  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 213ft / 65.1mTotal length
  • $18,033,000Total costs
  • 13,714Total average daily traffic
  • 1,744Total average daily truck traffic
  • 17,554Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pickensville
  • No street view available for this location

New bridges in Pickensville, AL - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 11970-1979
  • 41980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Truck Traffic in Pickensville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 33.3%Good
  • 41.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 58.3%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 66.7%Good
  • 8.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Excellent
  • 41.7%Very good
  • 16.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3674,  Location: 1.5 MI E PICKENSVILLE (Lat: 33.211083,  Lng: -88.252864),  Route carried "on" structure: State highway 14,  Year Built: 1950,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,574 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,276 (year 2041),  Design Load: H 15,  Features Intersected: Big Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.362,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,243,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,467,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3675,  Location: 2.0 MI E PICKENSVILLE (Lat: 33.206583,  Lng: -88.245783),  Route carried "on" structure: State highway 14,  Year Built: 1950,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,564 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,276 (year 2033),  Design Load: H 15,  Features Intersected: Pine Knot Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.310,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4574,  Location: 4.9 MI NO. SR 86 (Lat: 33.299600,  Lng: -88.265700),  Route carried "on" structure: State highway 14,  Year Built: 1953,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,215 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,791 (year 2036),  Design Load: H 15,  Features Intersected: Coal Fire Creek Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.186,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $912,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4575,  Location: 4.6 MI E MISS ST LINE (Lat: 33.292200,  Lng: -88.264900),  Route carried "on" structure: State highway 14,  Year Built: 1953,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 1,215 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,791 (year 2041),  Design Load: H 15,  Features Intersected: Coal Fire Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.408,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.37m (17.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $1,068,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,175,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4576,  Location: 4.8 MI E MISS ST LINE (Lat: 33.291953,  Lng: -88.264925),  Route carried "on" structure: State highway 14,  Year Built: 1953,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,215 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,791 (year 2036),  Design Load: H 15,  Features Intersected: Coal Fire Creek Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.678,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $912,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1239,  Location: 3.8 MI NORTH OF SR #86 (Lat: 33.292086,  Lng: -88.203511),  Route carried "on" structure: County highway 48,  Year Built: 1980,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2034),  Design Load: H 20,  Features Intersected: WOOLBANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13043,  Location: 0.3 MI E MISS ST LINE (Lat: 33.235100,  Lng: -88.307136),  Route carried "on" structure: State highway 86,  Year Built: 1983,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 1,426 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,891 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.455,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,103,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,313,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13044,  Location: 0.8 MI E MISS ST LINE (Lat: 33.228456,  Lng: -88.302383),  Route carried "on" structure: State highway 86,  Year Built: 1983,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 2,207 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,891 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.315,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.33m (43.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,292,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $3,621,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13356,  Location: 0.3 MI W PICKENSVILLE (Lat: 33.226592,  Lng: -88.272997),  Route carried "on" structure: State highway 86,  Year Built: 1984,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,653 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,221 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,374,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,511,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17326,  Location: 1.5 MI E Pickensville (Lat: 33.237744,  Lng: -88.243478),  Route carried "on" structure: State highway 86,  Year Built: 1999,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 1,165 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,281 (year 2040),  Design Load: HS 20,  Features Intersected: Taylor Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.158,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,459,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,705,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 181,  Location: 4MI.NORTH OF STATE RT.86 (Lat: 33.276625,  Lng: -88.228047),  Route carried "on" structure: County highway 265,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2034),  Design Load: H 20,  Features Intersected: WOOLBANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.884,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 24.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19136,  Location: 0.4 MILES EAST OF SR#14 (Lat: 33.203658,  Lng: -88.232083),  Route carried "on" structure: County highway 195,  Year Built: 2004,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 45 (year 2005),  Average Future Daily Traffic: 70 (year 2030),  Design Load: HS 20,  Features Intersected: PINE KNOT CREEK,  Facility Carried by Structure: HOWARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21123,  Location: 2 Miles South of RT # 17 (Lat: 33.258442,  Lng: -88.228614),  Route carried "on" structure: County highway 240,  Year Built: 2018,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 55 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2034),  Design Load: HS 20,  Features Intersected: Snake Creek,  Facility Carried by Structure: Washington Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $472,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: CEPSAMAL0000002,  Location: 23 M S.E. OF COLUMBUS MS (Lat: 33.213611,  Lng: -88.275767),  Route carried "on" structure: State lands road ,  Year Built: 1978,  Status: Open,  Structure Length: 3.95m (12.96ft),  Average Daily Traffic: 280 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 20,  Features Intersected: ALICEVILLE RR,  Facility Carried by Structure: TOM BEV. L&D ACC.R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete