Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mexico, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 89ft / 26.9mTotal length
  • $15,655,000Total costs
  • 16,880Total average daily traffic
  • 1,463Total average daily truck traffic
  • 21,346Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mexico
  • No street view available for this location

New bridges in Mexico, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 21950-1959
  • 31980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
Reconstructed bridges in Mexico, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 32000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Excellent
  • 46.7%Good
  • 33.3%Satisfactory
  • 13.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Excellent
  • 13.3%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Excellent
  • 20.0%Very good
  • 13.3%Good
  • 13.3%Satisfactory
  • 40.0%Fair
  • 6.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 52.9%Good
  • 29.4%Satisfactory
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 100033,  Location: .8 MI N JCT SH 3 & SH 104 (Lat: 43.467756,  Lng: -76.232536),  Route carried "on" structure: State highway 3,  Year Built: 2002,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 1,478 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,487 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LITT SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.990,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.0m (75.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $652,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $1,033,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100034,  Location: 6.2 MI S JCT RTS 3 + 13 (Lat: 43.502950,  Lng: -76.232750),  Route carried "on" structure: State highway 3,  Year Built: 2002,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,478 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,487 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SAGE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.916,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $743,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103662,  Location: .2 MI E JCT SH 104 & SH 3 (Lat: 43.459847,  Lng: -76.226578),  Route carried "on" structure: State highway 104,  Year Built: 1992,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 3,027 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,129 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.709,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,068,000,  Roadway Improvement Cost: $625,000,  Total Project Cost: $1,693,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103672,  Location: 1.2 MI W JCT SH104B & SH3 (Lat: 43.512469,  Lng: -76.247581),  Route carried "on" structure: State highway 104B,  Year Built: 1927,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 3,046 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,258 (year 2040),  Design Load: HS 20,  Features Intersected: LITT SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.820,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,904,000,  Roadway Improvement Cost: $1,115,000,  Total Project Cost: $3,018,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103673,  Location: 0.7 MI W JCT RTS 104B + 3 (Lat: 43.513019,  Lng: -76.235894),  Route carried "on" structure: State highway 104B,  Year Built: 1951,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,046 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,258 (year 2040),  Design Load: H 20,  Features Intersected: SAGE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,129,000,  Roadway Improvement Cost: $661,000,  Total Project Cost: $1,790,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 220899,  Location: 2.0 MI NE OF MEXICO (Lat: 43.478278,  Lng: -76.193022),  Route carried "on" structure: Other road ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 78 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 109 (year 2040),  Features Intersected: SAGE CREEK,  Facility Carried by Structure: COLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $293,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220906,  Location: AT MEXICO (Lat: 43.453978,  Lng: -76.229933),  Route carried "on" structure: Other road ,  Year Built: 1897,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,340 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,876 (year 2037),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: MUNGER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $350,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320898,  Location: 2.6 MI E OF MEXICO (Lat: 43.466814,  Lng: -76.180047),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 282 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 395 (year 2039),  Design Load: HS 20,  Features Intersected: SAGE CREEK,  Facility Carried by Structure: TUBBS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.186,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $259,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3209,  Location: 2.0 MI N OF MEXICO (Lat: 43.492283,  Lng: -76.228150),  Route carried "on" structure: Other road ,  Year Built: 1948,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 158 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 221 (year 2036),  Features Intersected: SAGE CREEK,  Facility Carried by Structure: COUNTRYMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $445,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320901,  Location: 1.4 MI N OF MEXICO (Lat: 43.485319,  Lng: -76.225233),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 149 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 209 (year 2040),  Features Intersected: SAGE CREEK,  Facility Carried by Structure: MINCLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $406,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 320902,  Location: 1.5 MI NE OF MEXICO (Lat: 43.482692,  Lng: -76.215631),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 151 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 211 (year 2038),  Features Intersected: SAGE CREEK,  Facility Carried by Structure: FORT LEAZIER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $492,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320904,  Location: 3.0 MI N OF MEXICO (Lat: 43.505617,  Lng: -76.232783),  Route carried "on" structure: Other road ,  Year Built: 1904,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 270 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 378 (year 2036),  Features Intersected: SAGE CREEK,  Facility Carried by Structure: KRANZ ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $459,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320905,  Location: 2 MILES NW OF MEXICO (Lat: 43.494283,  Lng: -76.249297),  Route carried "on" structure: Other road ,  Year Built: 1954,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 255 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 357 (year 2036),  Features Intersected: LITT SALMON RIVER,  Facility Carried by Structure: GEORGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.2m (56.4ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $647,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331383,  Location: VILLAGE OF MEXICO (Lat: 43.466750,  Lng: -76.237514),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 806 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,128 (year 2036),  Design Load: HS 20,  Features Intersected: LITTLE SALMON RIV,  Facility Carried by Structure: CR 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $646,000,  Roadway Improvement Cost: $378,000,  Total Project Cost: $1,024,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 331384,  Location: 2.8 MI NE OF PHOENIX (Lat: 43.511642,  Lng: -76.252694),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 574 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 804 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: LITTLE SALMON RIV,  Facility Carried by Structure: TEXAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.195,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $1,218,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331385,  Location: 2.5 MI NE OF MEXICO (Lat: 43.479031,  Lng: -76.191981),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 597 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 836 (year 2036),  Design Load: HS 20,  Features Intersected: SAGE CREEK,  Facility Carried by Structure: CR41 Mexico Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.586,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $758,000,  Roadway Improvement Cost: $444,000,  Total Project Cost: $1,202,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 336584,  Location: IN MEXICO (Lat: 43.470039,  Lng: -76.245558),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 145 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 203 (year 2038),  Features Intersected: LITTLE SALMON RIVER,  Facility Carried by Structure: RIVER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $583,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Mexico, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.