Bridge Statistics for New Haven, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 56ft / 17.1mTotal length
  • $1,100,000Total costs
  • 7,550Total average daily traffic
  • 441Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Haven
  • No street view available for this location

New bridges in New Haven, WV - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11970-1979
  • 61980-1989
  • 31990-1999
  • 22000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 70.0%Good
  • 20.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 20.0%Good
  • 10.0%Satisfactory
  • 50.0%Fair
  • 10.0%Poor
Find on map >>   Show street view

Structure Number: 27A012,  Location: 0.22 MI E OF CR 9/4 (Lat: 38.962350,  Lng: -81.960919),  Route carried "on" structure: County highway 6,  Year Built: 1980,  Status: Open,  Structure Length: 1.42m (4.66ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 260 (year 2039),  Design Load: HS 20,  Features Intersected: BROAD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.375,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27A013,  Location: 0.98 MI W OF WV 62 (Lat: 38.974831,  Lng: -81.954789),  Route carried "on" structure: County highway 6,  Year Built: 1918,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 260 (year 2038),  Features Intersected: BROAD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.904,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27A014,  Location: 0.75 MI W OF WV 62 (Lat: 38.976750,  Lng: -81.953981),  Route carried "on" structure: County highway 6,  Year Built: 1980,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 260 (year 2038),  Design Load: HS 20,  Features Intersected: BROAD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.274,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.3m (43.6ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $100,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27A019,  Location: 0.10 MI N OF CR 9/3 (Lat: 38.958689,  Lng: -81.962769),  Route carried "on" structure: County highway 94,  Year Built: 1988,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 390 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BROAD RUN,  Facility Carried by Structure: CR 009/04
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27A106,  Location: 0.23 MI S OF CO 9/4 (Lat: 38.955569,  Lng: -81.964961),  Route carried "on" structure: County highway 93,  Year Built: 1990,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 90 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 117 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BROAD RUN,  Facility Carried by Structure: CR 009/03
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.524,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27A109,  Location: 0.42 MI. N. OF WV 62 (Lat: 38.990261,  Lng: -81.962981),  Route carried "on" structure: County highway 1900,  Year Built: 1981,  Status: Open,  Structure Length: 5.81m (19.06ft),  Average Daily Traffic: 1,100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,430 (year 2038),  Design Load: HS 20,  Features Intersected: BROAD RUN,  Facility Carried by Structure: CR 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.81m (19.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27A122,  Location: 0.21 MI W OF WV 62 (Lat: 38.981600,  Lng: -81.959589),  Route carried "on" structure: County highway 600,  Year Built: 1987,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 260 (year 2038),  Design Load: HS 20,  Features Intersected: SEAMAN RUN,  Facility Carried by Structure: COUNTY ROUTE 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.725,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27A13,  Location: 0.87 MI E OF CR 9/4 (Lat: 38.971531,  Lng: -81.956089),  Route carried "on" structure: County highway 6,  Year Built: 1986,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 276 (year 2040),  Features Intersected: BROAD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.582,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.84m (2.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $100,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27A148,  Location: 1.10 MILE NORTH OF CR 3 (Lat: 38.941981,  Lng: -81.972739),  Route carried "on" structure: County highway 93,  Year Built: 1999,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 103 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 134 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BROAD RUN,  Facility Carried by Structure: COUNTY ROUTE 9/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27A149,  Location: 0.80 MILE NORTH OF CR 3 (Lat: 38.938300,  Lng: -81.972719),  Route carried "on" structure: County highway 93,  Year Built: 1999,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 103 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 134 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BROAD RUN,  Facility Carried by Structure: COUNTY ROUTE 9/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27A121,  Location: 1.01 MI E OF CR 33/13 (Lat: 38.974250,  Lng: -81.937381),  Route carried "under" structure: State highway 6200,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 1,154 (year 2017),  Truck Traffic: 8%,  Features Intersected: WV 62,  Facility Carried by Structure: AEP PIPELINES
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 65.758,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 53.0m (173.9ft)

Find on map >>   Show street view

Structure Number: 27A163,  Location: 0.34 MI N. OF WV 62 F (Lat: 38.989869,  Lng: -81.964411),  Route carried "under" structure: County highway 1900,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 2020),  Truck Traffic: 5%,  Features Intersected: COUNTY ROUTE 19,  Facility Carried by Structure: CSX RR OWNER #1527
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.547,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 27A167,  Location: 1.00 MI N. OF CR 33/13 (Lat: 38.974331,  Lng: -81.937450),  Route carried "under" structure: State highway 62,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 6%,  Features Intersected: WV 62,  Facility Carried by Structure: AEP COAL CONVEYOR
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 65.742,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 53.0m (173.9ft)

Find on map >>   Show street view

Structure Number: 27A168,  Location: 0.20 MI N. OF CR 33/13 (Lat: 38.981861,  Lng: -81.949089),  Route carried "under" structure: State highway 62,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 6%,  Features Intersected: WV 62,  Facility Carried by Structure: NRP COAL CONVEYOR
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 64.454,  Lanes under structure: 2,  Material/Design: Steel,  Length of Maximum Span: 24.4m (80.1ft)

Discuss New Haven, West Virginia (WV) on our hugely popular West Virginia forum.