Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ouray, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 62ft / 19.2mTotal length
  • $426,000Total costs
  • 5,888Total average daily traffic
  • 264Total average daily truck traffic
  • 7,687Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ouray
  • No street view available for this location

New bridges in Ouray, CO - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 41980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 60.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 70.0%Good
  • 10.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 90.0%Good
  • 10.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 20406000001035,  Location: .1MI S OF OURAY (Lat: 38.017847,  Lng: -107.665475),  Route carried "on" structure: County highway 855.1,  Year Built: 1958,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 224 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 336 (year 2042),  Design Load: HS 20,  Features Intersected: PORTLAND CREEK,  Facility Carried by Structure: WINDING FDR 855
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.320,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: L-06-B,  Location: 1.5 Mi S of OURAY (Lat: 38.000039,  Lng: -107.660067),  Route carried "on" structure: US 550B,  Year Built: 2010,  Status: Open,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 2,100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,184 (year 2040),  Features Intersected: BEAR CREEK,  Facility Carried by Structure: US 550 ML
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.045,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.1m (128.3ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $148,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: OUR17-0.6-06,  Location: 3.5 MI N OF OURAY (Lat: 38.052500,  Lng: -107.686806),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,181 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,712 (year 2037),  Design Load: HS 20,  Features Intersected: UNCOMPAHGRE RIVER,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.011,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: OUR26-0.1-12A,  Location: 1.9 MI SW OF OURAY (Lat: 38.001722,  Lng: -107.694139),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 194 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 282 (year 2037),  Features Intersected: CANYON CREEK,  Facility Carried by Structure: COUNTY RD 26 (361)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.263,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.7m (48.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: OUR26-0.2-15,  Location: 0.5 MI. S. OF OURAY (Lat: 38.015722,  Lng: -107.673417),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 3.43m (11.25ft),  Average Daily Traffic: 389 (year 2017),  Average Future Daily Traffic: 564 (year 2037),  Design Load: HS 20,  Features Intersected: RED MOUNTAIN CREEK,  Facility Carried by Structure: COUNTY RD 26 (361)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.509,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: OUR361-2.7-2,  Location: 2.7 MI SW OF OURAY (Lat: 37.992278,  Lng: -107.701833),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 152 (year 2017),  Average Future Daily Traffic: 221 (year 2037),  Features Intersected: WEEHAWKEN CREEK,  Facility Carried by Structure: COUNTY ROAD 361
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.598,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: OURAY-7TH AVE-A,  Location: IN CITY OF OURAY (Lat: 38.023722,  Lng: -107.674389),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,325 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,921 (year 2037),  Design Load: HS 20,  Features Intersected: UNCOMPAHGRE RIVER,  Facility Carried by Structure: 7TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.043,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: OURAY-BOX CAN-A,  Location: EXIT ROAD FROM BOX CANYON (Lat: 38.019333,  Lng: -107.676194),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 74 (year 2018),  Average Future Daily Traffic: 107 (year 2038),  Features Intersected: RED MOUNTAIN CREEK,  Facility Carried by Structure: BOX CANYON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.1m (23.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 65.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: OURAY-OAK-A ST,  Location: IN CITY OF OURAY (Lat: 38.019639,  Lng: -107.675472),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 209 (year 2018),  Average Future Daily Traffic: 302 (year 2038),  Features Intersected: UNCOMPAHGRE RIVER,  Facility Carried by Structure: OAK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $278,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: OURAY-PWDR HS,  Location: RD TO BOX CANYON PARK (Lat: 38.016333,  Lng: -107.674111),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 40 (year 2018),  Average Future Daily Traffic: 58 (year 2038),  Features Intersected: RED MOUNTAIN CREEK,  Facility Carried by Structure: BOX CANYON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.031,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 60.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Ouray, Colorado (CO) on our hugely popular Colorado forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.