Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Ann, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 121ft / 37.4mTotal length
  • $21,108,000Total costs
  • 48,540Total average daily traffic
  • 6,952Total average daily truck traffic
  • 54,861Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Ann
  • No street view available for this location

New bridges in Fort Ann, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31940-1949
  • 31950-1959
  • 31980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Fort Ann, NY
Average Bridge Truck Traffic in Fort Ann, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Excellent
  • 30.0%Very good
  • 30.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.7%Very good
  • 20.0%Good
  • 26.7%Satisfactory
  • 20.0%Fair
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 50.0%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 100109,  Location: 0.25 MI N JCT RTS 4 & 149 (Lat: 43.417319,  Lng: -73.486944),  Route carried "on" structure: US 4,  Year Built: 1994,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 9,403 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 10,535 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HALFWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.315,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,181,000,  Roadway Improvement Cost: $692,000,  Total Project Cost: $1,873,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103843,  Location: 3.6 MI NE OF QUEENSBURY (Lat: 43.408606,  Lng: -73.558686),  Route carried "on" structure: State highway 149,  Year Built: 1941,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,168 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,031 (year 2040),  Design Load: H 20,  Features Intersected: HADLOCK PD OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.747,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Good,  Culverts: Fair,  Inventory Rating: 98.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $292,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103844,  Location: 4.65 MI NE OF QUEENSBURY (Lat: 43.404256,  Lng: -73.538444),  Route carried "on" structure: State highway 149,  Year Built: 1941,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 7,168 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,031 (year 2040),  Design Load: H 20,  Features Intersected: HADLOCK PD OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 84.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $256,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103845,  Location: 5.5 MI NE OF QUEENSBURY (Lat: 43.407453,  Lng: -73.521367),  Route carried "on" structure: State highway 149,  Year Built: 1953,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 7,168 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,031 (year 2040),  Design Load: H 20,  Features Intersected: HALFWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.916,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $456,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103846,  Location: 0.1 MI W JCT RTES 4 & 149 (Lat: 43.414458,  Lng: -73.493097),  Route carried "on" structure: State highway 149,  Year Built: 1953,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 7,168 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 8,031 (year 2040),  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.378,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $196,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107123,  Location: JCT SH22 & US4 - COMSTOCK (Lat: 43.457233,  Lng: -73.443650),  Route carried "on" structure: State highway 22,  Year Built: 1980,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 3,670 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,914 (year 2040),  Design Load: HS 20,  Features Intersected: DELAWARE & HUDSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.244,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $822,000,  Total Project Cost: $2,225,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225738,  Location: FORT ANN-FARLEY ROAD (Lat: 43.394864,  Lng: -73.557156),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 117 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 164 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: HALFWAY BROOK,  Facility Carried by Structure: FARLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $272,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 320364,  Location: 1.3 MI NNW FORT ANN (Lat: 43.420733,  Lng: -73.515006),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 143 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 200 (year 2037),  Design Load: H 15,  Features Intersected: HALFWAY CREEK,  Facility Carried by Structure: GOODMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $524,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 320365,  Location: 1.5 MI NW FORT ANN (Lat: 43.434264,  Lng: -73.503786),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 238 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 333 (year 2037),  Features Intersected: HALFWAY BROOK,  Facility Carried by Structure: WEST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $248,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330582,  Location: 2 MI NE FORT ANN (Lat: 43.435972,  Lng: -73.448350),  Route carried "on" structure: Other road ,  Year Built: 1929,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 277 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 388 (year 2037),  Design Load: H 20,  Features Intersected: WINCHELL CREEK,  Facility Carried by Structure: CLAY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.328,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $459,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3306,  Location: 2 MI SW FORT ANN (Lat: 43.401167,  Lng: -73.522678),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 81 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 113 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: HALFWAY BROOK,  Facility Carried by Structure: MATTISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $369,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $585,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330624,  Location: 1 MILE NW OF FORT ANN (Lat: 43.426947,  Lng: -73.496894),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 617 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 864 (year 2038),  Design Load: HL 93,  Features Intersected: HALFWAY CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $813,000,  Roadway Improvement Cost: $476,000,  Total Project Cost: $1,288,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 330631,  Location: VILLAGE OF FORT ANN (Lat: 43.417214,  Lng: -73.488800),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 881 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,233 (year 2038),  Features Intersected: MUD CREEK,  Facility Carried by Structure: CO RD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $180,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 337115,  Location: .5 EAST OF ROUTE 149 (Lat: 43.412525,  Lng: -73.548450),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 143 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 200 (year 2037),  Features Intersected: HADLOCK POND OUTLET,  Facility Carried by Structure: GOODMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $706,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 401712,  Location: RT22 OVER CHAMPLAIN CANAL (Lat: 43.456967,  Lng: -73.440706),  Route carried "on" structure: State highway 22,  Year Built: 1985,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 3,670 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,914 (year 2040),  Design Load: HS 20,  Features Intersected: CHAMPLAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.954,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.4m (21.0ft), Horizontal Clearance: 31.6m (103.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 96.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $2,659,000,  Roadway Improvement Cost: $1,557,000,  Total Project Cost: $4,217,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 441807,  Location: IN FORT ANN (Lat: 43.413803,  Lng: -73.485208),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 628 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 879 (year 2037),  Design Load: HL 93,  Features Intersected: CHAMPLAIN CANAL,  Facility Carried by Structure: CLAY HILL ROAD
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.0m (16.4ft), Horizontal Clearance: 22.9m (75.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 70.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $4,624,000,  Roadway Improvement Cost: $2,708,000,  Total Project Cost: $7,331,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Fort Ann, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.