Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Glade Spring, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 89ft / 27.5mTotal length
  • $581,000Total costs
  • 129,229Total average daily traffic
  • 22,182Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Glade Spring
  • No street view available for this location

New bridges in Glade Spring, VA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31950-1959
  • 81960-1969
Reconstructed bridges in Glade Spring, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Glade Spring, VA
Average Bridge Truck Traffic in Glade Spring, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Fair
  • 25.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Satisfactory
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 18834,  Location: 0004BEG SR RD0152END SR R (Lat: 36.782544,  Lng: -81.734178),  Route carried "on" structure: ServiceCounty highway F034,  Year Built: 1963,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 71 (year 2013),  Average Future Daily Traffic: 81 (year 2040),  Design Load: HS 20,  Features Intersected: HUTTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 18835,  Location: 2.05MTOSMYTHCO&.1OMTO81 (Lat: 36.784214,  Lng: -81.734556),  Route carried "on" structure: US 11,  Year Built: 1918,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,183 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,401 (year 2040),  Design Load: H 15,  Features Intersected: HUTTON CREEK,  Facility Carried by Structure: LEE HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.533,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $131,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18846,  Location: 1.36 TO 835; 0.30 FR. 661 (Lat: 36.782667,  Lng: -81.735056),  Route carried "on" structure: US 11,  Year Built: 1963,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 2,183 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,401 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.282,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18934,  Location: 2.99 FR 737; 2.66 TO 11 (Lat: 36.771983,  Lng: -81.781217),  Route carried "on" structure: Interstate 81,  Year Built: 1962,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 15,989 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,385 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.996,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $183,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 18936,  Location: 2.99 FR. 737; 2.66 TO 11. (Lat: 36.771758,  Lng: -81.781222),  Route carried "on" structure: Interstate 81,  Year Built: 1962,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 16,183 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,656 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.369,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $221,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 18955,  Location: 0.04FR11; 2.14T SMYTHCO (Lat: 36.783306,  Lng: -81.734331),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 15,676 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 21,946 (year 2040),  Design Load: HS 20,  Features Intersected: HUTTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.352,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.3m (119.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $46,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18971,  Location: 6.51 TO SMYTH&2.08 FR R11 (Lat: 36.792933,  Lng: -81.765064),  Route carried "on" structure: State highway 91,  Year Built: 1959,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 6.82m (22.38ft),  Average Daily Traffic: 3,559 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,983 (year 2040),  Design Load: HL 93,  Features Intersected: RTE 609; NS RAILWAY,  Facility Carried by Structure: MONTE VISTA DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.141,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.2m (66.3ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18976,  Location: 6.62 FR SCL-1.97 TO RT11 (Lat: 36.791681,  Lng: -81.765000),  Route carried "on" structure: State highway 91,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,559 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,983 (year 2040),  Features Intersected: BRANCH,  Facility Carried by Structure: MONTE VISTA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.025,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 18846,  Location: 1.36 TO 835; 0.30 FR. 661 (Lat: 36.782667,  Lng: -81.735056),  Route carried "under" structure: Interstate 81,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 51,000 (year 2020),  Truck Traffic: 22%,  Features Intersected: I-81,  Facility Carried by Structure: US-11(LEE HIGHWAY)
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 18934,  Location: 2.99 FR 737; 2.66 TO 11 (Lat: 36.771983,  Lng: -81.781217),  Route carried "under" structure: State highway 91,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 9,004 (year 2019),  Truck Traffic: 2%,  Features Intersected: ROUTE 91,  Facility Carried by Structure: I-81 SBL
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 18936,  Location: 2.99 FR. 737; 2.66 TO 11. (Lat: 36.771758,  Lng: -81.781222),  Route carried "under" structure: State highway 91,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 9,004 (year 2019),  Truck Traffic: 2%,  Features Intersected: ROUTE 91,  Facility Carried by Structure: I-81 NBL
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 18971,  Location: 6.51 TO SMYTH&2.08 FR R11 (Lat: 36.792933,  Lng: -81.765064),  Route carried "under" structure: County highway 609,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 818 (year 2008),  Features Intersected: RTE 609; NS RAILWAY,  Facility Carried by Structure: MONTE VISTA DR.
Minimum Vertical Clearance: 7.80m (25.59ft),  Kilometerpoint: 15.865,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.2m (66.3ft)

Discuss Glade Spring, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.