Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pocono Woodland Lakes, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 128ft / 39.0mTotal length
  • $5,607,000Total costs
  • 99,334Total average daily traffic
  • 18,308Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pocono Woodland Lakes
  • No street view available for this location

New bridges in Pocono Woodland Lakes, PA - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 111960-1969
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Pocono Woodland Lakes, PA
Average Bridge Truck Traffic in Pocono Woodland Lakes, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 10.0%Good
  • 20.0%Satisfactory
  • 50.0%Fair
  • 10.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 10.0%Good
  • 50.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 28.6%Poor
Find on map >>   Show street view

Structure Number: 29804,  Location: DINGMAN TWP 2.3 M W I-84 (Lat: 41.351325,  Lng: -74.876497),  Route carried "on" structure: US 6,  Year Built: 1957,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 8,136 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,127 (year 2032),  Design Load: HS 20,  Features Intersected: SAWKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.157,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Superstructure: Serious,  Substructure: Fair,  Channel: Poor,  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $228,000
Find on map >>   Show street view

Structure Number: 29805,  Location: MILFORD TWP OVER I-84 (Lat: 41.338483,  Lng: -74.837314),  Route carried "on" structure: US 6,  Year Built: 1968,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 8,300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,608 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0084 I-84 EB & WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.143,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.80m (32.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $451,000,  Total Project Cost: $2,067,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29854,  Location: DINGMAN TWP OVER SR 2011 (Lat: 41.340081,  Lng: -74.877117),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 11,004 (year 2021),  Truck Traffic: 26%,  Average Future Daily Traffic: 13,869 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 2011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.524,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $59,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $798,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 29855,  Location: DINGMAN TWP OVER SR 2011 (Lat: 41.340722,  Lng: -74.877622),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 10,739 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,339 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 2011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.480,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $248,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 29966,  Location: DINGMAN TWP .3M N SR 2009 (Lat: 41.305761,  Lng: -74.851453),  Route carried "on" structure: State highway ,  Year Built: 1958,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,696 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,566 (year 2032),  Design Load: HS 20,  Features Intersected: RAYMONDSKILL CREEK,  Facility Carried by Structure: SR 2001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.960,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $177,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29985,  Location: DINGMAN TWP .8M S SR 2001 (Lat: 41.294583,  Lng: -74.846508),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 321 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 378 (year 2032),  Design Load: HS 20,  Features Intersected: RAYMONDSKILL CREEK,  Facility Carried by Structure: SR 2009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.455,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $171,000
Find on map >>   Show street view

Structure Number: 29986,  Location: DINGMAN TWP 500'N SR 2001 (Lat: 41.303331,  Lng: -74.855331),  Route carried "on" structure: State highway ,  Year Built: 1954,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 266 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 389 (year 2032),  Design Load: HS 20,  Features Intersected: RAYMONDSKILL CREEK,  Facility Carried by Structure: SR 2009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.784,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $214,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 29988,  Location: DINGMAN TWP OVER I-84 (Lat: 41.341469,  Lng: -74.904689),  Route carried "on" structure: State highway ,  Year Built: 1966,  Status: Open,  Structure Length: 12.22m (40.09ft),  Average Daily Traffic: 266 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 389 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0084 I-84,  Facility Carried by Structure: SR2009 RAYMONDSKIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.101,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.20m (40.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $122,000,  Roadway Improvement Cost: $358,000,  Total Project Cost: $1,642,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 45426,  Location: MILFORD (Lat: 41.360100,  Lng: -74.855697),  Route carried "on" structure: ServiceState lands road ,  Year Built: 2002,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 100 (year 2016),  Average Future Daily Traffic: 8 (year 2030),  Design Load: HS 20,  Features Intersected: CRAFT BROOK,  Facility Carried by Structure: SCHOCOPEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 47763,  Location: DINGMAN TWP 3 M E TR 739 (Lat: 41.297094,  Lng: -74.908556),  Route carried "on" structure: State highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 3,065 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,917 (year 2033),  Design Load: HL 93,  Features Intersected: DWARFSKILL CREEK,  Facility Carried by Structure: SR 2006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.258,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4320014P,  Location: 2.7 MILES SOUTH OF ROUTE (Lat: 41.287111,  Lng: -74.834222),  Route carried "on" structure: Federal lands road 14,  Year Built: 1955,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,000 (year 2039),  Design Load: HL 93,  Features Intersected: RAYMONDSKILL CREEK,  Facility Carried by Structure: U.S. ROUTE 209
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.451,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $62,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29805,  Location: MILFORD TWP OVER I-84 (Lat: 41.338483,  Lng: -74.837314),  Route carried "under" structure: Interstate 84,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 9,547 (year 2021),  Truck Traffic: 30%,  Features Intersected: SR 0084 I-84 EB & WB,  Facility Carried by Structure: SR 0006 TR 6
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 43.517,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 29805,  Location: MILFORD TWP OVER I-84 (Lat: 41.338483,  Lng: -74.837314),  Route carried "under" structure: Interstate 84,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 10,739 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR 0084 I-84 EB & WB,  Facility Carried by Structure: SR 0006 TR 6
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 43.438,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 29854,  Location: DINGMAN TWP OVER SR 2011 (Lat: 41.340081,  Lng: -74.877117),  Route carried "under" structure: State highway ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 1,706 (year 2021),  Truck Traffic: 2%,  Features Intersected: SR 2011,  Facility Carried by Structure: SR 0084 I-84 EB
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 5.296,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 29855,  Location: DINGMAN TWP OVER SR 2011 (Lat: 41.340722,  Lng: -74.877622),  Route carried "under" structure: State highway ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 1,706 (year 2021),  Truck Traffic: 2%,  Features Intersected: SR 2011,  Facility Carried by Structure: SR 0084 I-84 WB
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 5.914,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 29988,  Location: DINGMAN TWP OVER I-84 (Lat: 41.341469,  Lng: -74.904689),  Route carried "under" structure: Interstate 84,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 11,004 (year 2021),  Truck Traffic: 26%,  Features Intersected: SR 0084 I-84,  Facility Carried by Structure: SR2009 RAYMONDSKIL
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 37.977,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 29988,  Location: DINGMAN TWP OVER I-84 (Lat: 41.341469,  Lng: -74.904689),  Route carried "under" structure: Interstate 84,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 10,739 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR 0084 I-84,  Facility Carried by Structure: SR2009 RAYMONDSKIL
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 37.961,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Discuss Pocono Woodland Lakes, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.