Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Sumner, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 121ft / 37.4mTotal length
  • $1,624,000Total costs
  • 23,600Total average daily traffic
  • 3,971Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Sumner
  • No street view available for this location

New bridges in Fort Sumner, NM - historical statistics
  • New bridges - historical statistics
  • 61930-1939
  • 21950-1959
  • 11960-1969
  • 11990-1999
  • 12010-2019
Reconstructed bridges in Fort Sumner, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Fort Sumner, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 75.0%Good
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 401-FS1,  Location: 12 miles NW of Ft Sumner (Lat: 34.607389,  Lng: -104.389800),  Route carried "on" structure: ServiceFederal lands road 203,  Year Built: 1936,  Status: Posted for load,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 50 (year 2006),  Average Future Daily Traffic: 50 (year 2035),  Design Load: HS 20,  Features Intersected: Sumner Dam Spillway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Bureau of Reclamation,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.0m,  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 13.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 212,  Location: 4.6 MI E US-60 @ MP-332.1 (Lat: 34.447947,  Lng: -104.172142),  Route carried "on" structure: County highway 11048,  Year Built: 1933,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,379 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,462 (year 2038),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY,  Facility Carried by Structure: 11-C048
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $28,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 2122,  Location: 0.6 MI E OF JCT US-84 (Lat: 34.468550,  Lng: -104.235619),  Route carried "on" structure: US 60,  Year Built: 1934,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,931 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 528.137,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $698,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 2575,  Location: 1.7 MI E OF JCT US-84 (Lat: 34.462781,  Lng: -104.217689),  Route carried "on" structure: US 60,  Year Built: 1933,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,220 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,485 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 529.927,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 2576,  Location: 2.18 MI E OF JCT US-84 (Lat: 34.460400,  Lng: -104.210331),  Route carried "on" structure: US 60,  Year Built: 1933,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,220 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,485 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 530.599,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 6112,  Location: 0.61 MI E NM-20/FT SUMNER (Lat: 34.476000,  Lng: -104.254800),  Route carried "on" structure: US 60,  Year Built: 1958,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 1,375 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,997 (year 2040),  Design Load: HS 20,  Features Intersected: LAS TRUCHAS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 526.159,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $440,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6933,  Location: 1.1 MI N OF JCT US-60 (Lat: 34.488783,  Lng: -104.245650),  Route carried "on" structure: US 84,  Year Built: 1968,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 2,419 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,867 (year 2040),  Design Load: HS 20,  Features Intersected: LAS TRUCHAS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $458,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9057,  Location: 0.28 MI E OF NM-20 (Lat: 34.473747,  Lng: -104.259558),  Route carried "on" structure: US 60,  Year Built: 1999,  Status: Open,  Structure Length: 18.07m (59.28ft),  Average Daily Traffic: 1,375 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,997 (year 2040),  Design Load: HS 20,  Features Intersected: PECOS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 525.563,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2266,  Location: 0.4 Mi N of Jct US-60 (Lat: 34.476903,  Lng: -104.245436),  Route carried "under" structure: US 84,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 2,765 (year 2020),  Truck Traffic: 16%,  Features Intersected: US-84,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.61m (15.12ft),  Kilometerpoint: 113.555,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 5823,  Location: 1.1 MI W OF JCT NM-20 (Lat: 34.469100,  Lng: -104.278600),  Route carried "under" structure: US 60,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 352 (year 2020),  Truck Traffic: 20%,  Features Intersected: US-60,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 523.285,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 9787,  Location: 1.1 MI W OF JCT NM-20 (Lat: 34.469139,  Lng: -104.278769),  Route carried "under" structure: US 60,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 352 (year 2020),  Truck Traffic: 20%,  Features Intersected: US-60,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 523.520,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Fort Sumner, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.