Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hampton, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 62ft / 18.9mTotal length
  • $1,000,003,000Total costs
  • 68,665Total average daily traffic
  • 5,726Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hampton
  • No street view available for this location

New bridges in Hampton, MN - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21960-1969
  • 11980-1989
  • 52000-2009
  • 22020-2022
Average Bridge Daily Traffic in Hampton, MN
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Very good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 19011,  Location: AT JCT TH 50 IN HAMPTON (Lat: 44.601261,  Lng: -92.993356),  Route carried "on" structure: State highway 50,  Year Built: 1962,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 5.14m (16.86ft),  Average Daily Traffic: 5,700 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,500 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: US 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.1m (46.3ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $94,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 19J42,  Location: 1.2 MI S OF JCT TH 50 (Lat: 44.618289,  Lng: -93.055411),  Route carried "on" structure: County highway 79,  Year Built: 2004,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 650 (year 2016),  Average Future Daily Traffic: 650 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $82,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000
Find on map >>   Show street view

Structure Number: 19J43,  Location: 0.9 MI S OF JCT TH 50 (Lat: 44.616494,  Lng: -93.055411),  Route carried "on" structure: County highway 79,  Year Built: 2004,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 650 (year 2016),  Average Future Daily Traffic: 650 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $68,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000
Find on map >>   Show street view

Structure Number: 19J44,  Location: 0.8 MI S OF JCT TH 50 (Lat: 44.618317,  Lng: -93.055417),  Route carried "on" structure: County highway 79,  Year Built: 2004,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 650 (year 2016),  Average Future Daily Traffic: 650 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: S BR VERMILLION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $66,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000
Find on map >>   Show street view

Structure Number: 19J88,  Location: 0.05 MI S OF JCT CSAH 78 (Lat: 44.600736,  Lng: -93.008978),  Route carried "on" structure: County highway 47,  Year Built: 2021,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,960 (year 2021),  Average Future Daily Traffic: 8,680 (year 2041),  Design Load: HL 93,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 19J89,  Location: 0.08 MI W OF JCT CSAH 47 (Lat: 44.601300,  Lng: -93.010161),  Route carried "on" structure: County highway 78,  Year Built: 2021,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 520 (year 2021),  Average Future Daily Traffic: 620 (year 2041),  Design Load: HL 93,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 19R05,  Location: 1.3 MI N OF JCT (Lat: 44.617875,  Lng: -92.994758),  Route carried "on" structure: County highway 47,  Year Built: 2006,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 2,650 (year 2016),  Average Future Daily Traffic: 2,650 (year 2039),  Design Load: HL 93,  Features Intersected: US 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.5m (126.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 23.6m (77.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 96686,  Location: 4.5 MI E OF FARMINGTON (Lat: 44.630364,  Lng: -93.045494),  Route carried "on" structure: State highway 50,  Year Built: 1989,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 3,756 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,700 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: S BR Vermillion River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: L3254,  Location: 0.5 MI W OF JCT CSAH 79 (Lat: 44.615939,  Lng: -93.065797),  Route carried "on" structure: County highway 93,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 75 (year 1996),  Average Future Daily Traffic: 75 (year 2029),  Features Intersected: S BR VERMILLION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 19011,  Location: AT JCT TH 50 IN HAMPTON (Lat: 44.601261,  Lng: -92.993356),  Route carried "under" structure: US 52,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 22,020 (year 2019),  Truck Traffic: 11%,  Features Intersected: US 52,  Facility Carried by Structure: MN 50
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.1m (46.3ft)

Find on map >>   Show street view

Structure Number: 19R05,  Location: 1.3 MI N OF JCT (Lat: 44.617875,  Lng: -92.994758),  Route carried "under" structure: US 52,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 27,034 (year 2019),  Truck Traffic: 9%,  Features Intersected: US 52,  Facility Carried by Structure: CSAH 47
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 38.5m (126.3ft)

Discuss Hampton, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.