Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gibsonton, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 351ft / 107mTotal length
  • $239,000Total costs
  • 219,931Total average daily traffic
  • 22,333Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gibsonton
  • No street view available for this location

New bridges in Gibsonton, FL - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 21950-1959
  • 11960-1969
  • 11970-1979
  • 41980-1989
Reconstructed bridges in Gibsonton, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Gibsonton, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 100044,  Location: 1.5 MI SOUTH ALAFIA RIVER (Lat: 27.837981,  Lng: -82.381850),  Route carried "on" structure: US 41,  Year Built: 1960,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 6.18m (20.28ft),  Average Daily Traffic: 17,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,362 (year 2041),  Design Load: HS 20,  Features Intersected: BULLFROG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.006,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $239,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100045,  Location: 7.5 MILES SOUTH OF SR-60 (Lat: 27.859508,  Lng: -82.383700),  Route carried "on" structure: US 41,  Year Built: 1959,  Status: Open,  Structure Length: 37.06m (121.59ft),  Average Daily Traffic: 17,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,362 (year 2041),  Design Load: H 20,  Features Intersected: ALAFIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.252,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Navigation Control: Yes ( Vertical Clearance: 9.1m (29.9ft), Horizontal Clearance: 14.9m (48.9ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 0.0m,  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100046,  Location: 3.3MI SOUTH OF SR-676 (Lat: 27.877461,  Lng: -82.392486),  Route carried "on" structure: US 41,  Year Built: 1943,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 30,000 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 52,050 (year 2041),  Design Load: H 15,  Features Intersected: ARCHIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.617,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 100600,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 100106,  Location: 1.5 MI S OF ALAFIA RIVER (Lat: 27.838031,  Lng: -82.381650),  Route carried "on" structure: US 41,  Year Built: 1945,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 17,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,362 (year 2041),  Design Load: HS 20,  Features Intersected: BULLFROG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.015,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100107,  Location: 7.5 MILES S OF SR-60 (Lat: 27.859656,  Lng: -82.383600),  Route carried "on" structure: US 41,  Year Built: 1952,  Status: Open,  Structure Length: 37.06m (121.59ft),  Average Daily Traffic: 17,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,362 (year 2041),  Design Load: H 20,  Features Intersected: ALAFIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.252,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Navigation Control: Yes ( Vertical Clearance: 9.1m (29.9ft), Horizontal Clearance: 14.9m (48.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 22,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100373,  Location: 0.7 MI NORTH OF SYMMES RD (Lat: 27.844444,  Lng: -82.347783),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 12.64m (41.47ft),  Average Daily Traffic: 56,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 98,028 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BULLFROG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.664,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100375,  Location: 3 MILES NORTH OF CR-672 (Lat: 27.835169,  Lng: -82.349750),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 56,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 98,028 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SYMMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.654,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.2m (89.2ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10432,  Location: 0.3 MI N OF KRACKER AVE (Lat: 27.818722,  Lng: -82.380111),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Posted for load,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 230 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 287 (year 2041),  Features Intersected: KITCHEN BRANCH,  Facility Carried by Structure: PHILLIPS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.851,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 2.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 104354,  Location: 0.6 MI S OF SYMMES ROAD (Lat: 27.826747,  Lng: -82.369450),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 101 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 125 (year 2041),  Features Intersected: DUG CREEK,  Facility Carried by Structure: NORTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 100375,  Location: 3 MILES NORTH OF CR-672 (Lat: 27.835169,  Lng: -82.349750),  Route carried "under" structure: County highway ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 9%,  Features Intersected: SYMMES ROAD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 3.143,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.2m (89.2ft)

Discuss Gibsonton, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.