Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greensboro, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 502ft / 153mTotal length
  • $53,463,000Total costs
  • 379,018Total average daily traffic
  • 35,216Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greensboro
  • No street view available for this location

New bridges in Greensboro, GA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 121960-1969
  • 31970-1979
  • 51980-1989
  • 31990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Greensboro, GA
Average Bridge Truck Traffic in Greensboro, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.3%Very good
  • 63.2%Good
  • 31.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.3%Very good
  • 42.1%Good
  • 26.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Very good
  • 68.4%Good
  • 26.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.4%Very good
  • 13.0%Good
  • 43.5%Satisfactory
  • 13.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 58.3%Good
  • 41.7%Satisfactory
Find on map >>   Show street view

Structure Number: 1330001,  Location: 5.2 MI W OF GREENSBORO (Lat: 33.581339,  Lng: -83.274089),  Route carried "on" structure: US 278,  Year Built: 1986,  Status: Open,  Structure Length: 16.09m (52.79ft),  Average Daily Traffic: 2,130 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,195 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LAKE OCONEE (OCONEE RIV)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $2,063,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $3,095,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330002,  Location: 1.6 MI W OF GREENSBORO (Lat: 33.576658,  Lng: -83.210358),  Route carried "on" structure: US 278,  Year Built: 1987,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 3,750 (year 2011),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,625 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 1330003,  Location: IN WEST GREENSBORO (Lat: 33.576178,  Lng: -83.186147),  Route carried "on" structure: US 278,  Year Built: 1954,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 6,890 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,335 (year 2031),  Design Load: HS 20,  Features Intersected: CSX RAILROAD (279582F)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $551,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330006,  Location: 4 MI SE OF GREENSBORO (Lat: 33.561078,  Lng: -83.139478),  Route carried "on" structure: State highway 15,  Year Built: 1930,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,470 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,705 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1330007,  Location: IN NORTH GREENSBORO (Lat: 33.587519,  Lng: -83.193889),  Route carried "on" structure: State highway 15,  Year Built: 1969,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 3,680 (year 2011),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,520 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330008,  Location: 2.7 MI N OF GREENSBORO (Lat: 33.610289,  Lng: -83.205328),  Route carried "on" structure: State highway 15,  Year Built: 1930,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,470 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.87m (134.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1330016,  Location: SOUTH GREENSBORO (Lat: 33.551469,  Lng: -83.200619),  Route carried "on" structure: State highway 44,  Year Built: 1961,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 10,350 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,525 (year 2031),  Design Load: H 15,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 1330021,  Location: 4.9 MI SW OF GREENSBORO (Lat: 33.535519,  Lng: -83.251969),  Route carried "on" structure: County highway 178,  Year Built: 1967,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 2,256 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,384 (year 2031),  Design Load: H 15,  Features Intersected: I-20 @ ML 127.53,  Facility Carried by Structure: CAREY STATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,035,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,553,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330023,  Location: 3.3 MI SW OF GREENSBORO (Lat: 33.542019,  Lng: -83.223678),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 26,060 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 39,090 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.606,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1330024,  Location: 3.3 MI SW OF GREENSBORO (Lat: 33.542408,  Lng: -83.223239),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 26,060 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 39,090 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.606,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1330025,  Location: 2.8 MI SE OF GREENSBORO (Lat: 33.548719,  Lng: -83.147508),  Route carried "on" structure: Interstate 20,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 27,290 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 40,935 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 215.652,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $556,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $833,000
Find on map >>   Show street view

Structure Number: 1330032,  Location: 4 MI SE OF GREENSBORO (Lat: 33.524019,  Lng: -83.153028),  Route carried "on" structure: County highway 925,  Year Built: 1959,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,090 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,635 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: VEAZEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 23.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330033,  Location: 2.1 MI S OF GREENSBORO (Lat: 33.547778,  Lng: -83.168469),  Route carried "on" structure: County highway 925,  Year Built: 1968,  Status: Open,  Structure Length: 9.66m (31.69ft),  Average Daily Traffic: 1,090 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,635 (year 2031),  Design Load: HS 20,  Features Intersected: I-20 @ ML 132.46,  Facility Carried by Structure: VEAZEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,239,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,858,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330034,  Location: 1.1 MI S OF GREENSBORO (Lat: 33.561050,  Lng: -83.174800),  Route carried "on" structure: County highway 925,  Year Built: 1945,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,260 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,890 (year 2031),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: MLK JR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1330035,  Location: IN NORTH GREENSBORO (Lat: 33.580689,  Lng: -83.180228),  Route carried "on" structure: County highway 925,  Year Built: 1985,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 1,820 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,730 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD (279580S),  Facility Carried by Structure: NORTH POOL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,248,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330036,  Location: 2.6 MI N OF GREENSBORO (Lat: 33.609297,  Lng: -83.162158),  Route carried "on" structure: County highway 925,  Year Built: 1979,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,860 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK,  Facility Carried by Structure: PENFIELD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1335012,  Location: 2.3 MI SW OF GREENSBORO (Lat: 33.549539,  Lng: -83.208639),  Route carried "on" structure: County highway 39,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: OLD EATONTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1335014,  Location: 5.1 MI SW OF PENFIELD (Lat: 33.613108,  Lng: -83.238858),  Route carried "on" structure: County highway 42,  Year Built: 1983,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: TOWN CREEK,  Facility Carried by Structure: COLD SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.73m (140.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1335024,  Location: 3.2 MI W OF UNION POINT (Lat: 33.615039,  Lng: -83.133558),  Route carried "on" structure: County highway 110,  Year Built: 1987,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: RICHLAND CREEK,  Facility Carried by Structure: CUNNINGHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $223,000
Find on map >>   Show street view

Structure Number: 1335036,  Location: 5.3 MI W OF GREENSBORO (Lat: 33.547828,  Lng: -83.269128),  Route carried "on" structure: County highway 178,  Year Built: 1975,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 2,256 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,384 (year 2031),  Design Load: HS 15,  Features Intersected: CSX RAILROAD (279586H),  Facility Carried by Structure: CAREY STATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $908,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 133504,  Location: 5.9 MI SW OF WHITE PLAINS (Lat: 33.436219,  Lng: -83.127958),  Route carried "on" structure: County highway 197,  Year Built: 1972,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: KIMBRO CREEK,  Facility Carried by Structure: LANIER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 1335044,  Location: 6.3 MI S OF GREENSBORO (Lat: 33.490289,  Lng: -83.221528),  Route carried "on" structure: County highway 65,  Year Built: 1990,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: EQUEST. TRAIL,  Facility Carried by Structure: CLUB DRIVE
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1335045,  Location: 3 MI SW OF GREENSBORO (Lat: 33.546728,  Lng: -83.221069),  Route carried "on" structure: County highway 38,  Year Built: 1997,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK,  Facility Carried by Structure: STAGE COACH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 1335046,  Location: 5.2 MI S OF GREENSBORO (Lat: 33.504569,  Lng: -83.155719),  Route carried "on" structure: County highway 66,  Year Built: 1997,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: LESLIE MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1335049,  Location: 6.6 MI SW OF GREENSBORO (Lat: 33.487889,  Lng: -83.227508),  Route carried "on" structure: State highway 44,  Year Built: 2002,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 8,500 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,750 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $716,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,074,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1335052,  Location: 2.5 MI S OF GREENESBORO (Lat: 33.545778,  Lng: -83.205378),  Route carried "on" structure: State highway 44,  Year Built: 2003,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 10,350 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,525 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,323,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,984,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1335063,  Location: 1 MI SW OF GREENSBORO (Lat: 33.553922,  Lng: -83.210081),  Route carried "on" structure: County highway 39,  Year Built: 2019,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 2,256 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,384 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD (279584U),  Facility Carried by Structure: OLD EATONTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $16,132,000,  Roadway Improvement Cost: $1,613,000,  Total Project Cost: $24,198,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2110035,  Location: 5.6 MI SE OF BUCKHEAD (Lat: 33.534003,  Lng: -83.272111),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 28,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2110036,  Location: 5.6 MI SE OF BUCKHEAD (Lat: 33.534250,  Lng: -83.272139),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 28,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2110037,  Location: 5.8 MI ESE OF BUCKHEAD (Lat: 33.534183,  Lng: -83.269583),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 15.21m (49.90ft),  Average Daily Traffic: 28,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,950,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,925,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2110038,  Location: 5.8 MI ESE OF BUCKHEAD (Lat: 33.534442,  Lng: -83.269547),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 15.21m (49.90ft),  Average Daily Traffic: 28,110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: OCONEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,950,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,925,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1330013,  Location: 4 MI SW OF GREENSBORO (Lat: 33.538589,  Lng: -83.235697),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 28,400 (year 2010),  Truck Traffic: 24%,  Features Intersected: CR 38 STAGE COACH RD,  Facility Carried by Structure: STAGE COACH ROAD
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 205.996,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1330021,  Location: 4.9 MI SW OF GREENSBORO (Lat: 33.535519,  Lng: -83.251969),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 28,400 (year 2010),  Truck Traffic: 24%,  Features Intersected: CR 178 CAREY STATION RD,  Facility Carried by Structure: CAREY STATION RD
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 205.996,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1330033,  Location: 2.1 MI S OF GREENSBORO (Lat: 33.547778,  Lng: -83.168469),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 29,600 (year 2010),  Truck Traffic: 30%,  Features Intersected: FAS 925 VEAZEY ROAD,  Facility Carried by Structure: VEAZEY ROAD
Minimum Vertical Clearance: 6.57m (21.56ft),  Kilometerpoint: 212.434,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1335042,  Location: CITY OF GREENSBORO (Lat: 33.578739,  Lng: -83.183789),  Route carried "under" structure: City street 819,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Features Intersected: CS 819 N. WEST STREET,  Facility Carried by Structure: CSX RR (279581Y)
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1335052,  Location: 2.5 MI S OF GREENESBORO (Lat: 33.545778,  Lng: -83.205378),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 29,600 (year 2010),  Truck Traffic: 24%,  Features Intersected: SR 44,  Facility Carried by Structure: SR 44
Minimum Vertical Clearance: 6.24m (20.47ft),  Kilometerpoint: 209.215,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Discuss Greensboro, Georgia (GA) on our hugely popular Georgia forum.