Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Franklin, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 518ft / 158mTotal length
  • $32,585,000Total costs
  • 48,760Total average daily traffic
  • 2,693Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Franklin
  • No street view available for this location

New bridges in Franklin, GA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 31970-1979
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Franklin, GA
Average Bridge Truck Traffic in Franklin, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 90.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Very good
  • 70.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 90.0%Good
  • 10.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 50.0%Good
  • 8.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 1490001,  Location: 0.1 MI N OF TROUP CO LINE (Lat: 33.194811,  Lng: -85.024742),  Route carried "on" structure: US 27,  Year Built: 1974,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 4,140 (year 2011),  Truck Traffic: 21%,  Average Future Daily Traffic: 6,210 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: POTATO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $633,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $949,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1490003,  Location: IN FRANKLIN (Lat: 33.278139,  Lng: -85.101358),  Route carried "on" structure: State highway 329,  Year Built: 1941,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 21.34m (70.01ft),  Average Daily Traffic: 7,020 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,530 (year 2031),  Design Load: H 15,  Features Intersected: CHATTAHOOCHEE RIVER,  Facility Carried by Structure: FRANKLIN PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $4,227,000,  Roadway Improvement Cost: $423,000,  Total Project Cost: $6,340,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1490004,  Location: 1 MI N OF FRANKLIN (Lat: 33.299139,  Lng: -85.102008),  Route carried "on" structure: County highway 329,  Year Built: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5,100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,650 (year 2031),  Design Load: H 15,  Features Intersected: CENTRALHATCHEE CRK TRIB,  Facility Carried by Structure: FRANKLIN PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1490008,  Location: FRANKLIN CITY LIMITS (Lat: 33.288878,  Lng: -85.087278),  Route carried "on" structure: State highway 34,  Year Built: 1936,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 3,180 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,770 (year 2031),  Design Load: H 15,  Features Intersected: CHATTAHOOCHEE RIV TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.54m (31.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1490009,  Location: 1.5 MI NE OF FRANKLIN (Lat: 33.292078,  Lng: -85.082289),  Route carried "on" structure: State highway 34,  Year Built: 1937,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 3,180 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,770 (year 2031),  Design Load: H 15,  Features Intersected: LUMPKIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.54m (31.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1490026,  Location: 1 MI S OF FRANKLIN (Lat: 33.255628,  Lng: -85.116678),  Route carried "on" structure: County highway 2808,  Year Built: 1973,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 740 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,110 (year 2032),  Design Load: HS 15,  Features Intersected: HILLABAHATACHEE CREEK,  Facility Carried by Structure: BEVIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $996,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1490027,  Location: 1.2 MI N OF FRANKLIN (Lat: 33.311108,  Lng: -85.104608),  Route carried "on" structure: County highway 329,  Year Built: 1990,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 5,100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,650 (year 2031),  Design Load: HS 20,  Features Intersected: CENTRALHATCHEE CREEK,  Facility Carried by Structure: FRANKLIN PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,108,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1490029,  Location: 1 MI W OF FRANKLIN (Lat: 33.280158,  Lng: -85.119500),  Route carried "on" structure: State highway 34,  Year Built: 1990,  Status: Open,  Structure Length: 19.20m (62.99ft),  Average Daily Traffic: 2,420 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,630 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HILLABAHATACHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,462,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $3,692,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 149003,  Location: 4 MI E OF FRANKLIN (Lat: 33.311039,  Lng: -85.053839),  Route carried "on" structure: State highway 34,  Year Built: 1990,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3,180 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,770 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HARRIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 1495031,  Location: 2 MI W OF FRANKLIN (Lat: 33.277597,  Lng: -85.144658),  Route carried "on" structure: County highway 141,  Year Built: 1979,  Status: Posted for load,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 15,  Features Intersected: HILLABAHATACHEE CREEK,  Facility Carried by Structure: RED LAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1495051,  Location: 0.9 MI NE OF FRANKLIN (Lat: 33.289908,  Lng: -85.088539),  Route carried "on" structure: US 27,  Year Built: 2006,  Status: Open,  Structure Length: 43.01m (141.11ft),  Average Daily Traffic: 3,950 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,925 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 34/CHATTAHOCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $5,513,000,  Roadway Improvement Cost: $551,000,  Total Project Cost: $8,270,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1495052,  Location: 0.9 MI NE OF FRANKLIN (Lat: 33.289900,  Lng: -85.088769),  Route carried "on" structure: US 27,  Year Built: 2006,  Status: Open,  Structure Length: 43.01m (141.11ft),  Average Daily Traffic: 3,950 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,925 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 34/CHATTAHOCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $5,513,000,  Roadway Improvement Cost: $551,000,  Total Project Cost: $8,270,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1495051,  Location: 0.9 MI NE OF FRANKLIN (Lat: 33.289908,  Lng: -85.088539),  Route carried "under" structure: State highway 34,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2011),  Truck Traffic: 15%,  Features Intersected: SR 1,  Facility Carried by Structure: SR 1/ US 27 NBL
Minimum Vertical Clearance: 6.62m (21.72ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1495052,  Location: 0.9 MI NE OF FRANKLIN (Lat: 33.289900,  Lng: -85.088769),  Route carried "under" structure: State highway 34,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2011),  Truck Traffic: 10%,  Features Intersected: SR 1,  Facility Carried by Structure: SR 1/ US 27 SBL
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Franklin, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.