Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Justice, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 174ft / 52.7mTotal length
  • $6,111,000Total costs
  • 14,755Total average daily traffic
  • 2,062Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Justice
  • No street view available for this location

New bridges in Justice, WV - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11960-1969
  • 51970-1979
  • 51980-1989
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Justice, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Justice, WV
Average Bridge Truck Traffic in Justice, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 30.8%Good
  • 7.7%Satisfactory
  • 30.8%Fair
  • 15.4%Poor
  • 7.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.7%Good
  • 14.3%Satisfactory
  • 35.7%Fair
  • 7.1%Poor
  • 7.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Good
  • 35.7%Satisfactory
  • 35.7%Fair
  • 7.1%Poor
  • 7.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Excellent
  • 28.6%Very good
  • 21.4%Good
  • 7.1%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 55A025,  Location: 0.42 MI N OF WV 97 (Lat: 37.595611,  Lng: -81.774131),  Route carried "on" structure: County highway 602,  Year Built: 1970,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 19.17m (62.89ft),  Average Daily Traffic: 1,300 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,365 (year 2039),  Design Load: HL 93,  Features Intersected: GUYANDOTTE RIVER&PARK RD,  Facility Carried by Structure: CR 6/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 55A079,  Location: 0.05 MI W OF CR 52/9 (Lat: 37.586900,  Lng: -81.821300),  Route carried "on" structure: US 5200,  Year Built: 1978,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 3,700 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 4,107 (year 2038),  Design Load: HS 20,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: US 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,600,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A08,  Location: 0.01 MI W OF CR 8 (Lat: 37.553819,  Lng: -81.788731),  Route carried "on" structure: US 5200,  Year Built: 1978,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 3,000 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,330 (year 2039),  Design Load: HS 20,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: US RT 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.709,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,600,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A081,  Location: 0.37 MI W OF CR 52/5 (Lat: 37.549119,  Lng: -81.793139),  Route carried "on" structure: US 5200,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 3,000 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,150 (year 2039),  Features Intersected: MUZZLE FORK,  Facility Carried by Structure: US RT 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.401,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $650,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A082,  Location: 0.01 MI. S. OF CRT 52/9 (Lat: 37.585261,  Lng: -81.821439),  Route carried "on" structure: County highway 5201,  Year Built: 1989,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 600 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 666 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: COUNTY ROUTE 52/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A083,  Location: 0.05 MI W OF US 52 (Lat: 37.561989,  Lng: -81.797119),  Route carried "on" structure: County highway 5202,  Year Built: 1979,  Status: Posted for load,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 105 (year 2039),  Features Intersected: HUFF CREEK,  Facility Carried by Structure: CO 52/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A215,  Location: 0.10 MI SOUTH OF CO 52/11 (Lat: 37.578600,  Lng: -81.813050),  Route carried "on" structure: County highway 5207,  Year Built: 2009,  Status: Open,  Structure Length: 1.47m (4.82ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 56 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: CO 52/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A238,  Location: 0.01 Miles South of US 52 (Lat: 37.558461,  Lng: -81.790750),  Route carried "on" structure: Other road 941,  Year Built: 2003,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 60 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 67 (year 2039),  Features Intersected: Huff Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.56m (5.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: CEPORHWV1129636,  Location: SUTTON LAKE CAMPGROUND (Lat: 38.675392,  Lng: -80.547361),  Route carried "on" structure: ServiceFederal lands road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 50 (year 2039),  Design Load: HS 20,  Features Intersected: LOWER KANAWHA RUN,  Facility Carried by Structure: ARCH BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.56m (5.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $93,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: CEPORHWV3023102,  Location: R.D. BAILEY LAKE (Lat: 37.611972,  Lng: -81.739333),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1931,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 11.07m (36.32ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 20,  Features Intersected: GUYANDOTTE RIVER,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 1,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 5.7m (18.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 19.08m (62.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $565,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $571,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: CEPORHWV3028304,  Location: R.D. BAILEY LAKE (Lat: 37.611458,  Lng: -81.742614),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1983,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 20,  Features Intersected: REEDY CREEK,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 1,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $176,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: CEPORHWV5058303,  Location: R.D. BAILEY LAKE (Lat: 37.604708,  Lng: -81.730722),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1983,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2037),  Design Load: H 20,  Features Intersected: WOLFPEN BRANCH,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 1,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $62,000 ( Estimate for 2020),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: CEPORHWV5058422,  Location: R.D. BAILEY LAKE (Lat: 37.597950,  Lng: -81.827833),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HS 20,  Features Intersected: OUTLET CHANNEL,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.57m (8.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $39,000 ( Estimate for 2020),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: CEPORHWV5058805,  Location: R.D. BAILEY LAKE (Lat: 37.596269,  Lng: -81.829056),  Route carried "on" structure: Spur Federal lands road ,  Year Built: 1988,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 125 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE HUFF CREEK,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.95m (16.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $20,000 ( Estimate for 2020),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30A193,  Location: 0.05 MI. NO. OF CR 52/47 (Lat: 37.601539,  Lng: -81.827281),  Route carried "under" structure: County highway 5223,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2016),  Features Intersected: COUNTY ROUTE 52/23,  Facility Carried by Structure: NS RAILROAD
Minimum Vertical Clearance: 15.24m (50.00ft),  Kilometerpoint: 0.080,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.5m (67.3ft)

Find on map >>   Show street view

Structure Number: 55A202,  Location: 0.01 MI E OF US 52 (Lat: 37.580089,  Lng: -81.803300),  Route carried "under" structure: State highway 9700,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,600 (year 2018),  Truck Traffic: 10%,  Features Intersected: NORFOLK SOUTHERN RW,  Facility Carried by Structure: N S RAILWAY
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.016,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.2m (53.1ft)

Discuss Justice, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.