure: County highway 1666,  Year Built: 1992,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 1,780 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,670 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PUMPKINVINE CREEK,  Facility Carried by Structure: OLD STATE RT. 293
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $879,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,319,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155113,  Location: 1.9 MI SW OF EMERSON (Lat: 34.102739,  Lng: -84.766669),  Route carried "on" structure: County highway 365,  Year Built: 2002,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PUMPKINVINE CREEK,  Facility Carried by Structure: PUCKETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $315,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 155134,  Location: 3 MI SOUTH OF CARTISVILLE (Lat: 34.138728,  Lng: -84.749733),  Route carried "on" structure: State highway 1665,  Year Built: 2010,  Status: Open,  Structure Length: 13.99m (45.90ft),  Average Daily Traffic: 7,030 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,545 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 3 (US 41),  Facility Carried by Structure: RED TOP MOUNTAIN R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,793,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $2,690,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155135,  Location: 3 MI SOUTH OF CARTERSVILL (Lat: 34.138881,  Lng: -84.749981),  Route carried "on" structure: State highway 1665,  Year Built: 2010,  Status: Open,  Structure Length: 13.99m (45.90ft),  Average Daily Traffic: 7,030 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,545 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: US 41 / SR 3,  Facility Carried by Structure: RED TOP MOUNTAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,793,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $2,690,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155136,  Location: 1 MI NORTH OF EMERSON (Lat: 34.133458,  Lng: -84.759503),  Route carried "on" structure: State highway 1000,  Year Built: 2010,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 11,200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,330 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SR 293 AND CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,715,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $2,573,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155137,  Location: 1 MI N OF EMERSON (Lat: 34.133644,  Lng: -84.759625),  Route carried "on" structure: State highway 1000,  Year Built: 2010,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 11,200 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,000 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SR 293 AND CSX RAIL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,715,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $2,573,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 155152,  Location: 0.9 MILES EAST OF EMERSON (Lat: 34.122031,  Lng: -84.742697),  Route carried "on" structure: County highway 9999,  Year Built: 2019,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 38,600 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 43,600 (year 2034),  Design Load: HS 20,  Features Intersected: CSX RAILROAD (340734N),  Facility Carried by Structure: LAKE POINT PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.05m (26.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $19,536,000,  Roadway Improvement Cost: $1,954,000,  Total Project Cost: $29,304,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 150005,  Location: IN SOUTH EMERSON (Lat: 34.122347,  Lng: -84.749919),  Route carried "under" structure: State highway 293,  Structure Length: 0. m,  Average Daily Traffic: 6,800 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 3 NBL (US 41),  Facility Carried by Structure: SR 3 - US 41 (NBL)
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150006,  Location: IN SOUTH EMERSON (Lat: 34.122439,  Lng: -84.750158),  Route carried "under" structure: State highway 293,  Structure Length: 0. m,  Average Daily Traffic: 6,800 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 3 SBL (US 41),  Facility Carried by Structure: SR 3 - US 41 (SBL)
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150007,  Location: 1.8 MI SE OF CARTERSVILLE (Lat: 34.153447,  Lng: -84.771169),  Route carried "under" structure: County highway 361,  Structure Length: 0. m,  Average Daily Traffic: 740 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 3 (US 41),  Facility Carried by Structure: SR 3 /US 41
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150077,  Location: 3.6 MI SE OF EMERSON (Lat: 34.088408,  Lng: -84.712900),  Route carried "under" structure: County highway 397,  Structure Length: 0. m,  Average Daily Traffic: 1,270 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 NBL,  Facility Carried by Structure: I-75 (NBL)
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 8.047,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150077,  Location: 3.6 MI SE OF EMERSON (Lat: 34.088408,  Lng: -84.712900),  Route carried "under" structure: ServiceCounty highway 645,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 1996),  Truck Traffic: 1%,  Features Intersected: I-75 NBL,  Facility Carried by Structure: I-75 (NBL)
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150078,  Location: 3.6 MI SE OF EMERSON (Lat: 34.088139,  Lng: -84.712828),  Route carried "under" structure: County highway 397,  Structure Length: 0. m,  Average Daily Traffic: 1,270 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 SBL,  Facility Carried by Structure: I-75 (SBL)
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 8.047,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150078,  Location: 3.6 MI SE OF EMERSON (Lat: 34.088139,  Lng: -84.712828),  Route carried "under" structure: ServiceCounty highway 645,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2009),  Truck Traffic: 1%,  Features Intersected: I-75 SBL,  Facility Carried by Structure: I-75 (SBL)
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150079,  Location: 3.1 MI SE OF EMERSON (Lat: 34.091019,  Lng: -84.723958),  Route carried "under" structure: County highway 427,  Structure Length: 0. m,  Average Daily Traffic: 420 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 NBL,  Facility Carried by Structure: I-75 (NBL)
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 15008,  Location: 3.1 MI SE OF EMERSON (Lat: 34.090908,  Lng: -84.724258),  Route carried "under" structure: County highway 427,  Structure Length: 0. m,  Average Daily Traffic: 420 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 SBL,  Facility Carried by Structure: I-75 (SBL)
Minimum Vertical Clearance: 8.12m (26.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150081,  Location: 1.1 MI SE OF EMERSON (Lat: 34.118608,  Lng: -84.739228),  Route carried "under" structure: County highway 397,  Structure Length: 0. m,  Average Daily Traffic: 1,270 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 NBL,  Facility Carried by Structure: I-75 (NBL)
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150082,  Location: 1.1 MI SE OF EMERSON (Lat: 34.118758,  Lng: -84.739689),  Route carried "under" structure: County highway 397,  Structure Length: 0. m,  Average Daily Traffic: 4,450 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 SBL,  Facility Carried by Structure: I-75 (SBL)
Minimum Vertical Clearance: 6.70m (21.98ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150083,  Location: 2.7 MI E OF CARTERSVILLE (Lat: 34.158069,  Lng: -84.752039),  Route carried "under" structure: City street 914,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 NBL,  Facility Carried by Structure: I-75 (NBL)
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150084,  Location: 2.7 MI E OF CARTERSVILLE (Lat: 34.157889,  Lng: -84.752300),  Route carried "under" structure: City street 914,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 SBL,  Facility Carried by Structure: I-75 (SBL)
Minimum Vertical Clearance: 6.01m (19.72ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150124,  Location: 1.5 MI NE OF EMERSON (Lat: 34.142589,  Lng: -84.738939),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 74,900 (year 1999),  Truck Traffic: 12%,  Features Intersected: S-1665 RED TOP MTN ROAD,  Facility Carried by Structure: RED TOP MTN. ROAD
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 458.663,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150129,  Location: 1 MI SE OF EMERSON (Lat: 34.121497,  Lng: -84.740358),  Route carried "under" structure: Ramp Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 70,800 (year 1995),  Truck Traffic: 1%,  Features Intersected: I-75 RAMP SB,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 457.054,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 150129,  Location: 1 MI SE OF EMERSON (Lat: 34.121497,  Lng: -84.740358),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 83,330 (year 2011),  Truck Traffic: 1%,  Features Intersected: I-75, NB & SB RAMPS,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 7.08m (23.23ft),  Kilometerpoint: 457.054,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 155081,  Location: 1 MI NW OF EMERSON (Lat: 34.143678,  Lng: -84.764919),  Route carried "under" structure: City street 914,  Structure Length: 0. m,  Average Daily Traffic: 850 (year 2011),  Truck Traffic: 1%,  Features Intersected: M-914,  Facility Carried by Structure: CSX RR (340431E)
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 155134,  Location: 3 MI SOUTH OF CARTISVILLE (Lat: 34.138728,  Lng: -84.749733),  Route carried "under" structure: US 41,  Structure Length: 0. m,  Average Daily Traffic: 13,360 (year 2008),  Truck Traffic: 10%,  Features Intersected: OLD ALABAMA ROAD,  Facility Carried by Structure: RED TOP MOUNTAIN R
Minimum Vertical Clearance: 8.43m (27.66ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 155135,  Location: 3 MI SOUTH OF CARTERSVILL (Lat: 34.138881,  Lng: -84.749981),  Route carried "under" structure: US 41,  Structure Length: 0. m,  Average Daily Traffic: 13,360 (year 2008),  Truck Traffic: 10%,  Features Intersected: TEMP. SR 1000,  Facility Carried by Structure: RED TOP MOUNTAIN
Minimum Vertical Clearance: 9.62m (31.56ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 155136,  Location: 1 MI NORTH OF EMERSON (Lat: 34.133458,  Lng: -84.759503),  Route carried "under" structure: State highway 293,  Structure Length: 0. m,  Average Daily Traffic: 11,200 (year 2008),  Truck Traffic: 10%,  Features Intersected: SR 1000,  Facility Carried by Structure: TEMP SR 1000 NBL
Minimum Vertical Clearance: 18.74m (61.48ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 155137,  Location: 1 MI N OF EMERSON (Lat: 34.133644,  Lng: -84.759625),  Route carried "under" structure: State highway 293,  Structure Length: 0. m,  Average Daily Traffic: 11,200 (year 2008),  Truck Traffic: 10%,  Features Intersected: TEMP SR1000,  Facility Carried by Structure: TEMP SR 1000
Minimum Vertical Clearance: 20.70m (67.91ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Length of Maximum Span: 0.0m