Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Harrogate, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 194ft / 59.0mTotal length
  • $13,613,000Total costs
  • 53,101Total average daily traffic
  • 4,772Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Harrogate
  • No street view available for this location

New bridges in Harrogate, TN - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21940-1949
  • 11960-1969
  • 41970-1979
  • 81980-1989
  • 41990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Harrogate, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Excellent
  • 15.8%Very good
  • 21.1%Good
  • 26.3%Satisfactory
  • 21.1%Fair
  • 10.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.7%Excellent
  • 30.8%Good
  • 53.8%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 13023530003,  Location: NE OF TAZEWELL (Lat: 36.588333,  Lng: -83.602800),  Route carried "on" structure: State highway 345,  Year Built: 1940,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 1,479 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,224 (year 2040),  Design Load: H 15,  Features Intersected: CEDAR FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.596,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.99m (3.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $124,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13024950001,  Location: 3.2 M SE OF US25E-SR63 JC (Lat: 36.523067,  Lng: -83.630983),  Route carried "on" structure: County highway 392,  Year Built: 1984,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 80 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BLAIR CREEK,  Facility Carried by Structure: NFA 2495 (SA 1313)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.128,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13025070001,  Location: E OF CUMBERLAND GAP (Lat: 36.588917,  Lng: -83.606083),  Route carried "on" structure: County highway 2507,  Year Built: 1986,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 486 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 778 (year 2041),  Design Load: HS 20,  Features Intersected: STATION CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13025580001,  Location: 1.8 M SW OF ARTHUR (Lat: 36.533050,  Lng: -83.692667),  Route carried "on" structure: County highway 2558,  Year Built: 1988,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 667 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,120 (year 2039),  Design Load: HS 20,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.396,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13025600001,  Location: 7.5 M NW OF TAZEWELL (Lat: 36.557517,  Lng: -83.606650),  Route carried "on" structure: County highway 2560,  Year Built: 1985,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 217 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 347 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.991,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 130A0420003,  Location: NE OF EAGAN AT STATE LINE (Lat: 36.586017,  Lng: -83.619367),  Route carried "on" structure: County highway 42,  Year Built: 1987,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 220 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 352 (year 2041),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.516,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 130A0690001,  Location: N OF SR6O AT ARTHUR (Lat: 36.552467,  Lng: -83.667567),  Route carried "on" structure: County highway 1310,  Year Built: 1984,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 319 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 510 (year 2041),  Design Load: HS 20,  Features Intersected: GAP CREEK,  Facility Carried by Structure: NFA A069
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.435,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 130A0690003,  Location: 1.2 M W OF HARROGATE (Lat: 36.582450,  Lng: -83.679400),  Route carried "on" structure: County highway 1310,  Year Built: 2015,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 319 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 864 (year 2039),  Design Load: HL 93,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.442,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 130A1420001,  Location: 4.6 M SE OF US25E-SR63 JC (Lat: 36.552600,  Lng: -83.572450),  Route carried "on" structure: County highway 142,  Year Built: 1994,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 80 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.021,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 130A1540001,  Location: .2 MI N OF SR 63 (Lat: 36.581783,  Lng: -83.596867),  Route carried "on" structure: County highway 154,  Year Built: 1990,  Status: Posted for load,  Structure Length: 4.19m (13.75ft),  Average Daily Traffic: 30 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 48 (year 2041),  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.473,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.3m (50.2ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.16m (16.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,313,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 130A4050001,  Location: 3.5 M SSE OF US25E-SR63 J (Lat: 36.520433,  Lng: -83.636283),  Route carried "on" structure: County highway 405,  Year Built: 1984,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 80 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BLAIR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.095,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.7m (15.4ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 130A4240001,  Location: N OFF SR63 IN ARTHUR (Lat: 36.543250,  Lng: -83.669967),  Route carried "on" structure: County highway 424,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 420 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 672 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.357,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 130A4260001,  Location: 1 MI SE OF SR63 (Lat: 36.514983,  Lng: -83.686550),  Route carried "on" structure: County highway 426,  Year Built: 1993,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: H 15,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 130A4260003,  Location: 2 MI SE OF SR63 (Lat: 36.514722,  Lng: -83.686111),  Route carried "on" structure: County highway 426,  Year Built: 2021,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 13S24410003,  Location: .6 M E OF FORGE RIDGE RD (Lat: 36.588450,  Lng: -83.605217),  Route carried "on" structure: State highway 63,  Year Built: 1970,  Status: Open,  Structure Length: 4.86m (15.94ft),  Average Daily Traffic: 1,051 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,952 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.762,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13SR0320013,  Location: .5 M SE OF RIVERVIEW (Lat: 36.540267,  Lng: -83.631050),  Route carried "on" structure: US 25,  Year Built: 2000,  Status: Open,  Structure Length: 15.67m (51.41ft),  Average Daily Traffic: 15,824 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 25,318 (year 2042),  Design Load: HS 20,  Features Intersected: POWELL RIVER,  Facility Carried by Structure: FAP 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.685,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.1m (82.3ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.7m (133.5ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.67m (51.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $7,068,000,  Roadway Improvement Cost: $707,000,  Total Project Cost: $10,603,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13SR0630007,  Location: 4 M S CUMBLD GP MT PARK (Lat: 36.535917,  Lng: -83.692183),  Route carried "on" structure: State highway 63,  Year Built: 1971,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,844 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,200 (year 2040),  Design Load: H 20,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.979,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 13SR0630009,  Location: 3.8 M S CUMBLD GP MT PARK (Lat: 36.542417,  Lng: -83.678367),  Route carried "on" structure: State highway 63,  Year Built: 1971,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 7,325 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,984 (year 2040),  Design Load: H 20,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.444,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 13SR0630011,  Location: 3.2 M W CUMBLD GP NAP PK (Lat: 36.546583,  Lng: -83.669867),  Route carried "on" structure: State highway 63,  Year Built: 1969,  Status: Open,  Structure Length: 4.46m (14.63ft),  Average Daily Traffic: 7,325 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,984 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTHERN RAILWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.46m (14.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,525,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13SR0630013,  Location: 3.5 M W CUMBLD GP NAP PK (Lat: 36.549267,  Lng: -83.665400),  Route carried "on" structure: State highway 63,  Year Built: 1971,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 7,325 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,984 (year 2040),  Design Load: H 20,  Features Intersected: GAP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.844,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 5230013P,  Location: NEAR EAST PARK BOUNDARY (Lat: 36.592361,  Lng: -83.663833),  Route carried "on" structure: Federal lands road 10,  Year Built: 1995,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 3,000 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,600 (year 2034),  Design Load: HS 20,  Features Intersected: U.S. ROUTE 25E,  Facility Carried by Structure: U.S. ROUTE 58 ENTR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: National Park Service,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $48,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130A4260005,  Location: 2 MI SE OF SR63 (Lat: 36.511944,  Lng: -83.684444),  Route carried "under" structure: County highway 426,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 5%,  Features Intersected: SOUTHERN RAILROAD
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 2.929,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 130A4320001,  Location: 2 M SW OF ARTHUR (Lat: 36.523167,  Lng: -83.685800),  Route carried "under" structure: County highway 423,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 40 (year 2022),  Truck Traffic: 2%,  Features Intersected: SOUTHERN RAILWAY
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 0.026,  Lanes under structure: 1,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.6m (24.9ft)

Discuss Harrogate, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.