Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Helenwood, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 135ft / 41.3mTotal length
  • $3,807,000Total costs
  • 57,272Total average daily traffic
  • 5,984Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Helenwood
  • No street view available for this location

New bridges in Helenwood, TN - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11930-1939
  • 21970-1979
  • 11980-1989
  • 51990-1999
  • 22010-2019
Average Bridge Daily Traffic in Helenwood, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 27.3%Fair
Find on map >>   Show street view

Structure Number: 76023770003,  Location: 2 M SE OF US27-SR63 JCT (Lat: 36.383983,  Lng: -84.528567),  Route carried "on" structure: County highway 2377,  Year Built: 1975,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 178 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 288 (year 2041),  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.906,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $859,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 76024000001,  Location: 5.5 MI. SE JCT SR46&SR100 (Lat: 36.458781,  Lng: -84.547439),  Route carried "on" structure: County highway 2400,  Year Built: 2011,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 718 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,296 (year 2041),  Design Load: HL 93,  Features Intersected: SR29 N. S. RR/PHILLIP C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 760A0400005,  Location: 3.5 M SW OF ONEIDA (Lat: 36.474317,  Lng: -84.563283),  Route carried "on" structure: County highway 40,  Year Built: 1994,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.157,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 760A0400007,  Location: 5.2 M SW OF ONEIDA (Lat: 36.466050,  Lng: -84.596800),  Route carried "on" structure: County highway 40,  Year Built: 1914,  Status: Posted for load,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.754,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.9m (45.6ft),  Curb-To-Curb Width: 2.5m (8.2ft),  Out-to-Out Width: 2.9m (9.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 6.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 5.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.86m (12.66ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $998,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 760A0400009,  Location: 6.8 MI SW OF ONEIDA (Lat: 36.457950,  Lng: -84.616300),  Route carried "on" structure: County highway 40,  Year Built: 1914,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2042),  Design Load: Railroad,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.166,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 2.4m (7.9ft),  Out-to-Out Width: 2.8m (9.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $737,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 760A3140001,  Location: W OF US27 AT HELENWOOD (Lat: 36.429417,  Lng: -84.539567),  Route carried "on" structure: County highway 154,  Year Built: 1935,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 2,560 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,096 (year 2041),  Design Load: H 15,  Features Intersected: PHILLIPS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.183,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 760A3220001,  Location: W OF US27 AT HELENWOOD (Lat: 36.433683,  Lng: -84.539933),  Route carried "on" structure: County highway 157,  Year Built: 1975,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 110 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 176 (year 2041),  Features Intersected: PHILLIPS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.098,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.96m (3.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $214,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 76SR0290005,  Location: 9 M NE OF MORGAN CO LN (Lat: 36.382083,  Lng: -84.558700),  Route carried "on" structure: US 29,  Year Built: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,860 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,376 (year 2041),  Design Load: HS 20,  Features Intersected: BUTTRAM BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.937,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $241,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 76SR0290009,  Location: 9 MI. NE.OF MORGAN CO. (Lat: 36.382317,  Lng: -84.553333),  Route carried "on" structure: US 29,  Year Built: 1990,  Status: Posted for load,  Structure Length: 12.45m (40.85ft),  Average Daily Traffic: 5,860 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,376 (year 2042),  Design Load: HS 20,  Features Intersected: NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.339,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: May 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 76SR0290013,  Location: 1.4 MI N JCT SR63 (Lat: 36.432300,  Lng: -84.538250),  Route carried "on" structure: US 27,  Year Built: 1992,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12,022 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 19,235 (year 2041),  Design Load: HS 20,  Features Intersected: SULPHUR CREEK,  Facility Carried by Structure: FAP 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.809,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $379,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 76SR0290015,  Location: 2 MI N JCT SR63 (Lat: 36.440000,  Lng: -84.539717),  Route carried "on" structure: US 27,  Year Built: 1995,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12,022 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 19,235 (year 2041),  Design Load: HS 20,  Features Intersected: CHERRY FORK CREEK,  Facility Carried by Structure: FAP 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.662,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.5m (70.5ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $379,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 76024000001,  Location: SW OF THE CITY OF ONEIDA (Lat: 36.458750,  Lng: -84.547344),  Route carried "under" structure: US 27,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 12,022 (year 2020),  Truck Traffic: 11%,  Features Intersected: 2400
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 23.979,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 76SR0290031,  Location: JUST N. OF NEW RIVER (Lat: 36.382517,  Lng: -84.548283),  Route carried "under" structure: US 27,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 5,860 (year 2020),  Truck Traffic: 11%,  Features Intersected: SOUTHERN RAILWAY,  Facility Carried by Structure: SOU RR 841833V
Minimum Vertical Clearance: 7.45m (24.44ft),  Kilometerpoint: 14.790,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.7m (84.3ft)

Discuss Helenwood, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.