Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Presho, South Dakota (SD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 200ft / 61.0mTotal length
  • $3,468,000Total costs
  • 36,789Total average daily traffic
  • 8,374Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Presho
  • No street view available for this location

New bridges in Presho, SD - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 161970-1979
  • 11980-1989
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Presho, SD
Average Bridge Truck Traffic in Presho, SD
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 53.3%Good
  • 20.0%Satisfactory
  • 26.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 26.7%Satisfactory
  • 26.7%Fair
  • 6.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 46.7%Good
  • 33.3%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 55.6%Good
  • 22.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 43130205,  Location: 3 W US 183 S INTERCH (Lat: 43.898561,  Lng: -100.105811),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 3,950 (year 2021),  Truck Traffic: 24%,  Average Future Daily Traffic: 5,641 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: 303 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.511,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 43130206,  Location: 3 W US 183 S INTERCH (Lat: 43.898281,  Lng: -100.105825),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 3,950 (year 2021),  Truck Traffic: 24%,  Average Future Daily Traffic: 5,641 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: 303 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.511,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 4313517,  Location: 3N & 1.5W of Presho (Lat: 43.948667,  Lng: -100.095558),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 24 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 24 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: Stoney Butte Creek,  Facility Carried by Structure: 238th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 43150186,  Location: 1W & 1.4N of Presho (Lat: 43.924742,  Lng: -100.065994),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 280 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 280 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: Stoney Butte Creek,  Facility Carried by Structure: 305th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 43150193,  Location: 0.2W & 0.7N of Presho (Lat: 43.914786,  Lng: -100.066019),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 60 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 60 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: Medicine Creek,  Facility Carried by Structure: 305th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 43150205,  Location: W PRESHO INTERCHANGE (Lat: 43.898817,  Lng: -100.065681),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 4.25m (13.94ft),  Average Daily Traffic: 3,970 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,669 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: 305 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 362.714,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 43150206,  Location: W PRESHO INTERCHANGE (Lat: 43.898561,  Lng: -100.065669),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 4.25m (13.94ft),  Average Daily Traffic: 3,970 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,669 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: 305 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 362.714,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 43153192,  Location: 0.8N of Presho (Lat: 43.914675,  Lng: -100.059208),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 570 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 570 (year 2032),  Design Load: HS 15,  Features Intersected: Medicine Creek,  Facility Carried by Structure: N. Main Streek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.9m (32.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 18.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 14.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 43159195,  Location: East Edge of Presho (Lat: 43.909483,  Lng: -100.047147),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 55 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 55 (year 2032),  Features Intersected: Medicine Creek,  Facility Carried by Structure: 2nd St. in Presho
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 17.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,633,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $1,663,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 43160204,  Location: 0.1 N JCT I90 (Lat: 43.900211,  Lng: -100.045864),  Route carried "on" structure: ServiceState highway 248,  Year Built: 1947,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 2,265 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,009 (year 2040),  Design Load: H 15,  Features Intersected: CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 385.277,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 43160205,  Location: US 183 INTERCHANGE (Lat: 43.898269,  Lng: -100.045461),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 4,000 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,712 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US183
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 364.372,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 43160206,  Location: US 183 INTERCHANGE (Lat: 43.898061,  Lng: -100.045431),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 4,000 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,712 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US183
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 364.372,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 43161199,  Location: 1E of Presho (Lat: 43.907028,  Lng: -100.044536),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 60 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 60 (year 2032),  Features Intersected: Medicine Creek,  Facility Carried by Structure: Willow St.-Presho
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 18.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,775,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $1,805,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 43161204,  Location: 0.1 E JCT US 183 (Lat: 43.900600,  Lng: -100.045100),  Route carried "on" structure: State highway 248,  Year Built: 2018,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 159 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 225 (year 2041),  Design Load: HL 93,  Features Intersected: CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 385.277,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 43180201,  Location: 3E of Presho (Lat: 43.903850,  Lng: -100.005842),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 60 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 60 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: Medicine Creek,  Facility Carried by Structure: 308th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 43180205,  Location: 2 E US 183 INTERCH (Lat: 43.897450,  Lng: -100.005644),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 4,000 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,712 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: 308 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 367.558,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 43180206,  Location: 2 E US 183 INTERCH (Lat: 43.897169,  Lng: -100.005650),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 4,000 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 5,712 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: 308 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 367.558,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 43130205,  Location: 3 W US 183 S INTERCH (Lat: 43.898561,  Lng: -100.105811),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 25 (year 2020),  Features Intersected: 303 AVE,  Facility Carried by Structure: I090 W
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 43130206,  Location: 3 W US 183 S INTERCH (Lat: 43.898281,  Lng: -100.105825),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 25 (year 2020),  Features Intersected: 303 AVE,  Facility Carried by Structure: I090 E
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 43150205,  Location: W PRESHO INTERCHANGE (Lat: 43.898817,  Lng: -100.065681),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2020),  Features Intersected: 305 AVE,  Facility Carried by Structure: I090 W
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 43150206,  Location: W PRESHO INTERCHANGE (Lat: 43.898561,  Lng: -100.065669),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2020),  Features Intersected: 305 AVE,  Facility Carried by Structure: I090 E
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 43160205,  Location: US 183 INTERCHANGE (Lat: 43.898269,  Lng: -100.045461),  Route carried "under" structure: US 183,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 613 (year 2021),  Truck Traffic: 21%,  Features Intersected: US183,  Facility Carried by Structure: I090 W
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 120.926,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 43160206,  Location: US 183 INTERCHANGE (Lat: 43.898061,  Lng: -100.045431),  Route carried "under" structure: US 183,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 613 (year 2021),  Truck Traffic: 21%,  Features Intersected: US183,  Facility Carried by Structure: I090 E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 120.878,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 43180205,  Location: 2 E US 183 INTERCH (Lat: 43.897450,  Lng: -100.005644),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2020),  Features Intersected: 308 AVE,  Facility Carried by Structure: I090 W
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 43180206,  Location: 2 E US 183 INTERCH (Lat: 43.897169,  Lng: -100.005650),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2020),  Features Intersected: 308 AVE,  Facility Carried by Structure: I090 E
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.1m (43.0ft)

Discuss Presho, South Dakota (SD) on our hugely popular South Dakota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.