Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hissop, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 43ft / 13.2mTotal length
  • $5,101,000Total costs
  • 4,216Total average daily traffic
  • 86Total average daily truck traffic
  • 5,455Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hissop
  • No street view available for this location

New bridges in Hissop, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11940-1949
  • 31950-1959
  • 11960-1969
  • 31970-1979
  • 31980-1989
  • 11990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Good
  • 50.0%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 61.5%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 37,  Location: 2.5 Miles N of SR-9 (Lat: 32.842597,  Lng: -86.149197),  Route carried "on" structure: County highway ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 32 (year 2021),  Average Future Daily Traffic: 33 (year 2041),  Features Intersected: Swamp Creek,  Facility Carried by Structure: CR-61
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 18.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $190,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 2126,  Location: 0.10 MI N of CR-14 (Lat: 32.803281,  Lng: -86.149272),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 74 (year 2022),  Average Future Daily Traffic: 163 (year 2042),  Features Intersected: Ellis Creek,  Facility Carried by Structure: Little Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $155,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $171,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6216,  Location: 0.31 MI N OF CR-14 (Lat: 32.804833,  Lng: -86.137364),  Route carried "on" structure: County highway 18,  Year Built: 1959,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 159 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 236 (year 2042),  Design Load: HS 20,  Features Intersected: Unnamed Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 64.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $266,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6217,  Location: 1.99 MI. N CR-14 (Lat: 32.818358,  Lng: -86.158247),  Route carried "on" structure: County highway 18,  Year Built: 1959,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 152 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 226 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $222,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6582,  Location: 4.08 MILES NW OF CR-14 (Lat: 32.836686,  Lng: -86.178908),  Route carried "on" structure: County highway 18,  Year Built: 1959,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 152 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 226 (year 2040),  Design Load: HS 20,  Features Intersected: Little Sam Jack Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 81.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $651,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $716,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7409,  Location: 2.2 MI. NE SR-22 (Lat: 32.917158,  Lng: -86.133839),  Route carried "on" structure: County highway 40,  Year Built: 1961,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 533 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 561 (year 2041),  Design Load: HS 20,  Features Intersected: Jacks Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $318,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11813,  Location: 0.68 MI W Cottage Grove (Lat: 32.856225,  Lng: -86.134478),  Route carried "on" structure: County highway 30,  Year Built: 1977,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 428 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 442 (year 2041),  Design Load: H 15,  Features Intersected: Swamp Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11819,  Location: 0.92 Miles West of SR-9 (Lat: 32.953786,  Lng: -86.084319),  Route carried "on" structure: County highway 40,  Year Built: 1977,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 523 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 550 (year 2040),  Design Load: HS 20,  Features Intersected: Bow Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11962,  Location: 0.50 MI NE of CR-18 (Lat: 32.816358,  Lng: -86.138353),  Route carried "on" structure: County highway 4,  Year Built: 1978,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 256 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 325 (year 2042),  Design Load: HS 20,  Features Intersected: Swamp Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $270,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13341,  Location: 0.90 Mi E SR-9 (Lat: 32.844558,  Lng: -86.086739),  Route carried "on" structure: County highway 63,  Year Built: 1984,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 318 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 472 (year 2041),  Design Load: HS 20,  Features Intersected: Rocky Ford Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $265,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13342,  Location: 1.87 Mi S of SR-22 (Lat: 32.861150,  Lng: -86.065736),  Route carried "on" structure: County highway 63,  Year Built: 1984,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 318 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 472 (year 2041),  Design Load: HS 20,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $343,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13413,  Location: 4 MI N JCT SR 9 (Lat: 32.808861,  Lng: -86.067417),  Route carried "on" structure: State highway 259,  Year Built: 1984,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 1,152 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,613 (year 2038),  Design Load: HS 20,  Features Intersected: CHAPMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $888,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15189,  Location: 1.97 Miles NE of CR-40 (Lat: 32.903900,  Lng: -86.121839),  Route carried "on" structure: County highway 42,  Year Built: 1990,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 119 (year 2021),  Average Future Daily Traffic: 136 (year 2041),  Design Load: HS 20,  Features Intersected: Jacks Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $645,000 ( Estimate for 2022)
Discuss Hissop, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.