  • 14Number of bridges
  • 79ft / 23.6mTotal length
  • $3,667,000Total costs
  • 12,073Total average daily traffic
  • 791Total average daily truck traffic
  • 16,189Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Omar
  • No street view available for this location

New bridges in Omar, WV - historical statistics
  • New bridges - historical statistics
  • 51980-1989
  • 81990-1999
  • 12000-2009
Average Bridge Daily Traffic in Omar, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.4%Good
  • 35.7%Satisfactory
  • 21.4%Fair
  • 21.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.7%Good
  • 21.4%Satisfactory
  • 21.4%Fair
  • 21.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Good
  • 21.4%Satisfactory
  • 14.3%Fair
  • 57.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 28.6%Satisfactory
  • 21.4%Fair
  • 21.4%Poor
Find on map >>   Show street view

Structure Number: 23A008,  Location: 0.02 MI NORTH OF CR 119/5 (Lat: 37.757019,  Lng: -82.000711),  Route carried "on" structure: County highway 70057,  Year Built: 1985,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 13 (year 2038),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: CR 700/57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.1m (10.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $557,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A107,  Location: 0.01 MI SOUTH OF CR 13 (Lat: 37.747269,  Lng: -82.002689),  Route carried "on" structure: State highway 4400,  Year Built: 1996,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,260 (year 2040),  Design Load: HS 20,  Features Intersected: COW CREEK,  Facility Carried by Structure: WV 44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.020,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $33,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A108,  Location: 0.15 MI SOUTH OF CR 119/5 (Lat: 37.753131,  Lng: -81.999739),  Route carried "on" structure: State highway 4400,  Year Built: 1980,  Status: Open,  Structure Length: 3.80m (12.47ft),  Average Daily Traffic: 2,700 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,835 (year 2039),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: WV 44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.873,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $812,000,  Roadway Improvement Cost: $791,000,  Total Project Cost: $2,016,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A109,  Location: 0.01 MI. N. OF CR 119/3 (Lat: 37.759069,  Lng: -81.996900),  Route carried "on" structure: State highway 4400,  Year Built: 1981,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 3,112 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,415 (year 2039),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: WV 44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.677,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $255,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A128,  Location: 0.03 MI EAST OF CR 700/57 (Lat: 37.756761,  Lng: -82.000100),  Route carried "on" structure: County highway 11905,  Year Built: 1985,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 650 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 858 (year 2036),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.1m (10.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $316,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A129,  Location: 1.00 MI WEST OF WV 44 (Lat: 37.758281,  Lng: -82.012961),  Route carried "on" structure: County highway 11905,  Year Built: 1986,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 840 (year 2039),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $140,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $200,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A134,  Location: 0.44 MI WEST OF WV 44 (Lat: 37.744089,  Lng: -82.009000),  Route carried "on" structure: County highway 1300,  Year Built: 1993,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,200 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,584 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: COW CREEK,  Facility Carried by Structure: CR 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $65,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A142,  Location: 0.01 MI EAST OF WV 44 (Lat: 37.749550,  Lng: -82.000269),  Route carried "on" structure: County highway 11921,  Year Built: 1990,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 70 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 74 (year 2040),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: CR 119/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A244,  Location: 1.80 MILE WEST OF WV 44 (Lat: 37.759789,  Lng: -82.025250),  Route carried "on" structure: County highway 11905,  Year Built: 1997,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 462 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PINE CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.897,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A249,  Location: 1.45 MILE WEST OF WV 44 (Lat: 37.757731,  Lng: -82.019869),  Route carried "on" structure: County highway 11905,  Year Built: 1997,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 561 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 976 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PINE CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.334,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A25,  Location: 3.56 MILES WEST OF WV 44 (Lat: 37.755581,  Lng: -82.051231),  Route carried "on" structure: County highway 11905,  Year Built: 1997,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 13 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: PINE CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.729,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A259,  Location: 4.05 MI. WEST OF WV 44 (Lat: 37.755911,  Lng: -82.060269),  Route carried "on" structure: County highway 11905,  Year Built: 1998,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 10 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RIGHT FORK OF PINE CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.518,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A264,  Location: 3.24 MILES WEST OF WV 44 (Lat: 37.758511,  Lng: -82.047850),  Route carried "on" structure: County highway 11905,  Year Built: 1998,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 264 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: PINE CREEK,  Facility Carried by Structure: CR 119/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.214,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A285,  Location: 0.58 MILE WEST OF WV 44 (Lat: 37.743919,  Lng: -82.011631),  Route carried "on" structure: County highway 1300,  Year Built: 2000,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,584 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: COW CREEK,  Facility Carried by Structure: CR 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $225,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Discuss Omar, West Virginia (WV) on our hugely popular West Virginia forum.