  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 108ft / 32.8mTotal length
  • $6,331,000Total costs
  • 10,800Total average daily traffic
  • 1,065Total average daily truck traffic
  • 16,200Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Omega
  • No street view available for this location

New bridges in Omega, GA - historical statistics
  • New bridges - historical statistics
  • 21960-1969
  • 51970-1979
  • 21980-1989
  • 31990-1999
Reconstructed bridges in Omega, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Omega, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 83.3%Good
  • 16.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 83.3%Good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Very good
  • 45.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 710012,  Location: APP 2 MI N OF CROSLAND (Lat: 31.322594,  Lng: -83.622636),  Route carried "on" structure: US 319,  Year Built: 1972,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 6,400 (year 2011),  Truck Traffic: 14%,  Average Future Daily Traffic: 9,600 (year 2031),  Design Load: HS 20,  Features Intersected: TY TY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.843,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: March 2018,  Bridge Improvement Cost: $1,932,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,898,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 715067,  Location: APP 2.3 MI NE OF CROSLAND (Lat: 31.314119,  Lng: -83.605458),  Route carried "on" structure: County highway 152,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 50 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2032),  Features Intersected: SAPP CREEK,  Facility Carried by Structure: JIM CLARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 41.76m (137.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $51,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $184,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 715071,  Location: APP 4.1 MI NE OF CROSLAND (Lat: 31.329128,  Lng: -83.576328),  Route carried "on" structure: County highway 157,  Year Built: 1980,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM CREEK,  Facility Carried by Structure: TIFT CO LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 715105,  Location: APP 2.3 MI E OF CROSLAND (Lat: 31.305319,  Lng: -83.601528),  Route carried "on" structure: County highway 201,  Year Built: 1980,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 60 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 90 (year 2032),  Features Intersected: SAPP CREEK,  Facility Carried by Structure: LARRY DUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 10.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.91m (137.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $57,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $190,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 715169,  Location: APP 2.8 MI SE OF CROSLAND (Lat: 31.283897,  Lng: -83.602900),  Route carried "on" structure: County highway 476,  Year Built: 1992,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TY TY CREEK OVERFLOW,  Facility Carried by Structure: ELTON CLARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 715171,  Location: 2.9 MI SE OF CROSLAND (Lat: 31.284828,  Lng: -83.599878),  Route carried "on" structure: County highway 476,  Year Built: 1992,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 250 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 375 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TY TY CREEK OVERFLOW,  Facility Carried by Structure: ELTON CLARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 715172,  Location: APP 2.9 MI SE OF CROSLAND (Lat: 31.285217,  Lng: -83.598603),  Route carried "on" structure: County highway 476,  Year Built: 1992,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TY TY CREEK,  Facility Carried by Structure: ELTON CLARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: March 2018
Find on map >>   Show street view

Structure Number: 2770063,  Location: APP 1 MI E OF OMEGA (Lat: 31.341858,  Lng: -83.580769),  Route carried "on" structure: County highway 2591,  Year Built: 1967,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 430 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 645 (year 2031),  Design Load: H 15,  Features Intersected: GUM CREEK,  Facility Carried by Structure: OMEGA-ELDORADO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 2770064,  Location: APP 4 MI E OF OMEGA (Lat: 31.351319,  Lng: -83.537939),  Route carried "on" structure: County highway 2591,  Year Built: 1961,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 560 (year 2012),  Truck Traffic: 12%,  Average Future Daily Traffic: 840 (year 2032),  Design Load: H 15,  Features Intersected: ARNOLD CREEK,  Facility Carried by Structure: OMEGA-ELDORADO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2775012,  Location: APP 2.5 MI W OF OMEGA (Lat: 31.342308,  Lng: -83.630969),  Route carried "on" structure: County highway 57,  Year Built: 1974,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: TY TY CREEK OVERFLOW,  Facility Carried by Structure: FLAT FORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.09m (33.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $715,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2775013,  Location: APP 2.6 MI W OF OMEGA (Lat: 31.342519,  Lng: -83.632678),  Route carried "on" structure: County highway 57,  Year Built: 1974,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: TY TY CREEK,  Facility Carried by Structure: FLAT FORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $633,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $949,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2775014,  Location: APP 4.3 MI NW OF OMEGA (Lat: 31.386689,  Lng: -83.633228),  Route carried "on" structure: County highway 61,  Year Built: 1976,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE CREEK,  Facility Carried by Structure: TY TY SPARKS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000