Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Linn Creek, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 118ft / 35.6mTotal length
  • $2,727,000Total costs
  • 118,015Total average daily traffic
  • 15,009Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Linn Creek
  • No street view available for this location

New bridges in Linn Creek, MO - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11950-1959
  • 21960-1969
  • 11980-1989
  • 41990-1999
  • 12010-2019
Average Bridge Daily Traffic in Linn Creek, MO
Average Bridge Truck Traffic in Linn Creek, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 62.5%Good
  • 12.5%Satisfactory
  • 12.5%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 12.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 12.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Excellent
  • 37.5%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Good
  • 62.5%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 11729,  Location: S 17 T 38 N R 16 W (Lat: 38.030375,  Lng: -92.714806),  Route carried "on" structure: US 54,  Year Built: 1964,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 26,146 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 45,756 (year 2041),  Design Load: HS 20,  Features Intersected: SOUTH F0RK LINN CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.037,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.45m (1.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $634,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 11731,  Location: S 17 T 38 N R 16 W (Lat: 38.037981,  Lng: -92.706825),  Route carried "on" structure: US 54,  Year Built: 1964,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 33,755 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 59,071 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH FORK LINN CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 182.131,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.59m (1.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $831,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 1193,  Location: S 33 T 39 N R 16 W (Lat: 38.077086,  Lng: -92.690108),  Route carried "on" structure: State highway Y,  Year Built: 1999,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 3,264 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,528 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: US 54
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.183,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20196,  Location: S 8 T 38 N R 16 W (Lat: 38.037722,  Lng: -92.710333),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,170 (year 2041),  Features Intersected: S FORK OF LINN CR,  Facility Carried by Structure: EAST VALLEY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3557,  Location: S 17 T 38 N R 16 W (Lat: 38.037981,  Lng: -92.706822),  Route carried "on" structure: ServiceState highway 54,  Year Built: 2017,  Status: Open,  Structure Length: 5.87m (19.26ft),  Average Daily Traffic: 1,268 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,536 (year 2041),  Features Intersected: NORTH FORK OF LINN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.219,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.4m (63.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4162,  Location: S 17 T 38 N R 16 W (Lat: 38.038158,  Lng: -92.707028),  Route carried "on" structure: US 54,  Year Built: 1995,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 16,384 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 28,672 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: NORTH FORK LINN CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 255.292,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.58m (1.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $918,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6698,  Location: S 28 T 38 N R 16 W (Lat: 37.999769,  Lng: -92.684267),  Route carried "on" structure: State highway V,  Year Built: 1955,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,604 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,208 (year 2041),  Design Load: H 10,  Features Intersected: TOLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.599,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 944,  Location: S 8 T 58 N R 35 W (Lat: 39.857969,  Lng: -94.858850),  Route carried "on" structure: Interstate 229,  Year Built: 1985,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 1,792 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 3,763 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: DILLON CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.862,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 944,  Location: S 17 T 38 N R 16 W (Lat: 38.036244,  Lng: -92.711972),  Route carried "on" structure: State highway V,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 625 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,250 (year 2041),  Design Load: H 10,  Features Intersected: LINN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.20m (0.66ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $344,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1193,  Location: S 33 T 39 N R 16 W (Lat: 38.077086,  Lng: -92.690108),  Route carried "under" structure: US 54,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 14,400 (year 2021),  Truck Traffic: 13%,  Features Intersected: US 54,  Facility Carried by Structure: RT Y E
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 250.569,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1193,  Location: S 33 T 39 N R 16 W (Lat: 38.077086,  Lng: -92.690108),  Route carried "under" structure: US 54,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 18,177 (year 2021),  Truck Traffic: 13%,  Features Intersected: US 54,  Facility Carried by Structure: RT Y E
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 186.919,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Discuss Linn Creek, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.