Bridge Statistics for McKenzie, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 269ft / 82.1mTotal length
  • $36,661,000Total costs
  • 28,302Total average daily traffic
  • 3,133Total average daily truck traffic
  • 40,979Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for McKenzie
  • No street view available for this location

New bridges in McKenzie, AL - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 41950-1959
  • 31960-1969
  • 11980-1989
  • 81990-1999
  • 92000-2009
  • 12020-2022
Reconstructed bridges in McKenzie, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in McKenzie, AL
Average Bridge Truck Traffic in McKenzie, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.8%Very good
  • 50.0%Good
  • 11.1%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 50.0%Good
  • 22.2%Satisfactory
  • 11.1%Fair
  • 5.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.4%Excellent
  • 20.7%Very good
  • 41.4%Good
  • 20.7%Satisfactory
  • 13.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 45.5%Good
  • 45.5%Satisfactory
Find on map >>   Show street view

Structure Number: 1744,  Location: 0.4 MI.S.CREN. #77 (Lat: 31.490983,  Lng: -86.372867),  Route carried "on" structure: US 29,  Year Built: 1938,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 1,530 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,085 (year 2033),  Design Load: H 15,  Features Intersected: HORNET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.268,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.05m (16.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,027,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4625,  Location: 2MI. SOUTH MCKENZIE (Lat: 31.515461,  Lng: -86.728981),  Route carried "on" structure: County highway 47,  Year Built: 1962,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 280 (year 1995),  Truck Traffic: 8%,  Average Future Daily Traffic: 486 (year 2035),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $253,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5937,  Location: 3MI. SW SHREVE (Lat: 31.485478,  Lng: -86.719139),  Route carried "on" structure: County highway 51,  Year Built: 1957,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 271 (year 1995),  Truck Traffic: 4%,  Average Future Daily Traffic: 474 (year 2035),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $370,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7397,  Location: 1 MI NE OF BROOKS (Lat: 31.490100,  Lng: -86.672206),  Route carried "on" structure: County highway 35,  Year Built: 1961,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 220 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 287 (year 2030),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $319,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7841,  Location: 2 1/2 MI N OF BROOKS (Lat: 31.501994,  Lng: -86.686083),  Route carried "on" structure: County highway ,  Year Built: 1932,  Year Reconstructed: 1963,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 220 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 327 (year 2032),  Features Intersected: MILL CREEK,  Facility Carried by Structure: COUNTY DIRT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $198,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8827,  Location: 3.8 MI WEST SHREVE (Lat: 31.511861,  Lng: -86.770147),  Route carried "on" structure: County highway 71,  Year Built: 1965,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 3%,  Average Future Daily Traffic: 271 (year 2034),  Design Load: HS 15,  Features Intersected: PINEY WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $849,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12477,  Location: NW CORNER OF COV COLINE (Lat: 31.522653,  Lng: -86.694739),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 140 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 172 (year 2030),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: COUNTY DIRT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $334,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13466,  Location: 3.9 MI N.W.SHREVE (Lat: 31.521042,  Lng: -86.769803),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 1985,  Status: Posted for load,  Structure Length: 2.78m (9.12ft),  Average Daily Traffic: 75 (year 1995),  Average Future Daily Traffic: 137 (year 2034),  Features Intersected: PINEY WOODS CREEK,  Facility Carried by Structure: COUNTY LINE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $558,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 13953,  Location: 2.5 MI.E.MCKENZIE (Lat: 31.544350,  Lng: -86.662333),  Route carried "on" structure: County highway 45,  Year Built: 1986,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 325 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 380 (year 2038),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $422,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15689,  Location: 3.2 MI N CO RD 24 (Lat: 31.501300,  Lng: -86.766344),  Route carried "on" structure: US 31,  Year Built: 1993,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 650 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 975 (year 2039),  Design Load: HS 20,  Features Intersected: BOGGY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.452,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $687,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $756,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16663,  Location: 2.4MI N CONECUH CO LINE (Lat: 31.549003,  Lng: -86.735622),  Route carried "on" structure: US 31,  Year Built: 1995,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,710 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 6,080 (year 2031),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.405,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,242,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,466,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17438,  Location: CO RD 81 TO STATE RD 84 (Lat: 31.098800,  Lng: -85.176819),  Route carried "on" structure: County highway 75,  Year Built: 2000,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 591 (year 1900),  Truck Traffic: 10%,  Average Future Daily Traffic: 591 (year 2033),  Design Load: HS 20,  Features Intersected: WOFFORD CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17439,  Location: STATE RD 53 TO D.HODGE RD (Lat: 31.083117,  Lng: -85.366836),  Route carried "on" structure: County highway 33,  Year Built: 2000,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 300 (year 1900),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2033),  Design Load: HS 20,  Features Intersected: DOUBLE BRIDGE CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $946,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,041,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17441,  Location: CIRCLE TO CO RD 55 (Lat: 31.267678,  Lng: -85.352106),  Route carried "on" structure: County highway 48,  Year Built: 2000,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,503 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2033),  Features Intersected: OMUSSE CREEK,  Facility Carried by Structure: KINSEY RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $946,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,041,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17603,  Location: 0.6 MI. WEST CO 005 (Lat: 33.561092,  Lng: -86.019558),  Route carried "on" structure: County highway 466,  Year Built: 1999,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 280 (year 2018),  Average Future Daily Traffic: 520 (year 2038),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 8.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $334,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17606,  Location: AL 149 * UNIV BLVD (Lat: 33.459400,  Lng: -86.797692),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 478 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,085 (year 2040),  Design Load: HS 20,  Features Intersected: SHADES CREEK,  Facility Carried by Structure: UNIVERSITY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,419,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17607,  Location: AL 149/UNIV PK DR (Lat: 33.461217,  Lng: -86.793833),  Route carried "on" structure: City street 149,  Year Built: 1998,  Status: Open,  Structure Length: 7.08m (23.23ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 665 (year 2040),  Design Load: HS 20,  Features Intersected: SHADES CREEK,  Facility Carried by Structure: UNIVERSITY PARK DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.9m (68.6ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.11m (26.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,837,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $3,121,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17608,  Location: 1.7 MI N OF AL 10 (Lat: 31.685558,  Lng: -85.491872),  Route carried "on" structure: County highway 41,  Year Built: 1957,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 250 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2037),  Design Load: HS 15,  Features Intersected: CHANEY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17609,  Location: 1. 7 MI N OF STATE 111 (Lat: 32.666806,  Lng: -86.400056),  Route carried "on" structure: County highway 276,  Year Built: 1999,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 30 (year 2005),  Average Future Daily Traffic: 40 (year 2030),  Design Load: HS 20,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: Ruffin Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $648,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $713,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17628,  Location: 2.7 MI. N INT 10 * 187 (Lat: 32.188800,  Lng: -88.269733),  Route carried "on" structure: County highway 187,  Year Built: 1953,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 620 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 920 (year 2036),  Design Load: HS 20,  Features Intersected: MCCALL'S BRANCH,  Facility Carried by Structure: CNTY. ROAD #9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $551,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17678,  Location: 2.6 MI N OF LINDEN (Lat: 32.354217,  Lng: -87.771717),  Route carried "on" structure: State highway 69,  Year Built: 2020,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 1,860 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,418 (year 2033),  Design Load: HS 20,  Features Intersected: WHIRL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.107,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,109,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17679,  Location: 7.6 MI. NW U.S.82 (Lat: 33.335447,  Lng: -87.753981),  Route carried "on" structure: County highway 83,  Year Built: 1999,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 400 (year 2018),  Average Future Daily Traffic: 500 (year 2036),  Design Load: HS 20,  Features Intersected: SIPSEY RIVER RELIEF BRG.,  Facility Carried by Structure: UPPER COLUMBUS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.799,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17682,  Location: 3 MI E OF ENON (Lat: 31.173719,  Lng: -86.342169),  Route carried "on" structure: County highway 85,  Year Built: 1999,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 270 (year 1994),  Truck Traffic: 4%,  Average Future Daily Traffic: 401 (year 2030),  Design Load: HS 20,  Features Intersected: PRICES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17831,  Location: 2.2 MI NORTH OF MCKENZIE (Lat: 31.576297,  Lng: -86.738403),  Route carried "on" structure: US 31,  Year Built: 2003,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 3,960 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,490 (year 2031),  Design Load: HS 20,  Features Intersected: PERSIMMON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.455,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.99m (36.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,574,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $6,131,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17832,  Location: 2.7 MI NORTH OF MCKENZIE (Lat: 31.582372,  Lng: -86.736706),  Route carried "on" structure: US 31,  Year Built: 2003,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 4,520 (year 2011),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,410 (year 2031),  Design Load: HS 20,  Features Intersected: PERSIMMON CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 191.227,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,307,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $3,638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17833,  Location: 2.4 MI NORTH OF MCKENZIE (Lat: 31.578381,  Lng: -86.737817),  Route carried "on" structure: US 31,  Year Built: 2003,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 3,960 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,490 (year 2031),  Design Load: HS 20,  Features Intersected: PERSIMMON CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.772,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,307,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $3,638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18514,  Location: 1.6 MI.WEST OF MCKENZIE (Lat: 31.538753,  Lng: -86.762811),  Route carried "on" structure: County highway 78,  Year Built: 2003,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 111 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 250 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB.OF PINEY WOODS CREK,  Facility Carried by Structure: CR. 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $740,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $814,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18515,  Location: 2.0 MI. WEST MCKENZIE (Lat: 31.544125,  Lng: -86.756847),  Route carried "on" structure: County highway 79Z,  Year Built: 2003,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 48 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 55 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB.OF PINEYWOODS CREEK,  Facility Carried by Structure: PATRICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $558,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20001,  Location: 1 MI. SO OF SHREEVE (Lat: 31.478378,  Lng: -86.706417),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 50 (year 1995),  Average Future Daily Traffic: 70 (year 2034),  Features Intersected: REEDY CREEK,  Facility Carried by Structure: APPLE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.6m (28.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $461,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber