Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Glennville, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 187ft / 57.3mTotal length
  • $11,646,000Total costs
  • 25,780Total average daily traffic
  • 1,049Total average daily truck traffic
  • 38,670Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Glennville
  • No street view available for this location

New bridges in Glennville, GA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 11960-1969
  • 31970-1979
  • 41980-1989
  • 21990-1999
  • 22000-2009
Reconstructed bridges in Glennville, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Glennville, GA
Average Bridge Truck Traffic in Glennville, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 83.3%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 46.7%Good
  • 13.3%Satisfactory
Find on map >>   Show street view

Structure Number: 2670031,  Location: 4.5 MI S OF GLENNVILLE (Lat: 31.889308,  Lng: -81.918819),  Route carried "on" structure: State highway 196,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,280 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,920 (year 2031),  Design Load: H 15,  Features Intersected: BRICKYARD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 2670033,  Location: 4 MI N OF GLENNVILLE (Lat: 32.006708,  Lng: -81.906689),  Route carried "on" structure: County highway 733,  Year Built: 1962,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 780 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,170 (year 2031),  Design Load: H 15,  Features Intersected: N PRONG OF BEARD'S CRK,  Facility Carried by Structure: OLD HIGHWAY 250
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 2670035,  Location: 4 MI SE OF GLENNVILLE (Lat: 31.896269,  Lng: -81.910908),  Route carried "on" structure: County highway 1909,  Year Built: 1976,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 590 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 885 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: ROGERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 2670036,  Location: 2 MI NE OF GLENNVILLE (Lat: 31.952867,  Lng: -81.893936),  Route carried "on" structure: County highway 1909,  Year Built: 1980,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 870 (year 2031),  Design Load: H 15,  Features Intersected: BEARDS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,289,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,934,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2670037,  Location: 5 MI NE OF GLENNVILLE (Lat: 31.986328,  Lng: -81.893167),  Route carried "on" structure: County highway 1909,  Year Built: 1956,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 270 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 405 (year 2031),  Design Load: H 15,  Features Intersected: BREWTON MILLPOND,  Facility Carried by Structure: JOHN M BREWTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2670038,  Location: 7 MI NE OF GLENNVILLE (Lat: 32.005497,  Lng: -81.889369),  Route carried "on" structure: County highway 1909,  Year Built: 1956,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 270 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 405 (year 2031),  Design Load: H 15,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: JOHN M BREWTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2670045,  Location: 2 MI N OF GLENNVILLE (Lat: 31.969469,  Lng: -81.919319),  Route carried "on" structure: US 25,  Year Built: 1987,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 5,320 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,980 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: S PRONG BEARDS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,359,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2670046,  Location: 3 MI N OF GLENNVILLE (Lat: 31.993097,  Lng: -81.918028),  Route carried "on" structure: US 25,  Year Built: 1988,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 5,320 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,980 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $399,000
Find on map >>   Show street view

Structure Number: 2675013,  Location: 5 MI N OF GLENNVILLE (Lat: 32.025328,  Lng: -81.898489),  Route carried "on" structure: County highway 369,  Year Built: 1970,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 390 (year 2011),  Truck Traffic: 20%,  Average Future Daily Traffic: 585 (year 2031),  Design Load: H 15,  Features Intersected: NORTH FORK BEARDS CRK,  Facility Carried by Structure: BLOCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000
Find on map >>   Show street view

Structure Number: 2675014,  Location: 4 MI NE OF GLENNVILLE (Lat: 31.983397,  Lng: -81.878728),  Route carried "on" structure: County highway 369,  Year Built: 1972,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 200 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 300 (year 2031),  Design Load: H 15,  Features Intersected: BEARDS CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $346,000
Find on map >>   Show street view

Structure Number: 2675015,  Location: 1 MI N OF GLENNVILLE (Lat: 31.972889,  Lng: -81.907358),  Route carried "on" structure: County highway 374,  Year Built: 1981,  Status: Posted for load,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 280 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 420 (year 2031),  Design Load: HS 15,  Features Intersected: NORTH FORK BEARDS CRK,  Facility Carried by Structure: BIRDFORD LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2675028,  Location: 4 MI NE OF GLENNVILLE (Lat: 32.010550,  Lng: -81.880608),  Route carried "on" structure: County highway 378,  Year Built: 1990,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2031),  Design Load: H 15,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: L.A.DASHER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2675031,  Location: 5 MIS OF GLEENVILLE (Lat: 31.884289,  Lng: -81.912889),  Route carried "on" structure: State highway 196,  Year Built: 1999,  Status: Open,  Structure Length: 10.82m (35.50ft),  Average Daily Traffic: 3,280 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,920 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEARDS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,387,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $2,081,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2675034,  Location: 2 MILES EAST OF GLENNVILL (Lat: 31.924728,  Lng: -81.882139),  Route carried "on" structure: State highway 144,  Year Built: 2006,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 2,280 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,420 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEARDS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,110,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2675035,  Location: 3 MILES W OF GLENNVILLE (Lat: 31.928508,  Lng: -82.000739),  Route carried "on" structure: State highway 144,  Year Built: 2007,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 2,830 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,245 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATERMELON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Discuss Glennville, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.