Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marathon, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 171ft / 51.9mTotal length
  • $35,454,000Total costs
  • 64,202Total average daily traffic
  • 14,779Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marathon
  • No street view available for this location

New bridges in Marathon, NY - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 21950-1959
  • 71960-1969
  • 11970-1979
  • 21980-1989
  • 11990-1999
  • 72010-2019
Reconstructed bridges in Marathon, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Marathon, NY
Average Bridge Truck Traffic in Marathon, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Excellent
  • 23.1%Very good
  • 30.8%Good
  • 15.4%Satisfactory
  • 15.4%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Excellent
  • 25.0%Very good
  • 18.8%Good
  • 18.8%Satisfactory
  • 6.3%Fair
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Excellent
  • 18.8%Very good
  • 31.3%Good
  • 18.8%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 23.5%Good
  • 35.3%Satisfactory
  • 17.6%Fair
  • 11.8%Poor
  • 5.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 60.0%Satisfactory
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: 100834,  Location: 0.1 MI N JCT RTS 11 & 221 (Lat: 42.442242,  Lng: -76.032833),  Route carried "on" structure: US 11,  Year Built: 1999,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,877 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,624 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HUNTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.942,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,276,000,  Roadway Improvement Cost: $747,000,  Total Project Cost: $2,023,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031281,  Location: 2.1MI N JCT RTS I-81 + 26 (Lat: 42.400833,  Lng: -76.009958),  Route carried "on" structure: Interstate 81,  Year Built: 2011,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 10,338 (year 2011),  Truck Traffic: 25%,  Design Load: HL 93,  Features Intersected: EAST HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.589,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,354,000,  Roadway Improvement Cost: $793,000,  Total Project Cost: $2,146,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031282,  Location: 2.1MI N JCT RTS I-81 + 26 (Lat: 42.400889,  Lng: -76.009233),  Route carried "on" structure: Interstate 81,  Year Built: 2010,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 7,914 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 9,425 (year 2040),  Design Load: HL 93,  Features Intersected: EAST HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.589,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,287,000,  Roadway Improvement Cost: $754,000,  Total Project Cost: $2,041,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031301,  Location: JCT OF RTS 221 + I-81 SB (Lat: 42.442192,  Lng: -76.031606),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 10,386 (year 2011),  Truck Traffic: 30%,  Design Load: HS 20,  Features Intersected: RTE 221
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.974,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $886,000,  Roadway Improvement Cost: $519,000,  Total Project Cost: $1,405,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1031302,  Location: JCT OF RTS 221 + I-81 NB (Lat: 42.442303,  Lng: -76.031447),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 7,486 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 8,391 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 221
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.974,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $859,000,  Roadway Improvement Cost: $503,000,  Total Project Cost: $1,361,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103131,  Location: I81 NB & SB @ MARATHON (Lat: 42.442694,  Lng: -76.031808),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 14,971 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 16,782 (year 2040),  Design Load: HS 20,  Features Intersected: HUNTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $547,000,  Total Project Cost: $1,482,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10418,  Location: .2 MI W JCT SH 221 & US11 (Lat: 42.440311,  Lng: -76.035461),  Route carried "on" structure: State highway 221,  Year Built: 1932,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 1,753 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,450 (year 2040),  Design Load: HS 20,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 18.423,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.45m (17.88ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $3,677,000,  Roadway Improvement Cost: $2,153,000,  Total Project Cost: $5,829,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 104181,  Location: 2.5 MI NE JCT RTS 221 +11 (Lat: 42.455964,  Lng: -75.987997),  Route carried "on" structure: State highway 221,  Year Built: 1934,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 816 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,140 (year 2040),  Features Intersected: MERRILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.816,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $568,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107909,  Location: RAMP TO I81 NB @ MARATHON (Lat: 42.442869,  Lng: -76.031353),  Route carried "on" structure: Ramp County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 607 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 680 (year 2040),  Design Load: HS 20,  Features Intersected: Hunt's Creek,  Facility Carried by Structure: I 81 NB ON RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $533,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320742,  Location: 3.8 MI S OF TEXAS VALLEY (Lat: 42.433664,  Lng: -75.984197),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 34 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 48 (year 2038),  Features Intersected: MERRILL CREEK,  Facility Carried by Structure: COLD SPRING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Serious,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $581,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 331203,  Location: 3.2 MI N OF MARATHON (Lat: 42.474481,  Lng: -76.032864),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 465 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 651 (year 2037),  Features Intersected: HUNTS CREEK,  Facility Carried by Structure: McGRAW MARATHON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.510,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $436,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331204,  Location: 2.4 MI N OF MARATHON (Lat: 42.464381,  Lng: -76.032886),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 485 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 679 (year 2037),  Features Intersected: HUNTS CREEK,  Facility Carried by Structure: McGRAW MARATHON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331205,  Location: 1.7 MI N OF MARATHON (Lat: 42.455889,  Lng: -76.031047),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 888 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,243 (year 2037),  Features Intersected: HUNTS CREEK,  Facility Carried by Structure: McGRAW MARATHON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $686,000,  Total Project Cost: $1,857,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331206,  Location: 3.2 MI NE OF MARATHON (Lat: 42.467653,  Lng: -75.988406),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 368 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 515 (year 2040),  Features Intersected: W BR MERRILL CRK,  Facility Carried by Structure: TEXAS VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $409,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331207,  Location: 3.5 MI NE OF MARATHON (Lat: 42.476772,  Lng: -75.981325),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 211 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 295 (year 2040),  Design Load: HS 20,  Features Intersected: MERRILL CREEK,  Facility Carried by Structure: TEXAS VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $529,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $839,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33494,  Location: 2.8 MILES NORTH OF LISLE (Lat: 42.401364,  Lng: -76.015233),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 811 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,135 (year 2038),  Features Intersected: TIOUGHNIOGA RIVER,  Facility Carried by Structure: JENNINGS CREEK RD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 4.763,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 54.8m (179.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $5,578,000,  Roadway Improvement Cost: $3,267,000,  Total Project Cost: $8,845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334941,  Location: HAMLET OF KILLAWOG (Lat: 42.400594,  Lng: -76.022244),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 339 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 475 (year 2039),  Design Load: HS 20,  Features Intersected: BIG BROOK,  Facility Carried by Structure: CR156 JENNINGS CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.248,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $579,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $919,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334942,  Location: 1.2 MI. WEST OF KILLAWOG (Lat: 42.404389,  Lng: -76.045914),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 168 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 235 (year 2039),  Design Load: HS 20,  Features Intersected: BIG BROOK,  Facility Carried by Structure: JENNINGS CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.172,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $1,211,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334944,  Location: AT KILLAWOG (Lat: 42.401592,  Lng: -76.021092),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 247 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 346 (year 2037),  Design Load: HL 93,  Features Intersected: BIG BROOK,  Facility Carried by Structure: CR37 KILLAWOG RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.457,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $823,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334952,  Location: 1.0 MI WEST OF KILLAWOG (Lat: 42.401036,  Lng: -76.029381),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 35 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 49 (year 2038),  Features Intersected: BIG BROOK,  Facility Carried by Structure: OREGON HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.632,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 91.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $895,000,  Roadway Improvement Cost: $524,000,  Total Project Cost: $1,418,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 337106,  Location: 1.2 mi SE Jct I81 & Rt 22 (Lat: 42.459244,  Lng: -76.030394),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 485 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 679 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: HUNTS CREEK TRIBU,  Facility Carried by Structure: MCGRAW-MARATHON R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $251,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031281,  Location: 2.1MI N JCT RTS I-81 + 26 (Lat: 42.400833,  Lng: -76.009958),  Route carried "under" structure: Spur Other road ,  Year Built: 2011,  Structure Length: 0. m,  Features Intersected: EAST HILL ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 1031282,  Location: 2.1MI N JCT RTS I-81 + 26 (Lat: 42.400889,  Lng: -76.009233),  Route carried "under" structure: Spur Other road ,  Year Built: 2010,  Structure Length: 0. m,  Features Intersected: EAST HILL ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 1031301,  Location: JCT OF RTS 221 + I-81 SB (Lat: 42.442192,  Lng: -76.031606),  Route carried "under" structure: State highway 221,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,759 (year 2002),  Features Intersected: RTE 221,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 18.986,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 1031302,  Location: JCT OF RTS 221 + I-81 NB (Lat: 42.442303,  Lng: -76.031447),  Route carried "under" structure: State highway 221,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,759 (year 2002),  Features Intersected: RTE 221,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 18.986,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Discuss Marathon, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.