Bridge Statistics for Montgomery, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 285ft / 87.2mTotal length
  • $14,549,000Total costs
  • 129,949Total average daily traffic
  • 8,403Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montgomery
  • No street view available for this location

New bridges in Montgomery, WV - historical statistics
  • New bridges - historical statistics
  • 81950-1959
  • 21960-1969
  • 11970-1979
  • 12000-2009
Average Bridge Daily Traffic in Montgomery, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.1%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Good
  • 71.4%Fair
  • 14.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Satisfactory
  • 28.6%Fair
  • 42.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 10A02,  Location: 0.12 Miles S. of WV 61 (Lat: 38.182469,  Lng: -81.316819),  Route carried "on" structure: State highway 600,  Year Built: 1956,  Status: Posted for load,  Structure Length: 50.75m (166.50ft),  Average Daily Traffic: 17,736 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,638 (year 2039),  Design Load: HS 20,  Features Intersected: Kanawha River US60 WV61,  Facility Carried by Structure: WV 6
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 18.0m (59.1ft), Horizontal Clearance: 145.7m (478.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 14,  Length of Maximum Span: 148.2m (486.2ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Excellent,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 50.75m (166.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $6,484,000,  Roadway Improvement Cost: $1,167,000,  Total Project Cost: $9,388,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10A233,  Location: 0.25 Miles N. of WV 61 (Lat: 38.181511,  Lng: -81.317219),  Route carried "on" structure: Ramp State highway 600,  Year Built: 1956,  Status: Posted for load,  Structure Length: 7.08m (23.23ft),  Average Daily Traffic: 16,536 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,166 (year 2039),  Design Load: H 20,  Features Intersected: NO FEATURE INTERSECTED,  Facility Carried by Structure: WV 6 S APP. RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 39.1m (128.3ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10A234,  Location: 0.25 Miles N. of WV 61 (Lat: 38.181650,  Lng: -81.317350),  Route carried "on" structure: Ramp State highway 600,  Year Built: 1956,  Status: Posted for load,  Structure Length: 7.08m (23.23ft),  Average Daily Traffic: 19,600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 23,912 (year 2039),  Design Load: H 20,  Features Intersected: NO FEATURE INTERSECTED,  Facility Carried by Structure: WV 6 S EXIT RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 39.1m (128.3ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $558,000,  Total Project Cost: $1,356,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A177,  Location: 0.10 MI S OF CR 61/11 (Lat: 38.180061,  Lng: -81.334981),  Route carried "on" structure: State highway 61,  Year Built: 1969,  Status: Open,  Structure Length: 3.95m (12.96ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,280 (year 2040),  Design Load: HS 20,  Features Intersected: MORRIS CK & PRIVATE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.95m (12.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20A584,  Location: 0.07 Miles W. of US 60 (Lat: 38.184461,  Lng: -81.316700),  Route carried "on" structure: Ramp State highway 600,  Year Built: 1956,  Status: Posted for load,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 19,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 23,880 (year 2039),  Design Load: HS 20,  Features Intersected: NO FEATURE INTERSECTED,  Facility Carried by Structure: WV 6 N. APCH. RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.71m (25.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $673,000,  Roadway Improvement Cost: $626,000,  Total Project Cost: $1,299,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A585,  Location: 0.07 Miles S. of US 60 (Lat: 38.183781,  Lng: -81.315011),  Route carried "on" structure: Ramp State highway 600,  Year Built: 1956,  Status: Posted for load,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 20,887 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,482 (year 2039),  Design Load: H 20,  Features Intersected: NO FEATURE INTERSECTED,  Facility Carried by Structure: WV 6 N. EXIT RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 9.24m (30.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $657,000,  Total Project Cost: $1,656,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A795,  Location: 0.03 MI S OF 61/10 (Lat: 38.169450,  Lng: -81.329989),  Route carried "on" structure: Other road 90222,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 30 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 36 (year 2040),  Features Intersected: MORRIS CREEK,  Facility Carried by Structure: COUNTY RT 902/22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.4m (11.2ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40A152,  Location: 0.03 MI E. OF WV 34 (Lat: 38.172000,  Lng: -81.331400),  Route carried "on" structure: County highway 3412,  Year Built: 2008,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,600 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,510 (year 2039),  Design Load: HL 93,  Features Intersected: LONG BR OF POPLAR FORK,  Facility Carried by Structure: CR 34/12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 10A02,  Location: 0.12 Miles S. of WV 61 (Lat: 38.184286,  Lng: -81.315875),  Route carried "under" structure: US 6000,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 9,100 (year 0010),  Truck Traffic: 13%,  Features Intersected: Kanawha River US60 WV61,  Facility Carried by Structure: WV 6
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 71.326,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 148.2m (486.2ft)

Find on map >>   Show street view

Structure Number: 10A02,  Location: 0.12 Miles S. of WV 61 (Lat: 38.180453,  Lng: -81.318081),  Route carried "under" structure: State highway 6100,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 0012),  Truck Traffic: 8%,  Features Intersected: Kanawha River US60 WV61,  Facility Carried by Structure: WV 6
Minimum Vertical Clearance: 6.60m (21.65ft),  Kilometerpoint: 49.777,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 148.2m (486.2ft)

Find on map >>   Show street view

Structure Number: 20A163,  Location: 1.35 MI E OF CR 60/30 (Lat: 38.185081,  Lng: -81.341750),  Route carried "under" structure: US 6000,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2018),  Truck Traffic: 6%,  Features Intersected: US ROUTE 60,  Facility Carried by Structure: MAMMOTH COAL CO.
Minimum Vertical Clearance: 7.93m (26.02ft),  Kilometerpoint: 68.703,  Lanes under structure: 2,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 20A177,  Location: 0.10 MI S OF CR 61/11 (Lat: 38.180061,  Lng: -81.334981),  Route carried "under" structure: Other road ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,060 (year 0007),  Truck Traffic: 6%,  Features Intersected: MORRIS CK & PRIVATE RD,  Facility Carried by Structure: WV 61
Minimum Vertical Clearance: 4.04m (13.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 18.9m (62.0ft)