Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pennington, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 472ft / 144mTotal length
  • $44,499,000Total costs
  • 63,766Total average daily traffic
  • 3,403Total average daily truck traffic
  • 85,386Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pennington
  • No street view available for this location

New bridges in Pennington, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 51960-1969
  • 31980-1989
  • 12000-2009
  • 12020-2022
Average Bridge Daily Traffic in Pennington, AL
Average Bridge Truck Traffic in Pennington, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 57.1%Good
  • 28.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 57.1%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 57.1%Good
  • 28.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 10.0%Very good
  • 60.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 902,  Location: LOMB AVE * VALLEY CREEK (Lat: 33.550000,  Lng: -86.883333),  Route carried "on" structure: City street ,  Year Built: 1931,  Status: Open,  Structure Length: 2.27m (7.45ft),  Average Daily Traffic: 16,000 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,000 (year 2036),  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: LOMB AVE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 3.249,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.0m (26.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.09m (10.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,442,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,586,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8495,  Location: 4.4 MI. E OF JACHIN (Lat: 32.209083,  Lng: -88.100489),  Route carried "on" structure: State highway 156,  Year Built: 1965,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,460 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,781 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.057,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.29m (4.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $295,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9044,  Location: US 31 * 10 TH AVE SO (Lat: 33.503333,  Lng: -86.789444),  Route carried "on" structure: US 31,  Year Built: 1966,  Status: Open,  Structure Length: 11.34m (37.20ft),  Average Daily Traffic: 36,335 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 46,675 (year 2041),  Design Load: HS 20,  Features Intersected: 10 TH AVE SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 439.995,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,602,000,  Roadway Improvement Cost: $360,000,  Total Project Cost: $3,962,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9133,  Location: 1.0 MI.SO.GLASGOW (Lat: 31.753150,  Lng: -86.523617),  Route carried "on" structure: County highway 69,  Year Built: 1966,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 94 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 125 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $473,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9158,  Location: 1.5 M NE RAYS CROSSROADS (Lat: 33.259994,  Lng: -85.879842),  Route carried "on" structure: County highway 92,  Year Built: 1966,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 181 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 269 (year 2036),  Design Load: H 20,  Features Intersected: BRANCH,  Facility Carried by Structure: RAINBOW DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $421,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 916,  Location: 1.5M NW MILLERVILLE (Lat: 33.205031,  Lng: -85.935036),  Route carried "on" structure: County highway 95,  Year Built: 1966,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 196 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 273 (year 2036),  Design Load: H 20,  Features Intersected: RAY CREEK,  Facility Carried by Structure: PLEASANT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $245,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14679,  Location: 9.8 MI. E. OF BUTLER (Lat: 32.130933,  Lng: -88.059300),  Route carried "on" structure: State highway 10,  Year Built: 1989,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 2,220 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,891 (year 2033),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.654,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,150,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $2,365,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1468,  Location: 9.9 MI. E. OF BUTLER (Lat: 32.130658,  Lng: -88.056856),  Route carried "on" structure: State highway 10,  Year Built: 1989,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 2,220 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,891 (year 2033),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.848,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,150,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $2,365,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14941,  Location: 2.7 MI. N. OF LAVACA (Lat: 32.173269,  Lng: -88.062906),  Route carried "on" structure: State highway 114,  Year Built: 1989,  Status: Open,  Structure Length: 13.08m (42.91ft),  Average Daily Traffic: 2,410 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,350 (year 2033),  Design Load: HS 20,  Features Intersected: TUCKABUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.255,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.90m (45.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,098,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $4,508,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17906,  Location: BET. PENNINGTON AND MYWD (Lat: 32.237506,  Lng: -88.017089),  Route carried "on" structure: State highway 114,  Year Built: 2004,  Status: Open,  Structure Length: 96.62m (316.99ft),  Average Daily Traffic: 790 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,098 (year 2033),  Design Load: HS 20,  Features Intersected: TOMBIGBEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.194,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 22.7m (74.5ft), Horizontal Clearance: 123.4m (404.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 17,  Length of Maximum Span: 123.4m (404.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 96.62m (316.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $23,851,000,  Roadway Improvement Cost: $2,385,000,  Total Project Cost: $26,236,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19112,  Location: 3.7 ml. east of jachin (Lat: 32.212789,  Lng: -88.111292),  Route carried "on" structure: State highway 156,  Year Built: 2020,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 1,860 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,033 (year 2033),  Design Load: HS 20,  Features Intersected: Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.934,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 67.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,857,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,043,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Pennington, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.