Bridge Statistics for Johnsburg, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 236ft / 72.3mTotal length
  • $48,881,000Total costs
  • 18,700Total average daily traffic
  • 1,544Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Johnsburg
  • No street view available for this location

New bridges in Johnsburg, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31900-1909
  • 21910-1919
  • 11920-1929
  • 41930-1939
  • 51940-1949
  • 51960-1969
  • 31970-1979
  • 11980-1989
  • 11990-1999
  • 32000-2009
  • 52010-2019
Reconstructed bridges in Johnsburg, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 21990-1999
  • 32000-2009
  • 22010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.8%Excellent
  • 20.7%Very good
  • 13.8%Good
  • 34.5%Satisfactory
  • 10.3%Fair
  • 6.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Excellent
  • 20.0%Very good
  • 23.3%Good
  • 16.7%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
  • 3.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.3%Excellent
  • 16.7%Very good
  • 6.7%Good
  • 43.3%Satisfactory
  • 13.3%Fair
  • 3.3%Poor
  • 3.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.6%Very good
  • 35.3%Good
  • 29.4%Satisfactory
  • 14.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 100486,  Location: RT 8 2.7 MI NE HAM.CO.L. (Lat: 43.530328,  Lng: -74.145300),  Route carried "on" structure: State highway 8,  Year Built: 1932,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 820 (year 2015),  Truck Traffic: 9%,  Average Future Daily Traffic: 874 (year 2040),  Features Intersected: STEWART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.264,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $782,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100487,  Location: 3.8MI NE JCT 8&28 (Lat: 43.661908,  Lng: -73.898458),  Route carried "on" structure: State highway 8,  Year Built: 2003,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 1,122 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,196 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HUDSON RIVER
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 34.304,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 92.3m (302.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.41m (30.87ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $7,280,000,  Roadway Improvement Cost: $4,263,000,  Total Project Cost: $11,544,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102033,  Location: JCT RTE 28 & HUDSON R (Lat: 43.744033,  Lng: -74.057914),  Route carried "on" structure: State highway 28,  Year Built: 1966,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,691 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,869 (year 2040),  Features Intersected: THIRTEENTH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $947,000,  Roadway Improvement Cost: $554,000,  Total Project Cost: $1,501,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102034,  Location: 0.3 MI S JCT 28 & 28N (Lat: 43.693950,  Lng: -73.987403),  Route carried "on" structure: State highway 28,  Year Built: 1966,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,660 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,836 (year 2040),  Features Intersected: NORTH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.737,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $488,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102035,  Location: 0.2 MI SE JCT 8 & 28 (Lat: 43.632181,  Lng: -73.939283),  Route carried "on" structure: State highway 28,  Year Built: 2008,  Status: Open,  Structure Length: 9.66m (31.69ft),  Average Daily Traffic: 2,528 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,696 (year 2040),  Design Load: HL 93,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.120,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.0m (124.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.66m (31.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,245,000,  Roadway Improvement Cost: $1,315,000,  Total Project Cost: $3,560,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102036,  Location: 0.3 MI NW JCT 28& HUDSONR (Lat: 43.585042,  Lng: -73.864078),  Route carried "on" structure: State highway 28,  Year Built: 2007,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 2,528 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,696 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GLEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.664,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.0m (111.5ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,212,000,  Roadway Improvement Cost: $710,000,  Total Project Cost: $1,922,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105366,  Location: 0.5 MI NE JCT SH28 & 28N (Lat: 43.699778,  Lng: -73.983097),  Route carried "on" structure: State highway 28N,  Year Built: 1930,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 13.84m (45.41ft),  Average Daily Traffic: 887 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 925 (year 2040),  Design Load: HS 20,  Features Intersected: UPPER HUDSON R RR, HUDSO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.581,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 42.9m (140.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 13.83m (45.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $9,195,000,  Roadway Improvement Cost: $5,384,000,  Total Project Cost: $14,579,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1096,  Location: .1MI S OF CL ON RTE 28 (Lat: 43.744183,  Lng: -74.057842),  Route carried "on" structure: ServiceOther road ,  Year Built: 1966,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 250 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2029),  Features Intersected: THIRTEENTH BROOK,  Facility Carried by Structure: RTE 28 REST AREA
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $561,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $890,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22034,  Location: 2.5 M NE OF 13TH LAKE (Lat: 43.735803,  Lng: -74.073731),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 144 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 202 (year 2037),  Design Load: HS 20,  Features Intersected: THIRTEENTH BROOK,  Facility Carried by Structure: TR510 HARVEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.652,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $550,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $872,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220342,  Location: 3 MI N OF SODOM (Lat: 43.672075,  Lng: -73.991275),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 51 (year 2019),  Average Future Daily Traffic: 71 (year 2039),  Design Load: H 20,  Features Intersected: NORTH CREEK,  Facility Carried by Structure: DURKIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $463,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220345,  Location: GARNET L OUTLET (Lat: 43.538319,  Lng: -74.012897),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 32 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 45 (year 2037),  Features Intersected: MILL CREEK,  Facility Carried by Structure: TR340CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $73,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $116,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220346,  Location: 1 MI E OF GARNET LAKE (Lat: 43.544189,  Lng: -74.001967),  Route carried "on" structure: Other road ,  Year Built: 1905,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 6 (year 2037),  Features Intersected: PINE RIDGE BROOK,  Facility Carried by Structure: CROSBY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $135,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 226702,  Location: 1 MI.N.SODOM (Lat: 43.642739,  Lng: -74.006739),  Route carried "on" structure: ServiceOther road ,  Year Built: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 42 (year 2039),  Design Load: HS 20,  Features Intersected: CHATIEMAC BROOK,  Facility Carried by Structure: A.HITCHCOCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $103,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 330533,  Location: 2 MI N GARNET LAKE (Lat: 43.564314,  Lng: -74.008333),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 43 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 60 (year 2037),  Design Load: HL 93,  Features Intersected: MILL CREEK,  Facility Carried by Structure: TR32CRANE MT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $491,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330534,  Location: 4MI NE GARNET LAKE (Lat: 43.584656,  Lng: -73.983100),  Route carried "on" structure: Other road ,  Year Built: 1914,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 54 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 76 (year 2040),  Features Intersected: MILL CREEK,  Facility Carried by Structure: TR57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 4.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 3.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $305,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330535,  Location: 1 MI SW JCT NY8(Lat: 43.622228,  Lng: -73.952389),  Route carried "on" structure: Other road ,  Year Built: 1909,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 3 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4 (year 2040),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: TR635MILLWOOD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $337,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 330536,  Location: 7 MI S JOHNSBURG (Lat: 43.558800,  Lng: -73.926225),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 214 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: H 20,  Features Intersected: CRYSTAL BROOK,  Facility Carried by Structure: S.JOHNSBURG RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.250,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $529,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $838,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330537,  Location: 1MI S OF JOHNSBURG (Lat: 43.615239,  Lng: -73.957606),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 397 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 556 (year 2039),  Features Intersected: MILL CREEK,  Facility Carried by Structure: CR57 JOHNSBURG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.555,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $226,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330538,  Location: 1 MI W SODOM (Lat: 43.632308,  Lng: -74.006517),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 44 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 62 (year 2037),  Design Load: HL 93,  Features Intersected: BAKER BROOK,  Facility Carried by Structure: CHATIEMAC RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $281,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330539,  Location: 1 MI N SODOM (Lat: 43.639219,  Lng: -74.002636),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 729 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 760 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BAKER BROOK,  Facility Carried by Structure: PEACEFUL VALLEY RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $581,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $922,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33054,  Location: 1 MI N SODOM (Lat: 43.643011,  Lng: -74.006219),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 729 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 760 (year 2040),  Features Intersected: CHATIEMAC BROOK,  Facility Carried by Structure: CR29 PEACEFUL VALL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $614,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330541,  Location: 2MI S NORTH CREEK (Lat: 43.662978,  Lng: -73.996561),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 729 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 760 (year 2040),  Features Intersected: STRAIGHT BROOK,  Facility Carried by Structure: CR29 PEACEFUL VALL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.749,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $800,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330542,  Location: 0.9 MI.S.NORTH CREEK (Lat: 43.686656,  Lng: -73.989397),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 910 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 949 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH CREEK,  Facility Carried by Structure: CR29 PEACEFUL VALL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.533,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $434,000,  Total Project Cost: $1,176,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330543,  Location: 1 MI NE OF SODOM (Lat: 43.650653,  Lng: -73.993483),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 81 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 113 (year 2035),  Design Load: HL 93,  Features Intersected: CHATIEMAC BROOK,  Facility Carried by Structure: BACK TO SODOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $449,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330544,  Location: 2 MI N OF SODOM (Lat: 43.664114,  Lng: -73.994653),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.01m (3.31ft),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: NORTH CREEK,  Facility Carried by Structure: CLAUDE STRAIGHT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $421,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 330545,  Location: 1 MILE W OF NORTH RIVER (Lat: 43.740917,  Lng: -74.061825),  Route carried "on" structure: Other road ,  Year Built: 1911,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 4 (year 2037),  Design Load: HS 20,  Features Intersected: THIRTEENTH BROOK,  Facility Carried by Structure: SMITH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $330,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330546,  Location: .5M E WEVERTOWN (Lat: 43.634150,  Lng: -73.933069),  Route carried "on" structure: Other road ,  Year Built: 1889,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 25 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 35 (year 2037),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: DILLON HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $348,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330547,  Location: HEATH RD 1MI E NY8(Lat: 43.638081,  Lng: -73.924183),  Route carried "on" structure: Other road ,  Year Built: 1908,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 18 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 25 (year 2037),  Features Intersected: MILL CREEK,  Facility Carried by Structure: TR520-HEATH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $303,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $481,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330548,  Location: 2MI E NY8 & NY28 (Lat: 43.633842,  Lng: -73.905306),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 62 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 87 (year 2037),  Features Intersected: MILL CREEK,  Facility Carried by Structure: HARRINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.620,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 83.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $690,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330549,  Location: 3 MI N OF THURMAN (Lat: 43.567403,  Lng: -73.893450),  Route carried "on" structure: Other road ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 18 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 25 (year 2040),  Design Load: H 20,  Features Intersected: GLEN CREEK,  Facility Carried by Structure: TR 370
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Operating Rating: 13.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $456,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 33055,  Location: 2 MI W OF THE GLEN (Lat: 43.568631,  Lng: -73.890408),  Route carried "on" structure: Other road ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 41 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 57 (year 2040),  Design Load: H 20,  Features Intersected: GLEN CREEK,  Facility Carried by Structure: TR470GLENCREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.556,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $681,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 336033,  Location: 2 MI NE 13TH LAKE (Lat: 43.732225,  Lng: -74.097811),  Route carried "on" structure: Other road ,  Year Built: 1966,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 249 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 349 (year 2035),  Design Load: HS 20,  Features Intersected: THIRTEENTHLAKE BR,  Facility Carried by Structure: 13TH LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $452,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336414,  Location: NORTH CREEK (Lat: 43.696883,  Lng: -73.985875),  Route carried "on" structure: County highway ,  Year Built: 1937,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 604 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 846 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NORTH CREEK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $883,000,  Roadway Improvement Cost: $517,000,  Total Project Cost: $1,400,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 337109,  Location: 500 FR FROM ny 8 (Lat: 43.638428,  Lng: -73.923714),  Route carried "on" structure: ServiceOther road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.19m (3.90ft),  Truck Traffic: 6%,  Features Intersected: JOHNSON BROOK,  Facility Carried by Structure: HARRINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.422,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 80.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber