Bridge Statistics for Pylesville, Maryland (MD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 157ft / 47.7mTotal length
  • $3,450,000Total costs
  • 34,462Total average daily traffic
  • 2,579Total average daily truck traffic
  • 41,222Total future (year 2026) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pylesville
  • No street view available for this location

New bridges in Pylesville, MD - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 11920-1929
  • 41930-1939
  • 21950-1959
  • 21960-1969
  • 61970-1979
  • 41980-1989
Reconstructed bridges in Pylesville, MD - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Pylesville, MD
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 53.3%Good
  • 26.7%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Very good
  • 35.3%Good
  • 35.3%Satisfactory
  • 23.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 52.9%Good
  • 41.2%Satisfactory
  • 5.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 33.3%Good
  • 52.4%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 10000012001601,  Location: 2.17 MILES S OF MD 165 (Lat: 39.641644,  Lng: -76.412314),  Route carried "on" structure: State highway 24,  Year Built: 1934,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 3,930 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,796 (year 2040),  Design Load: HS 20,  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 30.362,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $274,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10000012001701,  Location: 2.86 MILES S OF MD 165 (Lat: 39.632089,  Lng: -76.411064),  Route carried "on" structure: State highway 24,  Year Built: 1917,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,193 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,061 (year 2026),  Features Intersected: KELLOGG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.252,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $55,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10000012003101,  Location: 0.55 MILE NORTH OF MD 24 (Lat: 39.696439,  Lng: -76.427564),  Route carried "on" structure: State highway 136,  Year Built: 1931,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,161 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,480 (year 2026),  Features Intersected: FALLING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $99,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10000012004301,  Location: 1.89 MILES SOUTH OF MD 24 (Lat: 39.665961,  Lng: -76.441972),  Route carried "on" structure: State highway 165,  Year Built: 1932,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 6,101 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,596 (year 2026),  Design Load: HS 20,  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.051,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $165,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10000012005401,  Location: 1.15 MILES N OF MD 165 (Lat: 39.696189,  Lng: -76.390208),  Route carried "on" structure: State highway 624,  Year Built: 1936,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,920 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,059 (year 2026),  Design Load: H 20,  Features Intersected: BROAD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.850,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $47,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $52,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10000012007803,  Location: 0.29 M S OF COEN ROAD (Lat: 39.646614,  Lng: -76.410189),  Route carried "on" structure: State highway 24,  Year Built: 1986,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 3,193 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,061 (year 2026),  Design Load: HS 20,  Features Intersected: BR OF DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.957,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 10000012007903,  Location: 0.09 M N OF COEN ROAD (Lat: 39.657311,  Lng: -76.407981),  Route carried "on" structure: State highway 24,  Year Built: 1986,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 3,193 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,061 (year 2026),  Design Load: HS 20,  Features Intersected: BR OF DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.467,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 10000012008003,  Location: 0.02 M S OF DAVIS ROAD (Lat: 39.651339,  Lng: -76.410239),  Route carried "on" structure: State highway 24,  Year Built: 1986,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 3,193 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,061 (year 2026),  Design Load: HS 20,  Features Intersected: BR OF DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.196,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 200000H-004301,  Location: 1.0 MILE S OF CHERRY H RD (Lat: 39.628817,  Lng: -76.375256),  Route carried "on" structure: County highway 87,  Year Built: 1955,  Status: Posted for load,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 1,660 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,030 (year 2039),  Design Load: H 20,  Features Intersected: DEER CREEK,  Facility Carried by Structure: GRIER NURSERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.146,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.06m (16.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $495,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000H-009401,  Location: 0.02 MILES NE OF MD 24 (Lat: 39.629894,  Lng: -76.398128),  Route carried "on" structure: County highway 120,  Year Built: 1900,  Year Reconstructed: 1999,  Status: Posted for load,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 559 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 657 (year 2040),  Design Load: H 15,  Features Intersected: DEER CREEK,  Facility Carried by Structure: CHERRY HILL ROAD
Minimum Vertical Clearance: 3.66m (12.01ft),  Kilometerpoint: 6.388,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,800,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,980,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 200000H-009901,  Location: 1.7 MILES S OF MD 165 (Lat: 39.645181,  Lng: -76.427478),  Route carried "on" structure: County highway 82,  Year Built: 1961,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 390 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 687 (year 2039),  Features Intersected: DEER CREEK,  Facility Carried by Structure: ST CLAIR BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.800,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000H-010901,  Location: 0.8 MILES N OF MD 165 (Lat: 39.675056,  Lng: -76.448250),  Route carried "on" structure: County highway 93,  Year Built: 1978,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 978 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,194 (year 2041),  Design Load: HS 20,  Features Intersected: DEER CREEK,  Facility Carried by Structure: FAWN GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 66.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000H-011003,  Location: 0.3 MILES E OF FAWN GR RD (Lat: 39.675031,  Lng: -76.443211),  Route carried "on" structure: County highway 91,  Year Built: 1975,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 113 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 184 (year 2040),  Features Intersected: FALLING BRANCH,  Facility Carried by Structure: RED BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 200000H-013701,  Location: 0.4 MILES N OF MD 543 (Lat: 39.688872,  Lng: -76.373439),  Route carried "on" structure: County highway 102,  Year Built: 1928,  Year Reconstructed: 1998,  Status: Posted for load,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 155 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 190 (year 2039),  Features Intersected: BROAD CREEK,  Facility Carried by Structure: OLD PYLESVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000H-014301,  Location: 0.03 MILES E OF MD 646 (Lat: 39.664367,  Lng: -76.325397),  Route carried "on" structure: County highway 145,  Year Built: 1988,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 418 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 510 (year 2039),  Design Load: HS 20,  Features Intersected: BROAD CREEK,  Facility Carried by Structure: MILL GREEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200000H-014401,  Location: 1.4 MILES SW OF MD 136 (Lat: 39.669556,  Lng: -76.310194),  Route carried "on" structure: County highway 156,  Year Built: 1955,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 155 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 189 (year 2039),  Design Load: HS 20,  Features Intersected: BROAD CREEK,  Facility Carried by Structure: MACTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.158,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $275,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200000H-014801,  Location: 0.5 MILES NE OF MD 543 (Lat: 39.676900,  Lng: -76.348478),  Route carried "on" structure: County highway 121,  Year Built: 1979,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 529 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 646 (year 2041),  Design Load: HS 20,  Features Intersected: BROAD CREEK,  Facility Carried by Structure: HEAPS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.524,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000H-014901,  Location: 0.3 MILES N OF MD 543 (Lat: 39.680194,  Lng: -76.360111),  Route carried "on" structure: County highway 113,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 405 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 495 (year 2041),  Features Intersected: BROAD CREEK,  Facility Carried by Structure: HEAPS SCHOOL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $55,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000H-015001,  Location: 2.2 MILES SW OF MD 136 (Lat: 39.685833,  Lng: -76.366000),  Route carried "on" structure: County highway 111,  Year Built: 1979,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 169 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 206 (year 2041),  Design Load: HS 20,  Features Intersected: BROAD CREEK,  Facility Carried by Structure: RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000H-016601,  Location: 0.7 MI NE OF RED BRIDGE R (Lat: 39.684439,  Lng: -76.437008),  Route carried "on" structure: County highway 92,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 25 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 32 (year 2039),  Design Load: H 20,  Features Intersected: FALLING BRANCH,  Facility Carried by Structure: FALLING BRANCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000H-016701,  Location: 0.6 MI W OF CLERMONT M RD (Lat: 39.688869,  Lng: -76.430400),  Route carried "on" structure: County highway 92,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 22 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 27 (year 2041),  Design Load: H 20,  Features Intersected: FALLING BRANCH,  Facility Carried by Structure: FALLING BRANCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Pylesville, Maryland (MD) on our hugely popular Maryland forum.