  • 22Number of bridges
  • 213ft / 64.9mTotal length
  • $52,000Total costs
  • 60,846Total average daily traffic
  • 21,781Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pine Bluffs
  • No street view available for this location

New bridges in Pine Bluffs, WY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 51960-1969
  • 11970-1979
  • 21980-1989
  • 132010-2019
Average Bridge Daily Traffic in Pine Bluffs, WY
Average Bridge Truck Traffic in Pine Bluffs, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 58.3%Very good
  • 8.3%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 16.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 33.3%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: AZQ,  Location: Cheyenne - Pine Bluffs (Lat: 41.158439,  Lng: -104.560528),  Route carried "on" structure: Interstate 80,  Year Built: 1964,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 5,790 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 8,106 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Service Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 603.556,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BAH,  Location: Cheyenne - Pine Bluffs (Lat: 41.167403,  Lng: -104.087544),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 5,278 (year 2021),  Truck Traffic: 46%,  Average Future Daily Traffic: 7,389 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-80 Service Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 644.373,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BAI,  Location: Cheyenne - Pine Bluffs (Lat: 41.167600,  Lng: -104.087800),  Route carried "on" structure: Interstate 80,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 5,362 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 7,507 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-80 Service Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 644.074,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: BAL,  Location: Cheyenne - Pine Bluffs (Lat: 41.176006,  Lng: -104.080603),  Route carried "on" structure: ServiceOther road 921,  Year Built: 1974,  Status: Posted for load,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 2,038 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,853 (year 2041),  Design Load: HS 20,  Features Intersected: Muddy Creek,  Facility Carried by Structure: I-80 Service Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.618,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.69m (31.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $49,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: CRP,  Location: Pine Bluffs - Albin (Lat: 41.365108,  Lng: -104.080500),  Route carried "on" structure: State highway 215,  Year Built: 1947,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 624 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 874 (year 2041),  Design Load: H 15,  Features Intersected: Unnamed Draw
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.239,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: FBF,  Location: Pine Bluffs - Albin (Lat: 41.177178,  Lng: -104.079108),  Route carried "on" structure: State highway 215,  Year Built: 1986,  Status: Open,  Structure Length: 14.97m (49.11ft),  Average Daily Traffic: 713 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 998 (year 2041),  Design Load: HS 20,  Features Intersected: UPRR / US 30
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.288,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 58.5m (191.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MUP,  Location: Pine Bluffs (Lat: 41.174064,  Lng: -104.081225),  Route carried "on" structure: Interstate 80,  Year Built: 2017,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 5,278 (year 2021),  Truck Traffic: 46%,  Average Future Daily Traffic: 7,389 (year 2041),  Design Load: HL 93,  Features Intersected: Muddy Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 645.284,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MUQ,  Location: Cheyenne - Pine Bluffs (Lat: 41.174303,  Lng: -104.081300),  Route carried "on" structure: Interstate 80,  Year Built: 2015,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 4,449 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 6,229 (year 2041),  Design Load: HL 93,  Features Intersected: Muddy Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 644.999,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MUR,  Location: Pine Bluffs (Lat: 41.175692,  Lng: -104.076019),  Route carried "on" structure: Interstate 80,  Year Built: 2017,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 5,278 (year 2021),  Truck Traffic: 46%,  Average Future Daily Traffic: 7,389 (year 2041),  Design Load: HL 93,  Features Intersected: Parsons Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 645.764,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 65.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MUS,  Location: Pine Bluffs (Lat: 41.175894,  Lng: -104.076092),  Route carried "on" structure: Interstate 80,  Year Built: 2015,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 4,449 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 6,229 (year 2041),  Design Load: HL 93,  Features Intersected: Parsons Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 645.482,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MUT,  Location: Pine Bluffs (Lat: 41.174947,  Lng: -104.063061),  Route carried "on" structure: Interstate 80,  Year Built: 2016,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 4,535 (year 2021),  Truck Traffic: 56%,  Average Future Daily Traffic: 6,349 (year 2041),  Design Load: HL 93,  Features Intersected: Beech Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 646.861,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MUV,  Location: Pine Bluffs (Lat: 41.175100,  Lng: -104.063017),  Route carried "on" structure: Interstate 80,  Year Built: 2015,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 4,449 (year 2021),  Truck Traffic: 44%,  Average Future Daily Traffic: 6,229 (year 2041),  Design Load: HL 93,  Features Intersected: Beech Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 646.589,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 4),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NDA,  Location: North of Pine Bluffs (Lat: 41.187408,  Lng: -104.081761),  Route carried "on" structure: State highway 215,  Year Built: 2019,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 713 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 998 (year 2041),  Design Load: HL 93,  Features Intersected: Lodgepole Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.510,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: NDB,  Location: North of Pine Bluffs (Lat: 41.198639,  Lng: -104.081575),  Route carried "on" structure: State highway 215,  Year Built: 2019,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 624 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 874 (year 2041),  Design Load: HL 93,  Features Intersected: Spring Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.757,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: BAH,  Location: Cheyenne - Pine Bluffs (Lat: 41.167403,  Lng: -104.087544),  Route carried "under" structure: ServiceOther road 921,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 2,038 (year 2021),  Truck Traffic: 5%,  Features Intersected: I-80 Service Road,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 1.790,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: BAI,  Location: Cheyenne - Pine Bluffs (Lat: 41.167600,  Lng: -104.087800),  Route carried "under" structure: ServiceOther road 921,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 2,038 (year 2021),  Truck Traffic: 5%,  Features Intersected: I-80 Service Road,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.761,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: FBF,  Location: Pine Bluffs - Albin (Lat: 41.177178,  Lng: -104.079108),  Route carried "under" structure: ServiceOther road 921,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 2,038 (year 2021),  Truck Traffic: 5%,  Features Intersected: UPRR / US 30,  Facility Carried by Structure: WYO 215
Minimum Vertical Clearance: 9.92m (32.55ft),  Kilometerpoint: 0.438,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: MUQ,  Location: Cheyenne - Pine Bluffs (Lat: 41.174303,  Lng: -104.081300),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 5%,  Features Intersected: Muddy Creek,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 6.38m (20.93ft),  Kilometerpoint: 0.253,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Find on map >>   Show street view

Structure Number: MUR,  Location: Pine Bluffs (Lat: 41.175692,  Lng: -104.076019),  Route carried "under" structure: City street 30,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 2,201 (year 2021),  Truck Traffic: 10%,  Features Intersected: Parsons Street,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 5.14m (16.86ft),  Kilometerpoint: 0.011,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: MUS,  Location: Pine Bluffs (Lat: 41.175894,  Lng: -104.076092),  Route carried "under" structure: US 30,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 2,201 (year 2021),  Truck Traffic: 10%,  Features Intersected: Parsons Street,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 646.099,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: MUT,  Location: Pine Bluffs (Lat: 41.174947,  Lng: -104.063061),  Route carried "under" structure: County highway 164-1,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 5%,  Features Intersected: Beech Street,  Facility Carried by Structure: I-80 EBL
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 19.405,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: MUV,  Location: Pine Bluffs (Lat: 41.175100,  Lng: -104.063017),  Route carried "under" structure: County highway 164-1,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 5%,  Features Intersected: Beech Street,  Facility Carried by Structure: I-80 WBL
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 19.422,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)