Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Laguna, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 115ft / 35.1mTotal length
  • $4,111,000Total costs
  • 62,440Total average daily traffic
  • 20,195Total average daily truck traffic
  • 90,510Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Laguna
  • No street view available for this location

New bridges in Laguna, NM - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 31940-1949
  • 101950-1959
  • 11970-1979
  • 12000-2009
Reconstructed bridges in Laguna, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Laguna, NM
Average Bridge Truck Traffic in Laguna, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 33.3%Satisfactory
  • 50.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Good
  • 16.7%Satisfactory
  • 50.0%Fair
  • 16.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 50.0%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 64.7%Good
  • 35.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 8.3%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 3088,  Location: 2.5 MI W OF I-40/LAGUNA (Lat: 35.047047,  Lng: -107.408806),  Route carried "on" structure: State highway 124,  Year Built: 1936,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,071 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 921 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.934,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $56,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 3089,  Location: 15.5M E NM124-I40/LAGUNA (Lat: 35.046825,  Lng: -107.411300),  Route carried "on" structure: State highway 124,  Year Built: 1936,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 1,071 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 921 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.731,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $59,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 3303,  Location: 9.2 MI N OF JCT US-60 (Lat: 34.550147,  Lng: -106.755514),  Route carried "on" structure: State highway 304,  Year Built: 1973,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,126 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,686 (year 2040),  Features Intersected: SAN JUAN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.669,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 18 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $390,000 ( Estimate for 2030),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4295,  Location: 29.8 MI E OF ARIZ ST LINE (Lat: 34.326767,  Lng: -108.571956),  Route carried "on" structure: US 60,  Year Built: 1941,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 488 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 377 (year 2040),  Design Load: H 15,  Features Intersected: ARMSTRONG CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.898,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $202,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5354,  Location: 38.4 MI E OF JCT NM-36 (Lat: 34.185200,  Lng: -107.894283),  Route carried "on" structure: US 60,  Year Built: 1941,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 335 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 258 (year 2040),  Design Load: H 15,  Features Intersected: SWINGLE CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.014,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2019,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 5475,  Location: 0.5 MI W OF EXIT-114 (Lat: 35.038247,  Lng: -107.379950),  Route carried "on" structure: State highway 124,  Year Built: 1955,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 1,946 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 307 (year 2040),  Design Load: HS 20,  Features Intersected: RIO SAN JOSE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.928,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $330,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5476,  Location: 0.5 MI W OF EXIT-114 (Lat: 35.038100,  Lng: -107.379992),  Route carried "on" structure: State highway 124,  Year Built: 1955,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 1,946 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 307 (year 2040),  Design Load: HS 20,  Features Intersected: RIO SAN JOSE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.928,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $330,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5477,  Location: 0.1 MI E OF NM-279 (Lat: 35.045203,  Lng: -107.393056),  Route carried "on" structure: State highway 124,  Year Built: 1955,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 1,946 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 307 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.431,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $670,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5603,  Location: 7.20 MI S OF NM-337 (Lat: 34.694567,  Lng: -106.303242),  Route carried "on" structure: State highway 55,  Year Built: 1948,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 626 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 538 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.782,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 5654,  Location: 5.3 MI N OF NM-445/HOXIE (Lat: 36.772050,  Lng: -104.480958),  Route carried "on" structure: US 64,  Year Built: 1951,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 569 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 914 (year 2040),  Design Load: H 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 547.528,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018
Find on map >>   Show street view

Structure Number: 5762,  Location: 6.7 MI N OF JCT US-550 (Lat: 35.387947,  Lng: -106.457419),  Route carried "on" structure: Interstate 25,  Year Built: 1955,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 26,720 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 45,742 (year 2040),  Design Load: HS 20,  Features Intersected: N BRANCH MARIA CHAVEZ AR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 400.534,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 5921,  Location: JCT NM-519 @ LA MADERA (Lat: 36.390375,  Lng: -106.041992),  Route carried "on" structure: State highway 111,  Year Built: 1957,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 342 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 294 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.886,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018
Find on map >>   Show street view

Structure Number: 5922,  Location: 1.4 MI N OF JCT NM-519 (Lat: 36.400244,  Lng: -106.051378),  Route carried "on" structure: State highway 111,  Year Built: 1957,  Status: Open,  Structure Length: 2.28m (7.48ft),  Average Daily Traffic: 342 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 294 (year 2040),  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.139,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018
Find on map >>   Show street view

Structure Number: 5995,  Location: 2.0 MI E OF JCT NM-129 (Lat: 35.329094,  Lng: -104.226697),  Route carried "on" structure: State highway 104,  Year Built: 1959,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 123 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 106 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.746,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $710,000 ( Estimate for 2030),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6008,  Location: 22.7 MI E OF JCT US-491 (Lat: 35.447028,  Lng: -108.365606),  Route carried "on" structure: Interstate 40,  Year Built: 1957,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 20,726 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 35,481 (year 2040),  Design Load: HS 20,  Features Intersected: FOSTER CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.691,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $550,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $825,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 6046,  Location: 3.84 MI S OF US-60 (Lat: 34.404928,  Lng: -104.197664),  Route carried "on" structure: State highway 212,  Year Built: 1935,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 108 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 201 (year 2040),  Design Load: H 15,  Features Intersected: IRRIGATION CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $340,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6151,  Location: 0.1 MI W JCT NM 107/US 60 (Lat: 34.111714,  Lng: -107.257903),  Route carried "on" structure: US 60,  Year Built: 1958,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 655 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 505 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 179.764,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: M15,  Location: 7.2 KM S OF CASA BLANCA (Lat: 34.991350,  Lng: -107.485447),  Route carried "on" structure: Federal lands road L22,  Year Built: 2000,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 351 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: ACOMA WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.000,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other
Discuss Laguna, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.