Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hokes Bluff, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 174ft / 52.8mTotal length
  • $22,609,000Total costs
  • 89,061Total average daily traffic
  • 5,232Total average daily truck traffic
  • 126,623Total future (year 2020) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hokes Bluff
  • No street view available for this location

New bridges in Hokes Bluff, AL - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11940-1949
  • 21950-1959
  • 11960-1969
  • 41990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hokes Bluff, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 55.6%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 44.4%Good
  • 11.1%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 44.4%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 6.7%Very good
  • 46.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1845,  Location: AT INT WITH ALFORD BEND (Lat: 33.974019,  Lng: -85.865008),  Route carried "on" structure: County highway 201,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 950 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,416 (year 2032),  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: COLVIN GAP RD.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 17.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1851,  Location: .05 MI EAST OF CNTY RD 71 (Lat: 34.000189,  Lng: -85.845208),  Route carried "on" structure: County highway 217,  Year Built: 1938,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 753 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,077 (year 2032),  Features Intersected: LITTLE DRY CREEK,  Facility Carried by Structure: ROCKY FORD RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $241,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2062,  Location: 0.2 MI S OF FORDS VLLY RD (Lat: 33.966733,  Lng: -85.841769),  Route carried "on" structure: County highway 196,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 353 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2033),  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: OLD FORDS VALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $233,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2473,  Location: SIBERT ST (Lat: 33.981667,  Lng: -85.870000),  Route carried "on" structure: County highway 195,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 170 (year 1991),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2034),  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: SIBERT ST
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $272,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6643,  Location: WILLIAMS RD (Lat: 33.910806,  Lng: -85.778711),  Route carried "on" structure: County highway 63,  Year Built: 1959,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 310 (year 1993),  Truck Traffic: 1%,  Average Future Daily Traffic: 610 (year 2040),  Features Intersected: COFFEE CREEK,  Facility Carried by Structure: WILLIAMS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $428,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8082,  Location: 1.1 MI W OF MAYES X RDS (Lat: 34.017825,  Lng: -85.857894),  Route carried "on" structure: County highway 220,  Year Built: 1963,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 300 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 300 (year 2033),  Design Load: H 15,  Features Intersected: LITTLE DRY CREEK,  Facility Carried by Structure: BACHELORS CHAPEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $452,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9834,  Location: OLD HWY 278 * COVE CREEK (Lat: 33.991667,  Lng: -85.910000),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 12,660 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,810 (year 2032),  Design Load: H 15,  Features Intersected: COVE CREEK,  Facility Carried by Structure: OLD HWY 278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.220,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $937,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,031,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16383,  Location: .7 MI W LITTLE COVE CREEK (Lat: 33.998719,  Lng: -85.938600),  Route carried "on" structure: State highway 74,  Year Built: 2002,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 14,367 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,113 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE COVE CREEK RELIEF,  Facility Carried by Structure: US 278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 219.836,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,125,000,  Roadway Improvement Cost: $413,000,  Total Project Cost: $4,538,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16384,  Location: 2.5MILES EAST OF 431 (Lat: 33.995042,  Lng: -85.924994),  Route carried "on" structure: State highway 278,  Year Built: 1998,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 14,876 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,826 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE COVE CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 221.088,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,667,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $4,034,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16385,  Location: US 278 @ BIG COVE CREEK (Lat: 33.987728,  Lng: -85.908242),  Route carried "on" structure: State highway 278,  Year Built: 1998,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 14,886 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,826 (year 2038),  Design Load: HS 20,  Features Intersected: BIG COVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.894,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,333,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $3,666,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16386,  Location: US 278 @ BIG COVE CREEK (Lat: 33.987972,  Lng: -85.908142),  Route carried "on" structure: State highway 278,  Year Built: 1998,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 14,867 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,826 (year 2038),  Design Load: HS 20,  Features Intersected: BIG COVE CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 222.894,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 85.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,333,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $3,666,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16387,  Location: 1.8 MI.E. BIG COVE CK (Lat: 33.983478,  Lng: -85.827686),  Route carried "on" structure: State highway 74,  Year Built: 1998,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 11,669 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,337 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: US 278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.500,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 68.3m (224.1ft),  Out-to-Out Width: 68.6m (225.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,689,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $1,858,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1879,  Location: ?Caddell Circle (Lat: 33.997731,  Lng: -85.923597),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 3.66m (12.01ft),  Design Load: HS 20,  Features Intersected: Big Cove Creek,  Facility Carried by Structure: Caddell Circle
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $596,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $656,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18804,  Location: 0.4 MI PAST ROCKY FORD RD (Lat: 34.004986,  Lng: -85.848517),  Route carried "on" structure: County highway 221,  Year Built: 2003,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,600 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,072 (year 2035),  Design Load: HS 20,  Features Intersected: LITTLE DRY CREEK,  Facility Carried by Structure: COUNTY ROAD 71
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $847,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $932,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 20712,  Location: 200'S OF RABBITOWN RD. (Lat: 33.966897,  Lng: -85.863408),  Route carried "on" structure: County highway 21,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,300 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,050 (year 2035),  Design Load: HS 20,  Features Intersected: UT TO BIG COVE CREEK,  Facility Carried by Structure: COLVIN GAP RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $297,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Hokes Bluff, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.