Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oceana, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 108ft / 33.1mTotal length
  • $3,975,000Total costs
  • 14,510Total average daily traffic
  • 1,251Total average daily truck traffic
  • 16,038Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oceana
  • No street view available for this location

New bridges in Oceana, WV - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21960-1969
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 42000-2009
  • 12020-2022
Average Bridge Daily Traffic in Oceana, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.7%Satisfactory
  • 53.3%Fair
  • 20.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Very good
  • 6.7%Good
  • 73.3%Fair
  • 13.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Good
  • 13.3%Satisfactory
  • 53.3%Fair
  • 20.0%Poor
  • 6.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.3%Very good
  • 26.7%Good
  • 13.3%Satisfactory
  • 33.3%Fair
  • 6.7%Poor
  • 6.7%Serious
Find on map >>   Show street view

Structure Number: 55A007,  Location: 0.03 MI N OF WV 85 (Lat: 37.712900,  Lng: -81.597081),  Route carried "on" structure: County highway 200,  Year Built: 1968,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 611 (year 2038),  Design Load: HS 20,  Features Intersected: TONEY FORK,  Facility Carried by Structure: CR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.5m (34.4ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Serious,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A036,  Location: 0.03 MI S OF WV 85 (Lat: 37.691831,  Lng: -81.623500),  Route carried "on" structure: State highway 1000,  Year Built: 1938,  Status: Posted for load,  Structure Length: 2.09m (6.86ft),  Average Daily Traffic: 4,400 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,840 (year 2039),  Design Load: H 15,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: WV RT 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.773,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,000,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A038,  Location: 0.02 MI S OF CR 10/3 (Lat: 37.741411,  Lng: -81.684411),  Route carried "on" structure: State highway 1000,  Year Built: 1964,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 2,200 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,442 (year 2038),  Design Load: HS 20,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: WV ROUTE 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.282,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 55A041,  Location: 0.70 MI E OF CR 10/4 (Lat: 37.749789,  Lng: -81.662569),  Route carried "on" structure: County highway 1003,  Year Built: 1981,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 999 (year 2039),  Features Intersected: HUFF CREEK,  Facility Carried by Structure: CR 10/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.1m (46.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A042,  Location: O.60 MI W OF CR 10/5 (Lat: 37.750511,  Lng: -81.650989),  Route carried "on" structure: County highway 1003,  Year Built: 1991,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 900 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 999 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: CR 10/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.216,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A105,  Location: 0.03 MI S OF WV 85 (Lat: 37.708531,  Lng: -81.602481),  Route carried "on" structure: County highway 8504,  Year Built: 1992,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 30 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 33 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: CR 85/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A107,  Location: 0.01 MI E OF WV 971 (Lat: 37.686781,  Lng: -81.658719),  Route carried "on" structure: County highway 97102,  Year Built: 1979,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 53 (year 2039),  Features Intersected: OLDHOUSE BRANCH,  Facility Carried by Structure: CR971/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000 ( Estimate for 2017),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55A108,  Location: 0.02 MI S OF CR 7/7 (Lat: 37.681719,  Lng: -81.661681),  Route carried "on" structure: State highway 97100,  Year Built: 1993,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 3,100 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,441 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: WV 971
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.599,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A185,  Location: 0.01 MI E OF WV 85 (Lat: 37.699531,  Lng: -81.616711),  Route carried "on" structure: County highway 8503,  Year Built: 1991,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 30 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 33 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: CR 85/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A186,  Location: 0.07 MI S OF WV 10 (Lat: 37.698311,  Lng: -81.638181),  Route carried "on" structure: County highway 1098,  Year Built: 2001,  Status: Open,  Structure Length: 2.55m (8.37ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 56 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CLEAR FORK,  Facility Carried by Structure: COUNTY 10/98
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A191,  Location: 0.03 MI WEST OF WV 10 (Lat: 37.683639,  Lng: -81.625261),  Route carried "on" structure: Other road N1185,  Year Built: 1982,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 56 (year 2038),  Features Intersected: LAUREL FORK,  Facility Carried by Structure: CO 10/58
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55A21,  Location: 0.01 MILE S OF WV 10 (Lat: 37.732569,  Lng: -81.689061),  Route carried "on" structure: County highway 1096,  Year Built: 2006,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 22 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: HUFF CREEK,  Facility Carried by Structure: COUNTY ROUTE 10/96
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55A216,  Location: 0.01 MI NORTH OF CO 10/3 (Lat: 37.750661,  Lng: -81.659169),  Route carried "on" structure: County highway 1070,  Year Built: 2005,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 11 (year 2039),  Features Intersected: HUFF CREEK,  Facility Carried by Structure: COUNTY ROUTE 10/70
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 19.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A224,  Location: 0.01 M. South of CR 10/3 (Lat: 37.751531,  Lng: -81.669561),  Route carried "on" structure: Other road 90144,  Year Built: 2002,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 20 (year 2018),  Average Future Daily Traffic: 22 (year 2038),  Features Intersected: Huff Creek,  Facility Carried by Structure: Harp 901/44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $225,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 55A251,  Location: 0.43 MI S OF CR 10/3 (Lat: 37.743431,  Lng: -81.677839),  Route carried "on" structure: State highway 10,  Year Built: 2020,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,420 (year 2039),  Design Load: HL 93,  Features Intersected: Road Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.622,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Discuss Oceana, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.