Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lindley, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 407ft / 124mTotal length
  • $66,736,000Total costs
  • 67,770Total average daily traffic
  • 19,784Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lindley
  • No street view available for this location

New bridges in Lindley, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 51960-1969
  • 31980-1989
  • 21990-1999
  • 42000-2009
  • 152010-2019
Reconstructed bridges in Lindley, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Lindley, NY
Average Bridge Truck Traffic in Lindley, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.0%Excellent
  • 24.0%Very good
  • 24.0%Good
  • 32.0%Satisfactory
  • 4.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.0%Excellent
  • 20.0%Very good
  • 40.0%Good
  • 16.0%Satisfactory
  • 4.0%Fair
  • 4.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.0%Excellent
  • 8.0%Very good
  • 36.0%Good
  • 16.0%Satisfactory
  • 24.0%Fair
  • 4.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.0%Excellent
  • 28.0%Very good
  • 24.0%Good
  • 28.0%Satisfactory
  • 12.0%Fair
  • 4.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 10111,  Location: 0.1 MI N JCT RTE 15 + CL (Lat: 42.001692,  Lng: -77.127144),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 2,146 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,238 (year 2040),  Design Load: HL 93,  Features Intersected: COWANESQUE RIVER,  Facility Carried by Structure: CR 115
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,957,000,  Roadway Improvement Cost: $1,146,000,  Total Project Cost: $3,103,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101111,  Location: 1.2 MI N JCT CR 115 + CL (Lat: 42.016108,  Lng: -77.130408),  Route carried "on" structure: County highway 15,  Year Built: 1953,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2,146 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,238 (year 2040),  Design Load: H 20,  Features Intersected: WATSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $719,000,  Roadway Improvement Cost: $421,000,  Total Project Cost: $1,141,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101112,  Location: 0.1 MI N OF LINDLEY (Lat: 42.029919,  Lng: -77.139194),  Route carried "on" structure: County highway 15,  Year Built: 1953,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,146 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,238 (year 2040),  Design Load: H 20,  Features Intersected: MORGAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.717,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $670,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1011131,  Location: .2 MI SOUTH OF PRESHO (Lat: 42.081944,  Lng: -77.152633),  Route carried "on" structure: Interstate 15U,  Year Built: 1969,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HS 20,  Features Intersected: S BR GLENDENING CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.767,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,128,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,788,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1011132,  Location: .2 MI SOUTH OF PRESHO (Lat: 42.082017,  Lng: -77.152378),  Route carried "on" structure: Interstate 15U,  Year Built: 1969,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HS 20,  Features Intersected: S BR GLENDENING CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.767,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,156,000,  Roadway Improvement Cost: $677,000,  Total Project Cost: $1,833,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 105455,  Location: AT PRESHO (Lat: 42.085464,  Lng: -77.156083),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 1,737 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,812 (year 2040),  Design Load: HS 20,  Features Intersected: 99I 15 6401 1064 (SB), R,  Facility Carried by Structure: COUNTY ROAD 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.225,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,746,000,  Roadway Improvement Cost: $1,608,000,  Total Project Cost: $4,354,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1078501,  Location: Lindley (Lat: 42.049292,  Lng: -77.140267),  Route carried "on" structure: Interstate 99,  Year Built: 2013,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HL 93,  Features Intersected: Stowell Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.985,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.0m (157.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 99.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,934,000,  Roadway Improvement Cost: $1,132,000,  Total Project Cost: $3,066,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078502,  Location: Lindley (Lat: 42.049333,  Lng: -77.139906),  Route carried "on" structure: Interstate 99,  Year Built: 2013,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HL 93,  Features Intersected: Stowell Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.985,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.0m (157.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 99.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,039,000,  Roadway Improvement Cost: $1,194,000,  Total Project Cost: $3,232,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078511,  Location: Rt15 over Morgan Creek (Lat: 42.028450,  Lng: -77.141308),  Route carried "on" structure: Interstate 99,  Year Built: 2013,  Status: Open,  Structure Length: 17.95m (58.89ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HL 93,  Features Intersected: Morgan Creek Rd, Morgan
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.733,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 70.9m (232.6ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.95m (58.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,904,000,  Roadway Improvement Cost: $3,458,000,  Total Project Cost: $9,362,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078512,  Location: Rt 15 over Morgan Creek (Lat: 42.028458,  Lng: -77.141058),  Route carried "on" structure: Interstate 99,  Year Built: 2013,  Status: Open,  Structure Length: 17.71m (58.10ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HL 93,  Features Intersected: Morgan Creek Rd, Morgan
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.733,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 70.3m (230.6ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.70m (58.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,814,000,  Roadway Improvement Cost: $3,405,000,  Total Project Cost: $9,218,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078521,  Location: Rt 15 over Watson Creek (Lat: 42.015369,  Lng: -77.131211),  Route carried "on" structure: Interstate 99,  Year Built: 2013,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HL 93,  Features Intersected: STERMER ROAD, Watson Cre
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.0m (164.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.21m (33.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,312,000,  Roadway Improvement Cost: $1,940,000,  Total Project Cost: $5,252,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078522,  Location: Rt 15 over Watson Creek (Lat: 42.015533,  Lng: -77.130964),  Route carried "on" structure: Interstate 99,  Year Built: 2013,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 4,752 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 8,864 (year 2040),  Design Load: HL 93,  Features Intersected: STERMER ROAD, Watson Cre
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.0m (164.0ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 90.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.21m (33.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,440,000,  Roadway Improvement Cost: $2,014,000,  Total Project Cost: $5,455,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107879,  Location: 1.15 mi SE of Lindley (Lat: 42.016969,  Lng: -77.127708),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 276 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 386 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Watson Creek,  Facility Carried by Structure: Kuhl Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $582,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221737,  Location: 2.2 MI NE OF LINDLEY (Lat: 42.048264,  Lng: -77.097278),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 42 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 59 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: COOKS CREEK,  Facility Carried by Structure: GRISWOLD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $689,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221739,  Location: 2.5 MILES SW OF PRESHO (Lat: 42.068869,  Lng: -77.194086),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 137 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: NB GLENDENNING CK,  Facility Carried by Structure: GLENDENNING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $704,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22174,  Location: 1.4 MI SW OF PRESHO (Lat: 42.074681,  Lng: -77.183442),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 137 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: N. BR GLENDENNING CRK,  Facility Carried by Structure: N GLENDENNING CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $564,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $894,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221741,  Location: .7 MILE WEST OF PRESHO (Lat: 42.079869,  Lng: -77.176303),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 137 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 192 (year 2037),  Design Load: HS 20,  Features Intersected: N B GLENDENING CK,  Facility Carried by Structure: N CLENDENNING CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.751,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $241,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221744,  Location: 2.7 MILES WEST OF LINDLEY (Lat: 42.040147,  Lng: -77.180481),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 6 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: S BR GLENDENNING CK,  Facility Carried by Structure: STOWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $404,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $641,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221745,  Location: 1.4 MI SW OF PRESHO (Lat: 42.066722,  Lng: -77.167117),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 110 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 154 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: S BR GLENDENN CK,  Facility Carried by Structure: BELL HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $290,000,  Total Project Cost: $786,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333284,  Location: .6 MILE WEST OF PRESHO (Lat: 42.079436,  Lng: -77.164303),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,293 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,348 (year 2040),  Design Load: HS 20,  Features Intersected: N B GLENDENING CK,  Facility Carried by Structure: COUNTY ROAD 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.228,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $819,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333394,  Location: IN PRESHO (Lat: 42.081433,  Lng: -77.147878),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 1,142 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,191 (year 2040),  Design Load: HS 20,  Features Intersected: TIOGA RIVER,  Facility Carried by Structure: COUNTY ROAD 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.07m (39.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,761,000,  Roadway Improvement Cost: $1,617,000,  Total Project Cost: $4,378,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333395,  Location: 1.8 MI SW OF PRESHO (Lat: 42.059367,  Lng: -77.132031),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,142 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,191 (year 2040),  Features Intersected: RYAS CREEK,  Facility Carried by Structure: COUNTY ROAD 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.282,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $682,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333396,  Location: 1.4 MI N OF LINDLEY (Lat: 42.048486,  Lng: -77.127650),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,142 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,191 (year 2040),  Features Intersected: COOKS CREEK,  Facility Carried by Structure: COUNTY ROAD 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.763,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $836,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333431,  Location: 1.0 MI NE OF LINDLEY (Lat: 42.039183,  Lng: -77.123664),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 292 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 409 (year 2038),  Design Load: HS 20,  Features Intersected: CHURCH CREEK,  Facility Carried by Structure: COUNTY ROAD 106
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $565,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333446,  Location: IN LINDLEY (Lat: 42.028647,  Lng: -77.132022),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 717 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,004 (year 2037),  Design Load: HL 93,  Features Intersected: TIOGA RIVER,  Facility Carried by Structure: COUNTY ROAD 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.031,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.76m (22.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,913,000,  Roadway Improvement Cost: $1,120,000,  Total Project Cost: $3,033,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333447,  Location: 1.1 MILES NE OF LINDLEY (Lat: 42.042675,  Lng: -77.114453),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 513 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 535 (year 2040),  Design Load: HS 20,  Features Intersected: TANNERY CREEK,  Facility Carried by Structure: COUNTY ROAD 120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $787,000,  Roadway Improvement Cost: $461,000,  Total Project Cost: $1,248,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333448,  Location: 1.6 MI NE OF LINDLEY (Lat: 42.043525,  Lng: -77.106453),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 513 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 535 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TANNERY CREEK,  Facility Carried by Structure: COUNTY ROAD 120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.995,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $908,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333477,  Location: IN PRESHO (Lat: 42.082542,  Lng: -77.150147),  Route carried "on" structure: County highway ,  Year Built: 1937,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 2,883 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,007 (year 2040),  Design Load: HS 20,  Features Intersected: S B GLENDENING CK,  Facility Carried by Structure: COUNTY ROAD 115
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.718,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $792,000,  Roadway Improvement Cost: $464,000,  Total Project Cost: $1,256,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105455,  Location: AT PRESHO (Lat: 42.085464,  Lng: -77.156083),  Route carried "under" structure: Interstate 15,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 11,097 (year 2019),  Truck Traffic: 33%,  Features Intersected: 99I 15 6401 1064 (SB), R,  Facility Carried by Structure: COUNTY ROAD 5
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 10.282,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 1078501,  Location: Lindley (Lat: 42.049292,  Lng: -77.140267),  Route carried "under" structure: Other road ,  Year Built: 2013,  Structure Length: 0. m,  Features Intersected: Stowell Rd,  Facility Carried by Structure: RTE 99
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.0m (157.5ft)

Find on map >>   Show street view

Structure Number: 1078502,  Location: Lindley (Lat: 42.049333,  Lng: -77.139906),  Route carried "under" structure: Other road ,  Year Built: 2013,  Structure Length: 0. m,  Features Intersected: Stowell Rd,  Facility Carried by Structure: RTE 99
Minimum Vertical Clearance: 9.07m (29.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.0m (157.5ft)

Find on map >>   Show street view

Structure Number: 1078512,  Location: Rt 15 over Morgan Creek (Lat: 42.028458,  Lng: -77.141058),  Route carried "under" structure: Other road ,  Year Built: 2013,  Structure Length: 0. m,  Features Intersected: Morgan Creek Rd, Morgan,  Facility Carried by Structure: RTE 99
Minimum Vertical Clearance: 17.37m (56.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 70.3m (230.6ft)

Find on map >>   Show street view

Structure Number: 1078521,  Location: Rt 15 over Watson Creek (Lat: 42.015369,  Lng: -77.131211),  Route carried "under" structure: Other road ,  Year Built: 2013,  Structure Length: 0. m,  Features Intersected: STERMER ROAD, Watson Cre,  Facility Carried by Structure: RTE 99
Minimum Vertical Clearance: 10.06m (33.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 1078522,  Location: Rt 15 over Watson Creek (Lat: 42.015533,  Lng: -77.130964),  Route carried "under" structure: Other road ,  Year Built: 2013,  Structure Length: 0. m,  Features Intersected: STERMER ROAD, Watson Cre,  Facility Carried by Structure: RTE 99
Minimum Vertical Clearance: 10.97m (35.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Discuss Lindley, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.