  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 33ft / 9.8mTotal length
  • $2,620,000Total costs
  • 3,824Total average daily traffic
  • 469Total average daily truck traffic
  • 5,401Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lake Andes
  • No street view available for this location

New bridges in Lake Andes, SD - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 41940-1949
  • 11970-1979
  • 22000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Satisfactory
  • 60.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Satisfactory
  • 40.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Satisfactory
  • 20.0%Poor
  • 40.0%Serious
  • 20.0%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 20.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Very good
  • 20.0%Poor
  • 20.0%Serious
Find on map >>   Show street view

Structure Number: 1236823,  Location: 1.0N & 1.2W of Lake Andes (Lat: 43.169919,  Lng: -98.570875),  Route carried "on" structure: Other road ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Creek,  Facility Carried by Structure: 38080 291st Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $530,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $560,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12370267,  Location: 2.7S & 1.0W of Lake Andes (Lat: 43.116314,  Lng: -98.566075),  Route carried "on" structure: Other road ,  Year Built: 1979,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Creek,  Facility Carried by Structure: 29470 381st Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $604,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $634,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1237426,  Location: 1.5W & 2.9S Lake Andes (Lat: 43.126269,  Lng: -98.556239),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 20 (year 2020),  Average Future Daily Traffic: 20 (year 2040),  Design Load: HS 20,  Features Intersected: Garden Ck,  Facility Carried by Structure: 294th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 8.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1237624,  Location: 0.8 W JCT US 18 & 281 (Lat: 43.155311,  Lng: -98.554067),  Route carried "on" structure: State highway 50,  Year Built: 1941,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 548 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 791 (year 2041),  Design Load: H 15,  Features Intersected: GARDEN CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 504.240,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $12,000
Find on map >>   Show street view

Structure Number: 12389243,  Location: 0.6 E JCT SD 50 W (Lat: 43.150667,  Lng: -98.526933),  Route carried "on" structure: US 18,  Year Built: 2005,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,506 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,173 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: LAKE ANDES OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 546.662,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 12390232,  Location: 0.3N & 1.0E of Lake Andes (Lat: 43.166617,  Lng: -98.525992),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 4 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 4 (year 2032),  Features Intersected: Drainage Ditch,  Facility Carried by Structure: 29120 383rd Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Critical,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12394244,  Location: 1.0 E JCT SD 50 W (Lat: 43.149222,  Lng: -98.518864),  Route carried "on" structure: US 18,  Year Built: 2005,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 1,506 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,173 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: TRIB TO LAKE ANDES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 547.257,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 12405242,  Location: 0.2S & 2.5E Lake Andes (Lat: 43.153381,  Lng: -98.496422),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: Creek,  Facility Carried by Structure: 38450 292nd Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $561,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $591,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12410207,  Location: 3.3N & 3.0E of Lake Andes (Lat: 43.203681,  Lng: -98.486267),  Route carried "on" structure: Other road ,  Year Built: 1945,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Creek,  Facility Carried by Structure: 28870 385th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $392,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $422,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 1241221,  Location: 3.0N & 3.2E of Lake Andes (Lat: 43.198572,  Lng: -98.481878),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 48 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 48 (year 2032),  Features Intersected: Creek,  Facility Carried by Structure: 38520 289th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Serious,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $401,000 ( Estimate for 2019)
Discuss Lake Andes, South Dakota (SD) on our hugely popular South Dakota forum.