Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Prescott, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 161ft / 48.5mTotal length
  • 3,846Total average daily traffic
  • 314Total average daily truck traffic
  • 3,846Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Prescott
  • No street view available for this location

New bridges in Prescott, IA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 21940-1949
  • 41950-1959
  • 101960-1969
  • 21970-1979
  • 11980-1989
  • 12000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.5%Good
  • 23.8%Satisfactory
  • 42.9%Fair
  • 23.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.5%Very good
  • 4.8%Good
  • 23.8%Satisfactory
  • 33.3%Fair
  • 28.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.5%Very good
  • 19.0%Satisfactory
  • 33.3%Fair
  • 14.3%Poor
  • 23.8%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.7%Good
  • 34.8%Satisfactory
  • 47.8%Fair
  • 8.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 964,  Location: 072332306 (Lat: 41.023428,  Lng: -94.610258),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 981 (year 1998),  Average Future Daily Traffic: 981 (year 2040),  Features Intersected: DREY'S DITCH,  Facility Carried by Structure: 2ND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.043,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $4,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9645,  Location: 000000000 (Lat: 41.023444,  Lng: -94.608831),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 430 (year 2012),  Average Future Daily Traffic: 430 (year 2040),  Features Intersected: DREY'S DITCH,  Facility Carried by Structure: 1ST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.060,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $6,000
Find on map >>   Show street view

Structure Number: 13451,  Location: 072332502 (Lat: 41.010861,  Lng: -94.604069),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 450 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 450 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: QUINCE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.357,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $54,000,  Roadway Improvement Cost: $6,000
Find on map >>   Show street view

Structure Number: 13461,  Location: 000000000 (Lat: 41.016922,  Lng: -94.605794),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 450 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 450 (year 2040),  Design Load: HS 20,  Features Intersected: EAST NODAWAY RIVER,  Facility Carried by Structure: QUINCE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.052,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5887,  Location: 071331104 (Lat: 40.963467,  Lng: -94.623781),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 10 (year 2016),  Average Future Daily Traffic: 10 (year 2040),  Design Load: HS 20,  Features Intersected: W BRANCH 102 RIVER,  Facility Carried by Structure: POPLAR AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $58,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 594,  Location: 072320601 (Lat: 41.071425,  Lng: -94.569583),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 20 (year 2016),  Average Future Daily Traffic: 20 (year 2042),  Features Intersected: STREAM,  Facility Carried by Structure: 160TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Serious,  Channel: Poor,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $66,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 59511,  Location: 072321701 (Lat: 41.043353,  Lng: -94.563086),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 6.23m (20.44ft),  Average Daily Traffic: 410 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 410 (year 2038),  Design Load: HL 93,  Features Intersected: EAST NODAWAY RIVER,  Facility Carried by Structure: H33 180TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.122,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5953,  Location: 072321704 (Lat: 41.039603,  Lng: -94.549328),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 25 (year 2016),  Average Future Daily Traffic: 25 (year 2042),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: TULIP AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.764,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Serious,  Channel: Poor,  Operating Rating: 6.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $11,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5954,  Location: 072322001 (Lat: 41.028883,  Lng: -94.563878),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 25 (year 2016),  Average Future Daily Traffic: 25 (year 2042),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: 190TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.773,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $67,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 5961,  Location: 072323102 (Lat: 40.990522,  Lng: -94.585256),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 15 (year 2016),  Average Future Daily Traffic: 15 (year 2042),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: REDWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.103,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Serious,  Channel: Fair,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5971,  Location: 072331201 (Lat: 41.057703,  Lng: -94.593458),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 20 (year 2016),  Average Future Daily Traffic: 20 (year 2040),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: 170TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.775,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $58,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 5972,  Location: 072331201 (Lat: 41.057767,  Lng: -94.589033),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 20 (year 2016),  Average Future Daily Traffic: 20 (year 2040),  Design Load: HS 20,  Features Intersected: MT. ZION BRANCH,  Facility Carried by Structure: 170TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.147,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $66,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 5973,  Location: 072331301 (Lat: 41.043269,  Lng: -94.596919),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 410 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 410 (year 2040),  Design Load: H 15,  Features Intersected: MT. ZION BRANCH,  Facility Carried by Structure: 180TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 12.80m (41.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $18,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 59741,  Location: 072331303 (Lat: 41.028958,  Lng: -94.601700),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 35 (year 2016),  Average Future Daily Traffic: 35 (year 2040),  Design Load: HS 20,  Features Intersected: EAST NODAWAY RIVER,  Facility Carried by Structure: 190TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.561,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 13.00m (42.65ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $18,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5976,  Location: 072331502 (Lat: 41.040117,  Lng: -94.641594),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 45 (year 2016),  Average Future Daily Traffic: 45 (year 2040),  Design Load: HS 20,  Features Intersected: BROWN BRANCH,  Facility Carried by Structure: ORANGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $14,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5977,  Location: 072331602 (Lat: 41.042558,  Lng: -94.660836),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 40 (year 2016),  Average Future Daily Traffic: 40 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: NOTCHWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.206,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $67,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 5981,  Location: 072332101 (Lat: 41.029106,  Lng: -94.656386),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 350 (year 2040),  Design Load: H 15,  Features Intersected: BROWN BRANCH,  Facility Carried by Structure: 190TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.158,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 13.00m (42.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $18,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5982,  Location: 072332103 (Lat: 41.021928,  Lng: -94.656947),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 15 (year 2016),  Average Future Daily Traffic: 15 (year 2040),  Design Load: HS 20,  Features Intersected: BROWN BRANCH,  Facility Carried by Structure: 195TH STREEG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 5985,  Location: 072332702 (Lat: 41.011158,  Lng: -94.641944),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 45 (year 2016),  Average Future Daily Traffic: 45 (year 2040),  Design Load: HS 20,  Features Intersected: EAST NODAWAY RIVER,  Facility Carried by Structure: ORANGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 27.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 23.40m (76.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5994,  Location: 072333403 (Lat: 41.000156,  Lng: -94.623831),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10 (year 2016),  Average Future Daily Traffic: 10 (year 2042),  Features Intersected: STREAM,  Facility Carried by Structure: 210TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.950,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 12.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 59951,  Location: 072333601 (Lat: 41.000075,  Lng: -94.589439),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10 (year 2016),  Average Future Daily Traffic: 10 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: 210TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.844,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $69,000,  Roadway Improvement Cost: $6,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 10814,  Location: 091401901 (Lat: 42.691931,  Lng: -95.607775),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: PERRY CREEK,  Facility Carried by Structure: LOCAL 570TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.674,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10838,  Location: 091411601 (Lat: 42.706303,  Lng: -95.685125),  Route carried "on" structure: County highway ,  Year Built: 1946,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2041),  Features Intersected: ROCK CREEK,  Facility Carried by Structure: LOCAL 560TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.360,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $19,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Prescott, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.