Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kachina Village, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 52ft / 16.1mTotal length
  • $1,000Total costs
  • 30,224Total average daily traffic
  • 3,969Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kachina Village
  • No street view available for this location

New bridges in Kachina Village, AZ - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61990-1999
  • 32000-2009
Average Bridge Daily Traffic in Kachina Village, AZ
Average Bridge Truck Traffic in Kachina Village, AZ
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 62.5%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2091,  Location: 6.1 mi S Jct I-40 (Lat: 35.089800,  Lng: -111.686200),  Route carried "on" structure: Interstate 17,  Year Built: 1991,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 11,450 (year 2017),  Truck Traffic: 24%,  Average Future Daily Traffic: 11,460 (year 2038),  Design Load: HS 20,  Features Intersected: Kachina Blvd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 537.312,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6967,  Location: 9.4 mi S of Jct I 40 (Lat: 35.064600,  Lng: -111.733100),  Route carried "on" structure: Alternate State highway 89,  Year Built: 1936,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,858 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,868 (year 2036),  Design Load: HS 20,  Features Intersected: Fry Canyon
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 631.470,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 6998,  Location: 4.7 mi S Jct I-40 (Lat: 35.120200,  Lng: -111.707700),  Route carried "on" structure: Alternate State highway 89,  Year Built: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,858 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,868 (year 2036),  Design Load: HS 20,  Features Intersected: Landon Spring
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 638.765,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Total Project Cost: $1,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 6999,  Location: 7.0 mi S of Jct I 40 (Lat: 35.095900,  Lng: -111.732900),  Route carried "on" structure: Alternate State highway 89,  Year Built: 1994,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,858 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,868 (year 2036),  Design Load: HS 20,  Features Intersected: Woody Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 635.047,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 1059,  Location: 0.5 mi N Jct Kachina Blvd (Lat: 35.096200,  Lng: -111.684700),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 650 (year 2018),  Average Future Daily Traffic: 660 (year 2038),  Design Load: HS 20,  Features Intersected: Pumphouse Wash,  Facility Carried by Structure: Tovar Trail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10591,  Location: 0.3 mi N Jct Kachina Blvd (Lat: 35.093000,  Lng: -111.690500),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 2,670 (year 2018),  Average Future Daily Traffic: 2,680 (year 2038),  Design Load: HS 20,  Features Intersected: Pumphouse Wash,  Facility Carried by Structure: Kachina Trail
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 10592,  Location: 90 ft S Jct Ancient Trail (Lat: 35.088500,  Lng: -111.697600),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 380 (year 2018),  Average Future Daily Traffic: 390 (year 2038),  Design Load: HS 20,  Features Intersected: Pumphouse Wash,  Facility Carried by Structure: Tonalea Trail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018
Find on map >>   Show street view

Structure Number: 10593,  Location: 0.7 mi W Jct Kachina Tr. (Lat: 35.090600,  Lng: -111.698400),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 850 (year 2018),  Average Future Daily Traffic: 860 (year 2038),  Design Load: HS 20,  Features Intersected: Pumphouse Wash,  Facility Carried by Structure: Pinon Trail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 18.5m (60.7ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10594,  Location: 0.9 mi W Jct Kachina Tr (Lat: 35.091800,  Lng: -111.701400),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 850 (year 2018),  Average Future Daily Traffic: 860 (year 2038),  Design Load: HS 20,  Features Intersected: Pumphouse Wash,  Facility Carried by Structure: Pinon Trail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2091,  Location: 6.1 mi S Jct I-40 (Lat: 35.089800,  Lng: -111.686200),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 1,800 (year 2018),  Truck Traffic: 10%,  Features Intersected: Kachina Blvd,  Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Kachina Village, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.