Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Quimby, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 207ft / 63.1mTotal length
  • 11,160Total average daily traffic
  • 1,356Total average daily truck traffic
  • 11,160Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Quimby
  • No street view available for this location

New bridges in Quimby, IA - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 21930-1939
  • 21940-1949
  • 11950-1959
  • 21960-1969
  • 71970-1979
  • 11980-1989
  • 11990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Quimby, IA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Truck Traffic in Quimby, IA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Excellent
  • 11.8%Very good
  • 11.8%Good
  • 17.6%Satisfactory
  • 29.4%Fair
  • 17.6%Poor
  • 5.9%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 11.8%Very good
  • 17.6%Good
  • 29.4%Satisfactory
  • 17.6%Fair
  • 11.8%Poor
  • 5.9%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 5.9%Very good
  • 29.4%Good
  • 17.6%Satisfactory
  • 17.6%Fair
  • 11.8%Poor
  • 5.9%Serious
  • 5.9%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.7%Very good
  • 30.4%Good
  • 39.1%Satisfactory
  • 21.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 57.1%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 195,  Location: 2.9 mi. N of jct. SR C66 (Lat: 42.603917,  Lng: -95.676744),  Route carried "on" structure: State highway 31,  Year Built: 1949,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,220 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,220 (year 2040),  Design Load: H 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.670,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 1953,  Location: 1.2 mi W of US 59 (Lat: 42.634050,  Lng: -95.582717),  Route carried "on" structure: State highway 31,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,070 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,070 (year 2040),  Design Load: H 20,  Features Intersected: SILVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.711,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 1954,  Location: 1.0 mi. W of US 59 (Lat: 42.634019,  Lng: -95.574492),  Route carried "on" structure: State highway 31,  Year Built: 1950,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 1,070 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,070 (year 2040),  Design Load: H 20,  Features Intersected: SILVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 6074,  Location: 073340502 (Lat: 41.149356,  Lng: -94.795697),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 5 (year 2016),  Average Future Daily Traffic: 5 (year 2041),  Features Intersected: WILLIAMS CREEK,  Facility Carried by Structure: GROVE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.266,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $79,000,  Roadway Improvement Cost: $8,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 946,  Location: 083350804 (Lat: 42.012583,  Lng: -94.956100),  Route carried "on" structure: County highway ,  Year Built: 1968,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 640 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 640 (year 2040),  Design Load: H 20,  Features Intersected: BRUSHY FORK CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.613,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 107231,  Location: 090400503 (Lat: 42.643606,  Lng: -95.588633),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 30 (year 2019),  Average Future Daily Traffic: 30 (year 2039),  Design Load: HS 20,  Features Intersected: SILVER CREEK,  Facility Carried by Structure: LOCAL- 600TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.393,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.80m (41.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10729,  Location: 090401802 (Lat: 42.606692,  Lng: -95.622925),  Route carried "on" structure: County highway ,  Year Built: 1900,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 45 (year 2019),  Average Future Daily Traffic: 45 (year 2041),  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL- M AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 107301,  Location: 090401901 (Lat: 42.605328,  Lng: -95.621869),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: 630TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.943,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 10732,  Location: 090402002 (Lat: 42.592506,  Lng: -95.603844),  Route carried "on" structure: County highway ,  Year Built: 1937,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 25 (year 2019),  Average Future Daily Traffic: 25 (year 2041),  Features Intersected: BRANCH LITTLE SIOUX,  Facility Carried by Structure: LOCAL- N AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.417,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $13,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 10739,  Location: 090410104 (Lat: 42.639386,  Lng: -95.642225),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 980 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 980 (year 2041),  Design Load: H 20,  Features Intersected: BRANCH LITTLE SIOUX,  Facility Carried by Structure: FM- L AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.792,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 107401,  Location: 090410106 (Lat: 42.634758,  Lng: -95.641983),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 11.34m (37.20ft),  Average Daily Traffic: 1,260 (year 2019),  Average Future Daily Traffic: 1,260 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE SIOUX RIVER,  Facility Carried by Structure: FM- L AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.279,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Inventory Rating: 61.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.20m (122.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10741,  Location: 090410401 (Lat: 42.648039,  Lng: -95.693744),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2041),  Features Intersected: ROCK CREEK,  Facility Carried by Structure: LOCAL- 600TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.652,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 18.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107451,  Location: 090410901 (Lat: 42.633281,  Lng: -95.684078),  Route carried "on" structure: County highway ,  Year Built: 1976,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 260 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 260 (year 2041),  Design Load: H 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: FM- 610TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.413,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 107461,  Location: 090411005 (Lat: 42.624108,  Lng: -95.677614),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2041),  Design Load: H 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: FM-SIMONSEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.591,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.90m (42.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 107471,  Location: 090411302 (Lat: 42.611278,  Lng: -95.642239),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 290 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 290 (year 2039),  Design Load: H 20,  Features Intersected: BRANCH LITTLE SIOUX RIVE,  Facility Carried by Structure: FM- L AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.535,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 10753,  Location: 090412602 (Lat: 42.577586,  Lng: -95.662267),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL- K AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.777,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 108191,  Location: 091402901 (Lat: 42.677456,  Lng: -95.603047),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 29%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: H 20,  Features Intersected: PERRY CREEK,  Facility Carried by Structure: FM 580TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.058,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 108201,  Location: 091402905 (Lat: 42.669689,  Lng: -95.594986),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2039),  Design Load: HS 20,  Features Intersected: PERRY CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.366,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 108211,  Location: 091402908 (Lat: 42.667411,  Lng: -95.590478),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 750 (year 2041),  Design Load: H 20,  Features Intersected: PERRY CREEK,  Facility Carried by Structure: FM RIVER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.333,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 108221,  Location: 091403103 (Lat: 42.651539,  Lng: -95.619775),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 750 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH LITTLE SIOUX RIVE,  Facility Carried by Structure: FM RIVER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.272,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10842,  Location: 091412202 (Lat: 42.683800,  Lng: -95.681622),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1955,  Status: Closed,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2039),  Features Intersected: ROCK CREEK,  Facility Carried by Structure: FM J AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.682,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Fair,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 13.00m (42.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $37,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10843,  Location: 091412801 (Lat: 42.677383,  Lng: -95.683097),  Route carried "on" structure: County highway ,  Year Built: 1917,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5 (year 2019),  Average Future Daily Traffic: 5 (year 2041),  Features Intersected: ROCK CREEK,  Facility Carried by Structure: LOCAL 580TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 19.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $18,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10846,  Location: 091413301 (Lat: 42.662914,  Lng: -95.690097),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 45 (year 2019),  Average Future Daily Traffic: 45 (year 2041),  Design Load: H 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: FM 590TH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.263,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6073,  Location: 0.5 Mi,South,US#30 (Lat: 42.003386,  Lng: -92.785256),  Route carried "on" structure: State highway 146,  Year Built: 2019,  Status: Open,  Structure Length: 8.74m (28.67ft),  Average Daily Traffic: 2,420 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,420 (year 2041),  Design Load: HL 93,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.397,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Quimby, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.