Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pottersville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 171ft / 51.9mTotal length
  • $21,120,000Total costs
  • 41,191Total average daily traffic
  • 5,988Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pottersville
  • No street view available for this location

New bridges in Pottersville, NY - historical statistics
  • New bridges - historical statistics
  • 61960-1969
  • 11990-1999
  • 62010-2019
Average Bridge Daily Traffic in Pottersville, NY
Average Bridge Truck Traffic in Pottersville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 57.1%Good
  • 28.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Excellent
  • 28.6%Very good
  • 42.9%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Excellent
  • 28.6%Very good
  • 42.9%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 80.0%Very good
  • 20.0%Good
Find on map >>   Show street view

Structure Number: 100576,  Location: 0.1 MI SW JCT 9 & I87 (Lat: 43.727369,  Lng: -73.824453),  Route carried "on" structure: US 9,  Year Built: 2016,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 2,394 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,553 (year 2040),  Design Load: HL 93,  Features Intersected: TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.342,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,011,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100577,  Location: 0.5 MI NE JCT 9 & I87 (Lat: 43.727581,  Lng: -73.823733),  Route carried "on" structure: US 9,  Year Built: 1992,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,394 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,553 (year 2040),  Design Load: HS 20,  Features Intersected: TROUT BROOK OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.407,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $444,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1005781,  Location: JCT RTE 9 & I87 (Lat: 43.727472,  Lng: -73.824128),  Route carried "on" structure: Interstate 87,  Year Built: 2012,  Status: Open,  Structure Length: 14.97m (49.11ft),  Average Daily Traffic: 6,818 (year 2009),  Truck Traffic: 26%,  Average Future Daily Traffic: 9,545 (year 2029),  Design Load: HL 93,  Features Intersected: RTE 9, TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.572,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 72.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.96m (49.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,919,000,  Roadway Improvement Cost: $2,295,000,  Total Project Cost: $6,213,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005782,  Location: JCT RTE 9 & I87 (Lat: 43.727533,  Lng: -73.823925),  Route carried "on" structure: Interstate 87,  Year Built: 2013,  Status: Open,  Structure Length: 16.28m (53.41ft),  Average Daily Traffic: 3,880 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 4,621 (year 2040),  Design Load: HL 93,  Features Intersected: RTE 9, TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.572,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 43.0m (141.1ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 16.27m (53.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,192,000,  Roadway Improvement Cost: $2,455,000,  Total Project Cost: $6,647,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033611,  Location: 0.3 MI SE JCT 9 & I87 (Lat: 43.724069,  Lng: -73.821900),  Route carried "on" structure: Interstate 87,  Year Built: 1966,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 6,818 (year 2005),  Truck Traffic: 23%,  Design Load: H 20,  Features Intersected: UPPER VALLEY FARM RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.251,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $659,000,  Total Project Cost: $1,785,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1033612,  Location: 0.3 MI SE JCT 9 & I87 (Lat: 43.724147,  Lng: -73.821658),  Route carried "on" structure: Interstate 87,  Year Built: 1966,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 3,880 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 4,621 (year 2040),  Design Load: H 20,  Features Intersected: UPPER VALLEY FARM RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.251,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $659,000,  Total Project Cost: $1,785,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 103363,  Location: 0.6 MI NW JCT 9 & I87 (Lat: 43.736044,  Lng: -73.825442),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 750 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 799 (year 2040),  Design Load: H 20,  Features Intersected: RTE I87,  Facility Carried by Structure: NATURAL STONE BR R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.1m (98.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,399,000,  Roadway Improvement Cost: $819,000,  Total Project Cost: $2,219,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330522,  Location: 6.5 MI NE OF NORTH CREEK (Lat: 43.755153,  Lng: -73.880661),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 22 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 31 (year 2039),  Design Load: HL 93,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: ALDER BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $641,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $1,016,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005781,  Location: JCT RTE 9 & I87 (Lat: 43.727472,  Lng: -73.824128),  Route carried "under" structure: US 9,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 3,608 (year 2000),  Features Intersected: RTE 9, TROUT BROOK,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 56.267,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 1005782,  Location: JCT RTE 9 & I87 (Lat: 43.727533,  Lng: -73.823925),  Route carried "under" structure: US 9,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 3,608 (year 2000),  Features Intersected: RTE 9, TROUT BROOK,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 56.283,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 1033611,  Location: 0.3 MI SE JCT 9 & I87 (Lat: 43.724069,  Lng: -73.821900),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: UPPER VALLEY FARM RD.,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1033612,  Location: 0.3 MI SE JCT 9 & I87 (Lat: 43.724147,  Lng: -73.821658),  Route carried "under" structure: ServiceOther road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: UPPER VALLEY FARM RD.,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 103363,  Location: 0.6 MI NW JCT 9 & I87 (Lat: 43.736044,  Lng: -73.825442),  Route carried "under" structure: Interstate 87,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 7,019 (year 1998),  Features Intersected: RTE I87,  Facility Carried by Structure: NATURAL STONE BR R
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 58.214,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Discuss Pottersville, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.