Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for French Creek, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 95ft / 28.6mTotal length
  • $21,010,000Total costs
  • 4,366Total average daily traffic
  • 477Total average daily truck traffic
  • 5,005Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for French Creek
  • No street view available for this location

New bridges in French Creek, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21950-1959
  • 11960-1969
  • 11970-1979
  • 11990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Truck Traffic in French Creek, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Excellent
  • 20.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 18.2%Good
  • 63.6%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 102981,  Location: 0.6 MI E PENNA STATE LINE (Lat: 42.021258,  Lng: -79.751114),  Route carried "on" structure: State highway 474,  Year Built: 1934,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 787 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 794 (year 2040),  Features Intersected: HERRICK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $411,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104836,  Location: 1 MI N JCT RTS 426 & 474 (Lat: 42.038406,  Lng: -79.699111),  Route carried "on" structure: State highway 426,  Year Built: 1999,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,023 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,033 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BEAVER MEADOW BRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.068,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $312,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 104837,  Location: 3.8 MI N JCT RTS 426+ 474 (Lat: 42.061922,  Lng: -79.716464),  Route carried "on" structure: State highway 426,  Year Built: 1931,  Year Reconstructed: 1992,  Status: Posted for load-capacity,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 1,023 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,033 (year 2040),  Design Load: HS 20,  Features Intersected: FRENCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.606,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,726,000,  Roadway Improvement Cost: $1,596,000,  Total Project Cost: $4,322,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221254,  Location: AT FRENCH CREEK (Lat: 42.068500,  Lng: -79.702303),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load-capacity,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 16 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 22 (year 2040),  Features Intersected: TRIB FRENCH CREEK,  Facility Carried by Structure: CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $427,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332462,  Location: 1.3 MI NE OF FRENCH CREEK (Lat: 42.082628,  Lng: -79.686328),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 185 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 259 (year 2037),  Design Load: HS 20,  Features Intersected: FRENCH CREEK,  Facility Carried by Structure: COUNTY ROAD 322
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.446,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,247,000,  Roadway Improvement Cost: $730,000,  Total Project Cost: $1,977,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 332463,  Location: 0.8 MI NE OF FRENCH CREEK (Lat: 42.079517,  Lng: -79.695831),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 286 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 400 (year 2037),  Design Load: HS 20,  Features Intersected: FRENCH CREEK,  Facility Carried by Structure: COUNTY ROAD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,619,000,  Roadway Improvement Cost: $948,000,  Total Project Cost: $2,566,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332465,  Location: .3 MI SW OF FRENCH CREEK (Lat: 42.067164,  Lng: -79.707447),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 304 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 426 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: French Creek,  Facility Carried by Structure: KING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 55.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,745,000,  Roadway Improvement Cost: $1,022,000,  Total Project Cost: $2,767,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332466,  Location: 2.6 MI SW OF FRENCH CREEK (Lat: 42.036675,  Lng: -79.727608),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 137 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 192 (year 2037),  Features Intersected: FRENCH CREEK,  Facility Carried by Structure: MARVIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,323,000,  Roadway Improvement Cost: $775,000,  Total Project Cost: $2,097,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332467,  Location: 3.9 MI SW OF FRENCH CREEK (Lat: 42.024450,  Lng: -79.746939),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 26 (year 2017),  Average Future Daily Traffic: 36 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: FRENCH CREEK,  Facility Carried by Structure: WHITE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,009,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332468,  Location: AT FRENCH CREEK-CO RD 322 (Lat: 42.068619,  Lng: -79.702650),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 286 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 400 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: TRIB FRENCH CREEK,  Facility Carried by Structure: COUNTY ROAD 322
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,253,000,  Roadway Improvement Cost: $734,000,  Total Project Cost: $1,987,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336258,  Location: 2.0 SW OF FRENCH CREEK (Lat: 42.044989,  Lng: -79.725892),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 293 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 410 (year 2037),  Features Intersected: FRENCH CREEK,  Facility Carried by Structure: OLD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $1,977,000,  Roadway Improvement Cost: $1,158,000,  Total Project Cost: $3,135,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss French Creek, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.