Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Moundville, Wisconsin (WI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 148ft / 45.2mTotal length
  • 154,519Total average daily traffic
  • 23,927Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Moundville
  • No street view available for this location

New bridges in Moundville, WI - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 21960-1969
  • 151980-1989
Reconstructed bridges in Moundville, WI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Moundville, WI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 58.3%Good
  • 8.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 83.3%Good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Very good
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: B390004,  Location: 4.0M N JCT CTH J (Lat: 43.915789,  Lng: -89.312161),  Route carried "on" structure: State highway 22,  Year Built: 1951,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 1,700 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,370 (year 2040),  Design Load: H 15,  Features Intersected: MECAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.8m (71.5ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390006,  Location: 1.8M S JCT CTH O (Lat: 43.644667,  Lng: -89.470117),  Route carried "on" structure: Interstate 39,  Year Built: 1959,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 14,300 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,935 (year 2039),  Design Load: HS 20,  Features Intersected: NEENAH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B39001,  Location: 2.3M S JCT CTH M (Lat: 43.816850,  Lng: -89.482750),  Route carried "on" structure: Interstate 39,  Year Built: 1966,  Status: Open,  Structure Length: 3.10m (10.17ft),  Average Daily Traffic: 10,800 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 13,800 (year 2039),  Design Load: HS 20,  Features Intersected: LRD FAWN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.6m (41.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: B390012,  Location: 0.4M S JCT USH 51 (Lat: 43.644558,  Lng: -89.468239),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 1,340 (year 2018),  Average Future Daily Traffic: 1,422 (year 2039),  Design Load: H 20,  Features Intersected: NEENAH CREEK,  Facility Carried by Structure: CTH CX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B390015,  Location: 4.8M N JCT STH 78 TO S (Lat: 43.644542,  Lng: -89.469508),  Route carried "on" structure: Interstate 39,  Year Built: 1984,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 16,100 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 19,900 (year 2039),  Design Load: HS 20,  Features Intersected: NEENAH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390016,  Location: AT JCT USH 51 (Lat: 43.649742,  Lng: -89.470644),  Route carried "on" structure: City street ,  Year Built: 1984,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 120 (year 2019),  Average Future Daily Traffic: 120 (year 2037),  Design Load: HS 20,  Features Intersected: IH USH 51-IH 39,  Facility Carried by Structure: LRD GROUSE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.9m (124.3ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390017,  Location: 6.7M N JCT STH 78 TO S (Lat: 43.671344,  Lng: -89.469719),  Route carried "on" structure: Interstate 39,  Year Built: 1983,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 16,100 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 19,100 (year 2039),  Design Load: HS 20,  Features Intersected: CTH O
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.6m (54.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390018,  Location: 2.0M S JCT STH 23 (Lat: 43.671675,  Lng: -89.470225),  Route carried "on" structure: Interstate 39,  Year Built: 1983,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 14,300 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,100 (year 2039),  Design Load: HS 20,  Features Intersected: CTH O
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.6m (54.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390019,  Location: 2.0M N JCT CTH O (Lat: 43.700942,  Lng: -89.471047),  Route carried "on" structure: Interstate 39,  Year Built: 1984,  Status: Open,  Structure Length: 5.45m (17.88ft),  Average Daily Traffic: 14,300 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,100 (year 2039),  Design Load: HS 20,  Features Intersected: STH 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B39002,  Location: 4.2M S JCT CTH D (Lat: 43.701425,  Lng: -89.471650),  Route carried "on" structure: Interstate 39,  Year Built: 1984,  Status: Open,  Structure Length: 5.45m (17.88ft),  Average Daily Traffic: 10,039 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 11,042 (year 2039),  Design Load: HS 20,  Features Intersected: STH 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390021,  Location: 1.3M N JCT STH 23 TO W (Lat: 43.718489,  Lng: -89.476936),  Route carried "on" structure: Interstate 39,  Year Built: 1984,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 590 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,100 (year 2039),  Design Load: HS 20,  Features Intersected: CTH CX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390022,  Location: 2.9M S JCT CTH D (Lat: 43.718814,  Lng: -89.477675),  Route carried "on" structure: Interstate 39,  Year Built: 1984,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 16,200 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,100 (year 2039),  Design Load: HS 20,  Features Intersected: CTH CX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390016,  Location: 5.2M N JCT STH 78 TO S (Lat: 43.649742,  Lng: -89.470644),  Route carried "under" structure: Interstate 39,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 16,100 (year 2019),  Truck Traffic: 18%,  Features Intersected: IH USH 51-IH 39,  Facility Carried by Structure: LRD GROUSE DRIVE
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.9m (124.3ft)

Find on map >>   Show street view

Structure Number: B390017,  Location: 4.7M E JCT STH 23 TO W (Lat: 43.671344,  Lng: -89.469719),  Route carried "under" structure: County highway ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 920 (year 2019),  Features Intersected: CTH O,  Facility Carried by Structure: IH USH51-IH39 NB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 16.6m (54.5ft)

Find on map >>   Show street view

Structure Number: B390018,  Location: AT JCT USH 51 SB (Lat: 43.671675,  Lng: -89.470225),  Route carried "under" structure: County highway ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 920 (year 2019),  Features Intersected: CTH O,  Facility Carried by Structure: IH USH51-IH39 SB
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 16.6m (54.5ft)

Find on map >>   Show street view

Structure Number: B390019,  Location: 3.9M E JCT CTH O TO N (Lat: 43.700942,  Lng: -89.471047),  Route carried "under" structure: State highway 23,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 9%,  Features Intersected: STH 23,  Facility Carried by Structure: IH USH51-IH39 NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: B39002,  Location: 4.0M E JCT CTH O TO N (Lat: 43.701425,  Lng: -89.471650),  Route carried "under" structure: State highway 23,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 2,100 (year 2018),  Truck Traffic: 9%,  Features Intersected: STH 23,  Facility Carried by Structure: IH USH51-IH39 SB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: B390021,  Location: 3.5M N JCT CTH O (Lat: 43.718489,  Lng: -89.476936),  Route carried "under" structure: County highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2019),  Features Intersected: CTH CX,  Facility Carried by Structure: IH USH51-IH39 NB
Minimum Vertical Clearance: 4.68m (15.35ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: B390022,  Location: 3.5M N JCT CTH O (Lat: 43.718814,  Lng: -89.477675),  Route carried "under" structure: County highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 590 (year 2019),  Features Intersected: CTH CX,  Facility Carried by Structure: IH USH51-IH39 SB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.7m (58.1ft)

Discuss Moundville, Wisconsin (WI) on our hugely popular Wisconsin forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.