Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Morley, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 118ft / 36.5mTotal length
  • 5,280Total average daily traffic
  • 290Total average daily truck traffic
  • 5,280Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Morley
  • No street view available for this location

New bridges in Morley, IA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 51960-1969
  • 11970-1979
  • 51980-1989
  • 21990-1999
Reconstructed bridges in Morley, IA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 46.7%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 53.3%Satisfactory
  • 13.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.8%Good
  • 75.0%Satisfactory
  • 6.3%Fair
Find on map >>   Show street view

Structure Number: 5202,  Location: 069202610 (Lat: 40.741314,  Lng: -93.125956),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 860 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 860 (year 2040),  Design Load: H 20,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: S60 235TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 5724,  Location: 076331401 (Lat: 41.388786,  Lng: -94.613889),  Route carried "on" structure: County highway ,  Year Built: 1955,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 40 (year 2012),  Average Future Daily Traffic: 40 (year 2041),  Features Intersected: NINE MILE CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 206511,  Location: 083031804 (Lat: 41.992850,  Lng: -91.248583),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 930 (year 2021),  Average Future Daily Traffic: 930 (year 2042),  Design Load: HL 93,  Features Intersected: TRIBUTARY TO WALNUT CREE,  Facility Carried by Structure: COUNTY RD X-40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.066,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $20,000
Find on map >>   Show street view

Structure Number: 20652,  Location: 083031804 (Lat: 41.999828,  Lng: -91.248514),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 930 (year 2021),  Average Future Daily Traffic: 930 (year 2042),  Design Load: HS 20,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: COUNTY RD X-40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.840,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $20,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20653,  Location: 083031902 (Lat: 41.984192,  Lng: -91.248694),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 930 (year 2021),  Average Future Daily Traffic: 930 (year 2042),  Design Load: H 15,  Features Intersected: WHITE OAK CREEK,  Facility Carried by Structure: COUNTY RD X-40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.105,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $40,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 206541,  Location: 083031903 (Lat: 41.983608,  Lng: -91.241569),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 4.62m (15.16ft),  Average Daily Traffic: 90 (year 2021),  Average Future Daily Traffic: 90 (year 2041),  Design Load: H 15,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: 35TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.659,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.8m (58.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.00m (49.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 206671,  Location: 083040304 (Lat: 42.021406,  Lng: -91.297281),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 60 (year 2041),  Design Load: HS 20,  Features Intersected: NORTHFORK WALNUT CREEK,  Facility Carried by Structure: 215TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.263,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20674,  Location: 083041003 (Lat: 42.020278,  Lng: -91.294608),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 580 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 580 (year 2040),  Design Load: H 20,  Features Intersected: NORTH FORK WALNUT CREEK,  Facility Carried by Structure: COUNTY RD. E-45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.889,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $40,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20675,  Location: 083041003 (Lat: 42.020283,  Lng: -91.289433),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 580 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 580 (year 2041),  Design Load: H 20,  Features Intersected: SMALL CREEK,  Facility Carried by Structure: COUNTY RD E-45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.317,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $40,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 206771,  Location: 083041204 (Lat: 42.005997,  Lng: -91.268325),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Posted for load-capacity,  Structure Length: 3.10m (10.17ft),  Average Daily Traffic: 45 (year 2013),  Average Future Daily Traffic: 45 (year 2041),  Design Load: H 15,  Features Intersected: N FK WALNUT CREEK,  Facility Carried by Structure: 200TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.526,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20678,  Location: 083041302 (Lat: 42.003697,  Lng: -91.268367),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 45 (year 2013),  Average Future Daily Traffic: 45 (year 2041),  Design Load: HS 20,  Features Intersected: S FORK WALNUT CREEK,  Facility Carried by Structure: 200TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.270,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 206791,  Location: 083041402 (Lat: 42.003011,  Lng: -91.288197),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 45 (year 2021),  Average Future Daily Traffic: 45 (year 2041),  Design Load: HS 20,  Features Intersected: S FORK WALNUT CREEK,  Facility Carried by Structure: CHERRY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20685,  Location: 083042402 (Lat: 41.987731,  Lng: -91.268631),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 2013),  Average Future Daily Traffic: 50 (year 2041),  Design Load: HS 20,  Features Intersected: SMALL CREEK,  Facility Carried by Structure: 200TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.498,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 206861,  Location: 083042403 (Lat: 41.983628,  Lng: -91.254267),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 35 (year 2021),  Average Future Daily Traffic: 35 (year 2041),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK,  Facility Carried by Structure: 35TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.606,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 206871,  Location: 083042502 (Lat: 41.971083,  Lng: -91.268625),  Route carried "on" structure: County highway ,  Year Built: 1947,  Year Reconstructed: 1988,  Status: Posted for load-capacity,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 50 (year 2042),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK,  Facility Carried by Structure: 200TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.649,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 15.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 206961,  Location: 083043501 (Lat: 41.962294,  Lng: -91.287200),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 10 (year 2013),  Average Future Daily Traffic: 10 (year 2041),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK,  Facility Carried by Structure: 20TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $1,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Morley, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.