Bridge Statistics for North Hornell, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 125ft / 38.3mTotal length
  • $19,025,000Total costs
  • 72,781Total average daily traffic
  • 2,043Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Hornell
  • No street view available for this location

New bridges in North Hornell, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11960-1969
  • 51970-1979
  • 11980-1989
  • 21990-1999
Reconstructed bridges in North Hornell, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
Average Bridge Daily Traffic in North Hornell, NY
Average Bridge Truck Traffic in North Hornell, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 55.6%Very good
  • 11.1%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 33.3%Fair
  • 22.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Good
  • 75.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101639,  Location: 2 MI NE JCT SR 17 & SR 21 (Lat: 42.399044,  Lng: -77.621011),  Route carried "on" structure: State highway 21,  Year Built: 1983,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,995 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,007 (year 2040),  Design Load: HS 20,  Features Intersected: RESERVOIR SPLLWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.747,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $779,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 102948,  Location: 2.0 MI E JCT RTS 17 + 21 (Lat: 42.371633,  Lng: -77.627656),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 190 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 266 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: 86I 17 64044070, RTE I86,  Facility Carried by Structure: County Road 57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,978,000,  Roadway Improvement Cost: $1,159,000,  Total Project Cost: $3,137,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106016,  Location: JCT RTS 17 + 36 (Lat: 42.378892,  Lng: -77.654183),  Route carried "on" structure: State highway 21,  Year Built: 1970,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 2,283 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,297 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 86I 17 64044055, RTE I86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.030,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,864,000,  Roadway Improvement Cost: $1,677,000,  Total Project Cost: $4,542,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106023,  Location: 0.7 MI E JCT I86 + SR 21 (Lat: 42.377333,  Lng: -77.649075),  Route carried "on" structure: Interstate 86,  Year Built: 1970,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 5,988 (year 2018),  Truck Traffic: 24%,  Average Future Daily Traffic: 11,171 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CARRINGTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.380,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $426,000,  Total Project Cost: $1,155,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221694,  Location: 4.7 MI W OF HOWARD (Lat: 42.365600,  Lng: -77.598414),  Route carried "on" structure: Other road ,  Year Built: 1967,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 8 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11 (year 2038),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: BARDEEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $706,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221698,  Location: 1.7M NE OF NORTH HORNELL (Lat: 42.369578,  Lng: -77.640375),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 25 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 35 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BIG CREEK,  Facility Carried by Structure: BIG CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $937,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333302,  Location: 2.4 MILES NE OF HORNELL (Lat: 42.366225,  Lng: -77.645806),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1993,  Status: Posted for load-capacity,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 2,058 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,146 (year 2040),  Design Load: HS 20,  Features Intersected: BIG CREEK RD, BIG CREEK,  Facility Carried by Structure: COUNTY ROAD 70A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $937,000,  Total Project Cost: $2,538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333375,  Location: 0.2 MI S OF FREMONT (Lat: 42.390847,  Lng: -77.627464),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 190 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 266 (year 2038),  Design Load: HS 20,  Features Intersected: CARRINGTON CREEK,  Facility Carried by Structure: COUNTY ROAD 57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $710,000,  Roadway Improvement Cost: $416,000,  Total Project Cost: $1,126,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333471,  Location: 2.9 MI EAST OF N HORNELL (Lat: 42.365381,  Lng: -77.607997),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,134 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,182 (year 2040),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: COUNTY ROAD 70A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.098,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $893,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333472,  Location: 2.5 MILES NE OF HORNELL (Lat: 42.368092,  Lng: -77.644189),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1993,  Status: Posted for load-capacity,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 2,058 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,146 (year 2040),  Design Load: HS 20,  Features Intersected: BIG CREEK ROAD, BIG CREE,  Facility Carried by Structure: COUNTY ROAD 70A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.800,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $2,026,000,  Roadway Improvement Cost: $1,186,000,  Total Project Cost: $3,212,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102948,  Location: 2.0 MI E JCT RTS 17 + 21 (Lat: 42.371633,  Lng: -77.627656),  Route carried "under" structure: Interstate 86,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,984 (year 1969),  Features Intersected: 86I 17 64044070, RTE I86,  Facility Carried by Structure: County Road 57
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 11.263,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 106016,  Location: JCT RTS 17 + 36 (Lat: 42.378892,  Lng: -77.654183),  Route carried "under" structure: Interstate 86,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 44,788 (year 1999),  Features Intersected: 86I 17 64044055, RTE I86,  Facility Carried by Structure: RTE 21
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 8.914,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 333302,  Location: 2.4 MILES NE OF HORNELL (Lat: 42.366225,  Lng: -77.645806),  Route carried "under" structure: County highway ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2021),  Features Intersected: BIG CREEK RD, BIG CREEK,  Facility Carried by Structure: COUNTY ROAD 70A
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.2m (59.7ft)