Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greenbrier, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 46ft / 14.4mTotal length
  • $567,000Total costs
  • 6,379Total average daily traffic
  • 201Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenbrier
  • No street view available for this location

New bridges in Greenbrier, TN - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21950-1959
  • 11960-1969
  • 61970-1979
  • 21990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 83.3%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 83.3%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 50.0%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Find on map >>   Show street view

Structure Number: 74010140009,  Location: 3.3 MI NW JCT SR11&SR257 (Lat: 36.421067,  Lng: -86.821533),  Route carried "on" structure: County highway 1014,  Year Built: 1978,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 999 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: HS 20,  Features Intersected: CARR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.332,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740A2390001,  Location: 5.1 MI SE JCT SR11&SR65 (Lat: 36.467167,  Lng: -86.791200),  Route carried "on" structure: County highway 239,  Year Built: 1978,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.534,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740A2410001,  Location: GREENBRIER CEMETARY RD. (Lat: 36.451767,  Lng: -86.778817),  Route carried "on" structure: County highway 241,  Year Built: 1997,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.985,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 740A2620001,  Location: 4.2 MI SW JCT I65&SR76 (Lat: 36.445567,  Lng: -86.752167),  Route carried "on" structure: County highway 262,  Year Built: 1978,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 280 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 448 (year 2040),  Design Load: H 15,  Features Intersected: PEYTON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.581,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740A2630001,  Location: OSBORNE RD-N. OF GREENBRI (Lat: 36.444133,  Lng: -86.752667),  Route carried "on" structure: County highway 263,  Year Built: 1992,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2040),  Design Load: H 15,  Features Intersected: PEYTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.158,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.1m (10.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $199,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 740A3170001,  Location: 4.7 MI NW JCT SR11&SR257 (Lat: 36.433817,  Lng: -86.846200),  Route carried "on" structure: County highway 317,  Year Built: 1970,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 250 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 10,  Features Intersected: CARR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.875,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740A5950001,  Location: 2.3 MI NW JCT SR11&SR257 (Lat: 36.415967,  Lng: -86.807433),  Route carried "on" structure: County highway 595,  Year Built: 1955,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 650 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,040 (year 2040),  Design Load: HS 15,  Features Intersected: CARR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $155,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740A5980001,  Location: 1.5 MI NW JCT SR11&SR257 (Lat: 36.413050,  Lng: -86.793167),  Route carried "on" structure: City street 598,  Year Built: 1950,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 880 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,408 (year 2040),  Features Intersected: CARR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.889,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $95,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740B3710001,  Location: CARR CR. BLVD-GREENBRIER (Lat: 36.410833,  Lng: -86.790167),  Route carried "on" structure: City street 371,  Year Built: 2008,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2040),  Design Load: HS 20,  Features Intersected: CARR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 74F00300003,  Location: 4.7 MI N JCT SR11&SR257 (Lat: 36.467033,  Lng: -86.770150),  Route carried "on" structure: County highway 1014,  Year Built: 1978,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 680 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: HS 20,  Features Intersected: SULPHUR FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 74F00300005,  Location: 2.7 MI N JCT SR11&SR257 (Lat: 36.439750,  Lng: -86.771167),  Route carried "on" structure: County highway 1014,  Year Built: 1965,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 680 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.635,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $118,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 74F00300007,  Location: 2.5 MI NW JCT SR11&SR257 (Lat: 36.435650,  Lng: -86.780483),  Route carried "on" structure: County highway 1014,  Year Built: 1970,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 680 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.649,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 740A6020001,  Location: 1.7 MI NW JCT SR11&SR257 (Lat: 36.418267,  Lng: -86.794317),  Route carried "under" structure: City street 602,  Year Built: 1910,  Structure Length: 0. m,  Average Daily Traffic: 1,050 (year 2022),  Truck Traffic: 2%,  Features Intersected: CSX RR / OLD ST. HWY-11
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 2.221,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 6.1m (20.0ft)

Discuss Greenbrier, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.