Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Glen Fork, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 62ft / 18.5mTotal length
  • $3,350,000Total costs
  • 4,090Total average daily traffic
  • 241Total average daily truck traffic
  • 4,404Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Glen Fork
  • No street view available for this location

New bridges in Glen Fork, WV - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41970-1979
  • 11990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Glen Fork, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Good
  • 18.2%Satisfactory
  • 45.5%Fair
  • 9.1%Poor
  • 9.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Satisfactory
  • 58.3%Fair
  • 16.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Good
  • 50.0%Satisfactory
  • 33.3%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 41.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 55A009,  Location: 2.86 MI N OF CR 2/1 (Lat: 37.738061,  Lng: -81.518350),  Route carried "on" structure: County highway 200,  Year Built: 1978,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11 (year 2038),  Design Load: HS 20,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: CR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.833,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2019),  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 55A01,  Location: 0.04 Mi. E of Co. 1 (Lat: 37.689439,  Lng: -81.484489),  Route carried "on" structure: County highway 500,  Year Built: 1925,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,260 (year 2039),  Features Intersected: Laurel Fork,  Facility Carried by Structure: County Route 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Superstructure: Serious,  Substructure: Poor,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,350,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,400,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 55A106,  Location: 0.01 MI. S. OF CR. 1 (Lat: 37.696900,  Lng: -81.529250),  Route carried "on" structure: County highway 106,  Year Built: 1970,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11 (year 2038),  Design Load: HS 20,  Features Intersected: LAUREL FORK,  Facility Carried by Structure: CR. 1/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A111,  Location: 0.02 MI S OF CO 2/6 (Lat: 37.739900,  Lng: -81.535911),  Route carried "on" structure: County highway 200,  Year Built: 1978,  Status: Posted for load,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 611 (year 2038),  Design Load: HS 20,  Features Intersected: CRANE FORK,  Facility Carried by Structure: CR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.725,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $550,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A112,  Location: 0.04 MI E OF CR 2 (Lat: 37.717069,  Lng: -81.550869),  Route carried "on" structure: County highway 201,  Year Built: 1978,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 22 (year 2038),  Design Load: HS 20,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: CR 2/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A181,  Location: 0.01 MI SOUTH OF CO 1 (Lat: 37.700781,  Lng: -81.478719),  Route carried "on" structure: County highway 119,  Year Built: 1998,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: LAUREL FORK,  Facility Carried by Structure: COUNTY ROUTE 1/19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A192,  Location: 2.48 MI NORTH OF CO 2/1 (Lat: 37.735789,  Lng: -81.524331),  Route carried "on" structure: County highway 200,  Year Built: 2001,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 22 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: CO 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.222,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A193,  Location: 0.02 MI WEST OF CO 1/10 (Lat: 37.680661,  Lng: -81.503169),  Route carried "on" structure: County highway 100,  Year Built: 2002,  Status: Open,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 1,100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,221 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: LAUREL FORK,  Facility Carried by Structure: COUNTY ROUTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.072,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A199,  Location: 0.43 MILE E OF CO 1/15 (Lat: 37.688961,  Lng: -81.520161),  Route carried "on" structure: County highway 100,  Year Built: 2005,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,050 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: LAUREL FORK,  Facility Carried by Structure: COUNTY ROUTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.481,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A229,  Location: 0.01 Mile South of Co. 2 (Lat: 37.736919,  Lng: -81.526769),  Route carried "on" structure: Other road 90162,  Year Built: 2001,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 40 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 42 (year 2039),  Features Intersected: Clear Fork,  Facility Carried by Structure: HARP 901/62
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A231,  Location: 0.19 Mi. N of co. 5/7 (Lat: 37.681281,  Lng: -81.477739),  Route carried "on" structure: Other road 994,  Year Built: 2019,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 30 (year 2019),  Average Future Daily Traffic: 32 (year 2039),  Features Intersected: Milam Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A234,  Location: 0.01 M. North of Co. 1 (Lat: 37.681181,  Lng: -81.511231),  Route carried "on" structure: Other road 931,  Year Built: 2001,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 111 (year 2038),  Features Intersected: Laurel Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Discuss Glen Fork, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.